# 002005234166
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-11, duration: 15
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 002005225855
Unscheduled inspection
Start date: 2020-11-26, end date: —, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002005199125
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-30, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrol ispolneniya yuridicheskim licom ranee vydannogo predpisaniya ot 04082020 521934plP02232020 ob ustranenii narushenii pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva zadachei nastoyaschei proverki yavlyaetsya ustanovlenie faktov vypolneniyanevypolneniya PAO «MOSTOTREST» vysheukazannogo predpisaniyaPredmetom nastoyaschei proverki yavlyaetsya ispolnenie PAO «MOSTOTREST» Predpisaniya ob ustranenii vyyavlennyh narushenii
# 002004450920
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-07-24, duration: 10
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction reconstruction of a capital construction facility the task of this audit is to prevent identify and suppress violations of the legislation on urban development, including technical ones, committed by the developer, the technical customer, as well as the person carrying out the reconstruction on the basis of an agreement with the developer or the technical customer regulations and design documentation requirements for energy conservation and energy efficiency improvement The subject of this audit is the compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation including energy efficiency requirements with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with devices accounting for used energy resourcescompliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 002004314255
Unscheduled inspection
Start date: 2020-03-06, end date: 2020-03-13, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrol ispolneniya yuridicheskim licom ranee vydannogo predpisaniyazadachei nastoyaschei proverki yavlyaetsya ustanovlenie faktov vypolneniyanevypolneniya PAO «MOSTOTREST» vysheukazannogo predpisaniya Predmetom nastoyaschei proverki yavlyaetsya ispolnenie PAO «MOSTOTREST» Predpisaniya ob ustranenii vyyavlennyh narushenii
# 002004331486
Unscheduled inspection
Start date: 2020-03-03, end date: 2020-03-31, duration: —
Authority: Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora po Krasnodarskomu krayu i Respublike Adygeya Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: assessment of compliance of the activities carried out by a legal entity for the maintenance of a public highway of federal significance with the mandatory requirements of regulatory legal and regulatory technical acts standards and norms based on the results of the inspection act assessment of compliance of activities with mandatory requirements of legislation in the field of safety of highways to prevent harm to life and health of citizens
# 002004368201
Unscheduled inspection
Start date: 2020-03-20, end date: 2020-04-16, duration: —
Authority: Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora po Krasnodarskomu krayu i Respublike Adygeya Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: The objectives of this audit are to assess the fulfillment by a legal entity of an instruction to eliminate violations of mandatory requirements of legislation on road activity, taking measures provided for by the legislation of the Russian Federation to suppress and or eliminate identified violations of mandatory requirements, compliance with the instructions of state control and supervision bodies
# 002004232908
Unscheduled inspection
Start date: 2020-01-28, end date: 2020-01-29, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 002004189458
Unscheduled inspection
Start date: 2020-01-13, end date: 2020-01-17, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrol ispolneniya yuridicheskim licom ranee vydannogo predpisaniya zadachei nastoyaschei proverki yavlyaetsya ustanovlenie faktov vypolneniyanevypolneniya PAO «MOSTOTREST» vysheukazannogo predpisaniya Predmetom nastoyaschei proverki yavlyaetsya ispolnenie PAO «MOSTOTREST» Predpisaniya ob ustranenii vyyavlennyh narushenii
# 002004217972
Unscheduled inspection
Start date: 2020-01-21, end date: —, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 002004220417
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903892591
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-11, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Kontrol ispolneniya yuridicheskim licom ranee vydannogo predpisaniya Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie faktov vypolneniyanevypolneniya PAO «MOSTOTREST» vysheukazannogo predpisaniyaPredmetom nastoyaschei proverki yavlyaetsya ispolnenie PAO «MOSTOTREST» Predpisaniya ob ustranenii vyyavlennyh narushenii
# 001903892495
Unscheduled inspection
Start date: 2019-11-05, end date: 2019-11-11, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Kontrol ispolneniya yuridicheskim licom ranee vydannogo predpisaniya Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie faktov vypolneniyanevypolneniya PAO «MOSTOTREST» vysheukazannogo predpisaniyaPredmetom nastoyaschei proverki yavlyaetsya ispolnenie PAO «MOSTOTREST» Predpisaniya ob ustranenii vyyavlennyh narushenii
# 001903809612
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-21, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka provoditsya s celyu kontrolya ispolneniya PAO «MOSTOTREST» ranee vydannogo predpisaniya ob ustranenii vyyavlennyh narushenii ot 12072019 521435plP00662019 dalee Predpisanie Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie faktov vypolneniya nevypolneniya PAO «MOSTOTREST» Predpisaniya Predmetom nastoyaschei proverki yavlyaetsya vypolnenie PAO «MOSTOTREST» Predpisaniya
# 001903601275
Unscheduled inspection
Start date: 2019-09-18, end date: 2019-09-24, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to prevent violations of legislation on urban development activities, including project documentation. The objectives of this audit are to monitor the measures taken to comply with the mandatory requirements of legislation on urban development by a legal entity during the construction reconstruction of a capital construction facility, to prevent the identification and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation and to take measures to eliminate violations of mandatory requirements in the event of their identification and bringing to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts7 The subject of this audit is the compliance of the work performed and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation including energy efficiency requirements with the exception of capital construction facilities for which the requirements of energy efficiency efficiency does not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources, as well as permits for construction to comply with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903001917
Unscheduled inspection
Start date: 2019-09-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902924755
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration: —
Authority: Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora po Krasnodarskomu krayu i Respublike Adygeya Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: The objectives of this audit are to assess the fulfillment by a legal entity of an instruction to eliminate violations of mandatory requirements of legislation on road activity, taking measures provided for by the legislation of the Russian Federation to suppress and or eliminate identified violations of mandatory requirements, compliance with the instructions of state control and supervision bodies
# 001902926864
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-06, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisaniya ot 14 marta 2019 g 209G3320vnppZadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom merami po ispolneniyu predpisaniya i soblyudeniyu obyazatelnyh trebovanii zakonodatelstva o gradostroitelnoi deyatelnosti pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstvaprinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic dopustivshih narusheniya trebovanii Federalnyh zakonov i inyh normativnyh pravovyh aktovpredmetom proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo kontrolya nadzora
# 001902905852
Unscheduled inspection
Start date: 2019-07-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902737933
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-05-31, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrol sootvetstviya vypolnyaemyh rabot obyazatelnym trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov i inyh normativnopravovyh aktov zadachei nastoyaschei proverki yavlyaetsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom tehnicheskim zakazchikom a takzhe licom osuschestvlyayuschim rekonstrukciyu na osnovanii dogovora s zastroischikom ili tehnicheskim zakazchikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii trebovanii po energosberezheniyu i povysheniyu energeticheskoi effektivnostiPredmetom nastoyaschei proverki yavlyaetsyasootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti za isklyucheniem obektov kapitalnogo stroitelstva na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovvypolnenie trebovanii ustanovlennyh chastyami 2 3 i 31 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii
# 001902549365
Unscheduled inspection
Start date: 2019-03-13, end date: 2019-03-14, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 21112018 g 846G3320vnpp
# 001801998849
Unscheduled inspection
Start date: 2018-11-20, end date: 2018-11-21, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 06082018 g 596G3327vnpp
# 001802000065
Unscheduled inspection
Start date: 2018-10-12, end date: 2018-11-09, duration: —
Authority: SeveroKavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverki svedenii izlozhennyh v pisme postupivshim iz Upravleniya Federalnoi Sluzhby bezopasnosti Rossiiskoi Federacii po Krasnodarskomu krayu ot 05102018 3896304 v SeveroKavkazskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru vh POKr64363 ot 05102018 i motivirovannom predstavlenii io nachalnika Tamanskogo territorialnogo otdela AA Rudenko ot 08102018 o narusheniyah trebovanii zakonodatelstva Rossiiskoi Federacii v sfere gradostroitelnoi deyatelnosti pri osuschestvlenii stroitelstva obekta kapitalnogo stroitelstva a takzhe vozniknoveniya ugrozy prichineniya vreda zhizni zdorovyu grazhdan pri stroitelstve obekta kapitalnogo stroitelstva «Stroitelstvo transportnogo perehoda cherez Kerchenskii proliv» 2 etap raspolozhennogo po adresu Krasnodarskii krai Temryukskii raion Respublika Krym g Kerch
# 001800174752
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-03-21, duration: —
Authority: Centralnoe Upravlenie Gosudarstvennogo rechnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: Proverka ispolneniya PAO «Mostotrest» trebovanii zakonodatelstva Rossiiskoi Federacii v oblasti obespecheniya bezopasnosti plavaniya pri ekspluatacii teplohoda «Taifun»
# 001800104244
Unscheduled inspection
Start date: 2018-01-12, end date: 2018-01-16, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 27092017 g 532G3327K90
# 00170802791715
Unscheduled inspection
Start date: 2017-10-09, end date: —, duration: —
Authority: VolzhskoOkskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170802605488
Unscheduled inspection
Start date: 2017-09-07, end date: 2017-09-20, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyukontrolya ispolneniya predpisaniya ot 24 iyulya 2017 g 324412zadachami nastoyaschei proverki yavlyayutsyaosuschestvlenie kontrolya za prinyatymi yuridicheskim licom individualnym predprinimatelem merami po ispolneniyu predpisaniyaprinyatie mer po ustraneniyu narushenii obyazatelnyh trebovanii v sluchae ih vyyavleniya i po privlecheniyu k otvetstvennosti lic ne obespechivshih ispolnenie predpisaniyaPredmetom nastoyaschei proverki yavlyayutsya vypolnenie predpisaniya organov gosudarstvennogo kontrolya nadzora
# 00170701743679
Unscheduled inspection
Start date: 2017-07-10, end date: 2017-07-12, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrol ispolneniya predpisaniya ot 09062016 271G3327vnpp
# 00170701693989
Unscheduled inspection
Start date: 2017-05-24, end date: 2017-05-31, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated March 15, 2017 85 "On inspections of organizations operating tower cranes" on the basis of the instruction of the Deputy Chairman of the Government of the Russian Federation AG Khloponin dated February 8, 2017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations from 2017 to 2019 operating tower cranes"The objectives of this audit are 1 to prevent identify and suppress violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements 2 to take measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have violated the requirements of federal laws and other regulatory legal acts by the subject of this audit compliance by a legal entity in the course of carrying out its activities with mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices of lifting cranes used at hazardous production facilities compliance with the specified requirements of buildings premises structures equipment and materials used as well as requirements for machinery and equipment and related requirements for These products are used and disposed of
# 00170701550961
Unscheduled inspection
Start date: 2017-04-18, end date: 2017-05-18, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Moskve
Purpose of inspection: Verification of the execution of the order to eliminate violations of land legislation The tasks of the audit are to prevent identify and suppress violations of the requirements established by land legislation
# 00170701550989
Unscheduled inspection
Start date: 2017-04-18, end date: 2017-05-18, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Moskve
Purpose of inspection: Verification of the execution of the order to eliminate violations of land legislation The tasks of the audit are to prevent identify and suppress violations of the requirements established by land legislation
# 00170701476697
Unscheduled inspection
Start date: 2017-04-07, end date: 2017-04-11, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 09062016 g 271G3327vnpp
# 00170701294869
Unscheduled inspection
Start date: 2017-01-11, end date: 2017-01-12, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ispolneniya predpisaniya ot 09062016 g 271G3327vnpp
# 00160700062553
Unscheduled inspection
Start date: 2016-08-17, end date: 2016-08-17, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: checking the prescription
# 00160601687351
Unscheduled inspection
Start date: 2016-06-23, end date: 2016-06-24, duration: —
Authority: Federalnaya sluzhba po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrol ispolneniya yuridicheskim licom predpisaniya vydannogo Centralnym upravleniem Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
# 00150601271273
Unscheduled inspection
Start date: 2015-11-09, end date: —, duration: —
Authority: VerhneDonskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00150600333125
Unscheduled inspection
Start date: 2015-09-01, end date: 2015-09-08, duration: —
Authority: VerhneDonskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka informacii izlozhennoi v obraschenii zhitelya Voronezhskoi oblasti postupivshego v VerhneDonskoe upravlenie Rostehnadzora vh V120247 ot 17082015 o narusheniyah trebovanii promyshlennoi bezopasnosti predstavlyayuschih ugrozu zhizni i zdorovyu lyudei dopuskaemyh pri provedenii stroitelnyh rabot s ispolzovaniem gruzopodemnyh kranov
# 772101522073
Unscheduled inspection
Start date: 2021-12-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101332385
Unscheduled inspection
Start date: 2021-11-15, end date: 2021-11-26, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision
# 772101180052
Unscheduled inspection
Start date: 2021-10-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772101141049
Unscheduled inspection
Start date: 2021-10-07, end date: 2021-10-11, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772101141053
Unscheduled inspection
Start date: 2021-10-04, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772101180051
Unscheduled inspection
Start date: 2021-10-18, end date: 2021-10-20, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 772100562045
Unscheduled inspection
Start date: 2021-09-27, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772100352794
Unscheduled inspection
Start date: 2021-07-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100352795
Unscheduled inspection
Start date: 2021-07-14, end date: 2021-07-23, duration: 8
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 522100303260
Unscheduled inspection
Start date: 2021-06-21, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Nizhegorodskoi oblasti
Purpose of inspection: order
# 772100217831
Unscheduled inspection
Start date: 2021-05-19, end date: 2021-02-18, duration: 3
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to prevent violations of the legislation on urban planning activities, including project documentation.
The objectives of this audit are:
to monitor the measures taken by a legal entity to comply with the mandatory requirements of legislation
on urban development activities during construction and reconstruction of a capital construction facility;
prevention, detection and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation;
taking measures to eliminate violations of mandatory requirements
(if they are identified) and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts.
7. The subject of this audit is:
the compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved
in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Articles 49 of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources;
availability of a building permit;
meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation
# 772100217807
Unscheduled inspection
Start date: 2021-05-18, end date: 2021-02-18, duration: 3
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to prevent violations of the legislation on urban planning activities, including project documentation.
The objectives of this audit are:
to monitor the measures taken by a legal entity to comply with the mandatory requirements of legislation
on urban development activities during construction and reconstruction of a capital construction facility;
prevention, detection and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation;
taking measures to eliminate violations of mandatory requirements
(if they are identified) and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts.
7. The subject of this audit is:
the compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved
in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Articles 49 of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources;
availability of a building permit;
meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation
# 772100217827
Unscheduled inspection
Start date: 2021-05-18, end date: 2021-02-18, duration: 3
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to prevent violations of the legislation on urban planning activities, including project documentation.
The objectives of this audit are:
to monitor the measures taken by a legal entity to comply with the mandatory requirements of legislation
on urban development activities during construction and reconstruction of a capital construction facility;
prevention, detection and suppression of violations of mandatory requirements established by Federal laws and other regulatory acts of the Russian Federation;
taking measures to eliminate violations of mandatory requirements
(if they are identified) and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts.
7. The subject of this audit is:
the compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved
in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Articles 49 of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices for used energy resources;
availability of a building permit;
meeting the requirements set out in Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation
# 632100154902
Unscheduled inspection
Start date: 2021-05-05, end date: 2021-05-14, duration: 7
Authority: Ministerstvo lesnogo hozyaistva, ohrany okruzhayuschei sredy i prirodopolzovaniya Samarskoi oblasti
Purpose of inspection: execution of a previously issued order on the elimination of violations of forest legislation
# 632100252202
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration: 3
Authority: Sredne-Povolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu kontrolya ispolneniya predpisaniya ot 22 marta 2021 g. № 11-485-03-21-022-V.
Zadachami nastoyaschei proverki yavlyayutsya ustanovlenie faktov vypolneniya (ne vypolneniya) predpisaniya ot 22 marta 2021 g. № 11-485-03-21-022-V
Predmetom nastoyaschei proverki yavlyaetsya proverka vypolneniya predpisaniya ot 22 marta 2021 g. № 11-485-03-21-022-V
# 772100160061
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-30, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision
# 232100101434
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-30, duration: 20
Authority: Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora po Krasnodarskomu krayu i Respublike Adygeya Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection:
-proverka vypolneniya predpisaniya ob ustranenii narushenii;
- ocenka vypolneniya yuridicheskim licom predpisaniya ob ustranenii narushenii obyazatelnyh trebovanii zakonodatelstva o dorozhnoi deyatelnosti; prinyatie predusmotrennyh zakonodatelstvom Rossiiskoi Federacii mer po presecheniyu i (ili) ustraneniyu vyyavlennyh narushenii obyazatelnyh trebovanii;
-vypolnenie predpisanii organov gosudarstvennogo kontrolya (nadzora)
# 772100085688
Unscheduled inspection
Start date: 2021-03-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772100007032
Unscheduled inspection
Start date: 2021-02-15, end date: 2021-02-19, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor
# 762105342408
Unscheduled inspection
Start date: 2021-01-11, end date: 2021-02-22, duration: —
Authority: Gosudarstvennaya inspekciya truda v YAroslavskoi oblasti
Purpose of inspection: 1
# 002005283957
Unscheduled inspection
Start date: 2020-12-14, end date: 2020-12-25, duration: 10
Authority: SrednePovolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention and prevention of accidents during the operation of lifting facilities
# 002005289861
Unscheduled inspection
Start date: 2020-12-29, end date: 2021-02-02, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 002005289873
Unscheduled inspection
Start date: 2020-12-29, end date: 2021-02-02, duration: 20
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 772005265071
Unscheduled inspection
Start date: 2020-12-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005259650
Unscheduled inspection
Start date: 2020-12-10, end date: 2020-12-16, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrolya ispolneniya yuridicheskim licom ranee vydannogo predpisaniya ot 30 oktyabrya 2020 g 522771plP03242020 ob ustranenii narushenii pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva zadachei nastoyaschei proverki yavlyaetsya ustanovlenie faktov vypolneniyanevypolneniya PAO «MOSTOTREST» vysheukazannogo predpisaniyaPredmetom nastoyaschei proverki yavlyaetsya ispolnenie PAO «MOSTOTREST» Predpisaniya ob ustranenii vyyavlennyh narushenii
# 772005227386
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772005225777
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005215004
Unscheduled inspection
Start date: 2020-11-16, end date: 2020-12-04, duration: 15
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of compliance of the work performed with the mandatory requirements of the design documentation, including energy efficiency requirements and requirements for equipment of the capital construction facility with metering devices for energy resources used and other regulatory legal acts during the construction of the capital construction facility, the task of this audit is to prevent identify and suppress violations committed by the developer, the technical customer, as well as the person carrying out reconstruction on the basis of an agreement with the developer or the technical customer legislation on urban planning activities, including design documentation of requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made in the design documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit to comply with the requirements established by parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 772005237740
Unscheduled inspection
Start date: 2020-11-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 002005234166
Unscheduled inspection
Start date: 2020-11-23, end date: 2020-12-11, duration: 15
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this inspection is carried out in accordance with the notice of completion of construction reconstruction of the capital construction facility in order to control the compliance of the completed works with the mandatory requirements of the design documentation requirements for energy conservation and energy efficiency improvement and other regulatory legal acts during the construction of the capital construction facility the task of this inspection is to prevent identify and suppress the mistakes made by the developer the technical customer as well as the person carrying out construction on the basis of an agreement with a developer or a technical customer for violations of legislation on urban planning activities, including design documentation requirements for energy conservation and energy efficiency improvement, the subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements approved in accordance with parts 15 152 and 153 of Article 48 of this Urban Planning Code project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used
# 772005208921
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-30, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005207294
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-13, duration: 9
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005196152
Unscheduled inspection
Start date: 2020-11-09, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 002005225855
Unscheduled inspection
Start date: 2020-11-26, end date: 2020-11-27, duration: 2
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: this check is carried out in order to control the execution by a legal entity of a previously issued prescription. The task of this check is to eliminate the facts of compliance with the previously issued prescription. The subject of this check is the execution of an instruction to eliminate identified violations
# 772005225781
Unscheduled inspection
Start date: 2020-11-13, end date: 2020-12-10, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 772005141409
Unscheduled inspection
Start date: 2020-10-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005145645
Unscheduled inspection
Start date: 2020-10-02, end date: 2020-10-22, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the inspection are to carry out control measures in connection with the implementation of the inspection program. The objectives of the inspection are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the person being checked. The subject of the inspection is the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code. The conformity of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work requirements of the project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance with the requirements of the project documentation identified during construction control and state construction supervision
# 772005201383
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005200641
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-11-13, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of project documentation identified during construction control and state construction supervision
# 002005199125
Unscheduled inspection
Start date: 2020-10-26, end date: 2020-10-30, duration: 5
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrol ispolneniya yuridicheskim licom ranee vydannogo predpisaniya ot 04082020 521934plP02232020 ob ustranenii narushenii pri stroitelstve rekonstrukcii obekta kapitalnogo stroitelstva zadachei nastoyaschei proverki yavlyaetsya ustanovlenie faktov vypolneniyanevypolneniya PAO «MOSTOTREST» vysheukazannogo predpisaniyaPredmetom nastoyaschei proverki yavlyaetsya ispolnenie PAO «MOSTOTREST» Predpisaniya ob ustranenii vyyavlennyh narushenii
# 772005184865
Unscheduled inspection
Start date: 2020-10-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 502005195444
Unscheduled inspection
Start date: 2020-10-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005181714
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772005208488
Unscheduled inspection
Start date: 2020-10-30, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004473572
Unscheduled inspection
Start date: 2020-08-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004510573
Unscheduled inspection
Start date: 2020-08-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004489106
Unscheduled inspection
Start date: 2020-08-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004474887
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004471745
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004465518
Unscheduled inspection
Start date: 2020-08-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004494254
Unscheduled inspection
Start date: 2020-08-19, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004486987
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-28, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for used energy resources
# 772004480849
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004479442
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-24, duration: 11
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the inspection are to carry out control measures in connection with the implementation of the inspection program. The objectives of the inspection are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the person being checked. The subject of the inspection is the fulfillment by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code. The conformity of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work the requirements of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources
# 772004479035
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-28, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for used energy resources
# 772004445608
Unscheduled inspection
Start date: 2020-08-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004466348
Unscheduled inspection
Start date: 2020-07-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004466387
Unscheduled inspection
Start date: 2020-07-27, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004443893
Unscheduled inspection
Start date: 2020-07-02, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004445430
Unscheduled inspection
Start date: 2020-07-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 772004460036
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004460035
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration: —
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:
# 772004460002
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration: —
Authority: —
Purpose of inspection: