# 752101528126
Unscheduled inspection
Start date: 2021-12-02, end date: 2021-12-29, duration: 20
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out an unscheduled inspection, on the basis of a letter on the completion of the construction of the facility dated 11/30/2021 No. 16/8492-21, ex. No. 16/8492-21 in accordance with the inspection program dated 11/30/2021, prevention, identification and suppression of violations committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter – the contractor), violations of legislation on urban development, including project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 752101417699
Unscheduled inspection
Start date: 2021-12-02, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection:
# 752101485834
Unscheduled inspection
Start date: 2021-12-16, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: The purpose of the inspection is to conduct an unscheduled inspection, based on a notice of completion of construction (reconstruction) of the capital construction facility of the VH. dated 13.12.2021 No. 16/8881-21.
The objectives of this audit are to prevent, identify and suppress violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor).
The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts.
# 752101367925
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 752101497732
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 752101350238
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection:
# 752101338159
Unscheduled inspection
Start date: 2021-10-18, end date: 2021-10-29, duration: 10
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out an unscheduled inspection, on the basis of a notice on the completion dates of works subject to inspection dated October 12, 2021 No. 16/7052-21 (ex. dated October 12, 2021 No. 16/7052-21), prevention, identification and suppression of violations committed by the developer, the customer, as well as by a person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor), violations of legislation on urban planning activities, including project documentation., compliance with mandatory requirements or requirements established by municipal legal acts
# 752101219078
Unscheduled inspection
Start date: 2021-10-18, end date: —, duration: 10
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: this check is carried out in order to:
-carrying out an unscheduled inspection, based on the notification of the completion dates of the works to be inspected dated October 12, 2021 No. 16/7052-21 (ex. dated October 12, 2021 No. 16/7052-21).
the objectives of this inspection are:
- prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor).
The subject of this review is:
- compliance with mandatory requirements or requirements established by municipal legal acts
# 752101157664
Unscheduled inspection
Start date: 2021-09-27, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection:
# 752101339104
Unscheduled inspection
Start date: 2021-07-14, end date: 2021-07-27, duration: 10
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out an unscheduled inspection, according to the inspection program dated July 09, 2021, prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and project documentation committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor)., compliance with mandatory requirements or requirements established by municipal legal acts
# 752100352711
Unscheduled inspection
Start date: 2021-07-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 752100339934
Unscheduled inspection
Start date: 2021-07-08, end date: —, duration: 3
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Conducting an unscheduled inspection, based on the notification of the start of construction of the facility dated 04/13/2021 No. 16/2258-21, ex. No. 16/2258-21 in accordance with the inspection program dated 04/15/2021, prevention, detection and suppression of violations committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer legislation on urban planning activities, including project documentation, compliance with mandatory requirements or requirements established by municipal legal acts.
# 752100339834
Unscheduled inspection
Start date: 2021-07-08, end date: —, duration: 3
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Carrying out an unscheduled inspection, based on the notification of the start of construction of the facility dated 04/09/2021 No. 23, ex. No. 2331 in accordance with the inspection program dated 04/12/2021, prevention, detection and suppression of violations of the legislation on urban development activities committed by the developer, technical customer, as well as by a person carrying out construction on the basis of an agreement with the developer or technical customer, including project documentation, compliance with mandatory requirements or requirements established by municipal legal acts.
# 752100337304
Unscheduled inspection
Start date: 2021-07-05, end date: —, duration: 2
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of the execution of Regulation No. 161/21 dated June 16, 2021 on the basis of the notice of elimination of violations dated June 29, 2021 No. 16/3980-21
# 752100283801
Unscheduled inspection
Start date: 2021-06-15, end date: —, duration: 2
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Conducting an unscheduled inspection, based on a reasoned submission dated June 07, 2021 and publication on the website of the ZAB information portal.EN in the article: "The excavation at the KSK can be a threat to children."
# 752100323354
Unscheduled inspection
Start date: 2021-06-29, end date: —, duration: 10
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Conducting an unscheduled on-site inspection on the basis of the notice of completion of construction dated June 21, 2021 No. 12/3679–21 (ex. dated June 21, 2021 No. 4513); prevention, identification and suppression of violations committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor), violations of legislation on urban development, including technical regulations, and project documentation; compliance with mandatory requirements or requirements established by municipal legal acts.
# 752100264397
Unscheduled inspection
Start date: 2021-06-07, end date: —, duration: 5
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Carrying out an unscheduled inspection, based on the notice of the beginning of construction dated 02.02.2021, vh. No. 585 in accordance with the inspection program dated 03.02.2021, prevention, detection and suppression of violations of the legislation on urban development committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, including project documentation, compliance with mandatory requirements or requirements established by municipal legal acts.
# 752100383049
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-30, duration: 20
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out an unscheduled inspection, on the basis of notices on the elimination of violations dated 04/15/2021, vh. No. 16/2351-21, prevention, detection and suppression of violations of the legislation on urban development, including design, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor) documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 752100164158
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-30, duration: 10
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Carrying out an unscheduled inspection, on the basis of notices on the elimination of violations dated 04/15/2021, ex. No. 16/2351-21, prevention, detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, technical customer, as well as by a person carrying out construction on the basis of an agreement with the developer or technical customer, compliance mandatory requirements or requirements established by municipal legal acts.
# 752101435623
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-23, duration: 10
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an unscheduled inspection, based on the notice of the beginning of construction, reconstruction of the capital construction facility dated March 16, 2021 No. 17/1496-21 (ex. dated March 16, 2021 No. 17/1496-21), the inspection program dated March 23, 2021, prevention, identification and suppression of violations committed by the developer, the customer, as well as the person, carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor), violations of the legislation on urban development, including project documentation., compliance with mandatory requirements or requirements established by municipal legal acts
# 752100101335
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-14, duration: 3
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Carrying out an unscheduled inspection, on the basis of a notice on the completion dates of works subject to inspection dated 03/18/2021, vh. No. 16/1591-21 in accordance with the inspection program dated 02/03/2021, prevention, identification and suppression of violations committed by the developer, technical customer, as well as by a person carrying out construction on the basis of an agreement with the developer or technical customer violations of legislation on urban development, including project documentation, compliance with mandatory requirements or requirements established by municipal legal acts.
# 752100141876
Unscheduled inspection
Start date: 2021-04-12, end date: 2021-04-23, duration: 10
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Conducting a scheduled inspection, preventing, identifying and suppressing violations of urban planning legislation, including technical regulations, and project documentation, committed by the developer, technical customer, as well as by a person carrying out construction on the basis of an agreement with the developer or technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 752100065081
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-03-19, duration: 3
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out an unscheduled documentary verification of the execution of the order dated December 17, 2019 No. 345/19; prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and project documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor); regulations of state control (supervision) bodies, municipal control bodies
# 752100065048
Unscheduled inspection
Start date: 2021-03-16, end date: 2021-03-18, duration: 3
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out an unscheduled documentary verification of the execution of the order dated December 17, 2019 No. 344/19; prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, and project documentation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor); regulations of state control (supervision) bodies, municipal control bodies.
# 752100041663
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-04-01, duration: 20
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an unscheduled on-site inspection on the basis of the notice of completion of construction dated February 20, 2021 No. 12/1014–21; prevention, detection and suppression of violations of the legislation on urban development, including technical regulations, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor), and project documentation; compliance with mandatory requirements or requirements established by municipal legal acts
# 752101346130
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-22, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an unscheduled inspection according to the inspection program, according to the notification dated 02/18/2021 No. 17/915-21. ;, prevention, detection and suppression of violations of legislation on urban development, including project documentation, compliance with mandatory requirements or requirements established by municipal legal acts, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or technical customer
# 752100040800
Unscheduled inspection
Start date: 2021-03-02, end date: 2021-03-30, duration: 20
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Conducting a scheduled inspection, preventing, identifying and suppressing violations of urban planning legislation, including technical regulations, and project documentation, committed by the developer, technical customer, as well as by a person carrying out construction on the basis of an agreement with the developer or technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 752100034763
Unscheduled inspection
Start date: 2021-02-19, end date: 2021-03-22, duration: 20
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an inspection upon notification of the developer about the completion of construction, preventing, identifying and suppressing violations of legislation on urban development, including technical regulations, and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or technical customer, compliance with mandatory requirements or requirements established by municipal legal acts acts
# 752101356237
Unscheduled inspection
Start date: 2021-02-19, end date: 2021-03-19, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an unscheduled inspection, based on the notice of elimination of violations dated February 15, 2021 No. 20/830-21 (ex. dated February 16, 2021 No. 962) during the construction of a capital construction facility, prevention, identification and suppression of violations committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor), violations of legislation on urban development, project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 752100034758
Unscheduled inspection
Start date: 2021-02-24, end date: 2021-03-17, duration: 15
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an inspection upon notification of the developer about the completion of construction, preventing, identifying and suppressing violations of the legislation on urban development and project documentation committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 752101356433
Unscheduled inspection
Start date: 2021-02-24, end date: 2021-03-24, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an unscheduled inspection, based on the notice of elimination of violations dated February 17, 2021 No. 20/906-21 (ex. dated February 18, 2021 No. 1041), prevention, detection and suppression of violations committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer (hereinafter referred to as the contractor), violations of legislation on urban development, project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 752005291380
Unscheduled inspection
Start date: 2020-12-28, end date: 2021-02-02, duration: 20
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an unscheduled on-site inspection based on the notice of completion of construction dated December 22, 2020 129470
# 752000202198
Unscheduled inspection
Start date: 2020-12-28, end date: 2020-01-19, duration: 10
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Carrying out an unscheduled inspection prevention detection and suppression of violations of legislation on urban planning activities committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, including technical regulations and project documentation compliance with mandatory requirements or requirements established by municipal legal acts prevention detection and suppression of violations committed by the developer, the customer, as well as by the person carrying out construction on the basis of contracts with the developer or the customer hereinafter referred to as the contractor violations of the legislation on urban development activities including project documentation compliance with mandatory requirements or requirements established by municipal legal acts
# 752005308210
Unscheduled inspection
Start date: 2020-12-28, end date: 2021-01-19, duration: 10
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting a program check prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 752005289569
Unscheduled inspection
Start date: 2020-12-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 752005289563
Unscheduled inspection
Start date: 2020-12-11, end date: 2021-01-15, duration: 20
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an inspection upon notification of the developer about the completion of construction prevention detection and suppression of violations of the legislation on urban development activities committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, including technical regulations and project documentation compliance with mandatory requirements or requirements established by municipal legal acts
# 752005289515
Unscheduled inspection
Start date: 2020-12-11, end date: 2021-01-15, duration: 20
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an inspection upon notification of the developer about the completion of construction prevention detection and suppression of violations of the legislation on urban development activities committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, including technical regulations and project documentation compliance with mandatory requirements or requirements established by municipal legal acts
# 752005269854
Unscheduled inspection
Start date: 2020-12-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 752001363049
Unscheduled inspection
Start date: 2020-12-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 752005296827
Unscheduled inspection
Start date: 2020-12-30, end date: 2021-02-04, duration: 20
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an inspection upon notification of the developer about the completion of construction prevention detection and suppression of violations of the legislation on urban development activities committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, including technical regulations and project documentation compliance with mandatory requirements or requirements established by municipal legal acts
# 752005233908
Unscheduled inspection
Start date: 2020-11-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 752005189328
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-11-16, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Zabaikalskom krae
Purpose of inspection: Implementation of federal state supervision over compliance by a legal entity or an individual entrepreneur with the mandatory requirements of labor legislation and other regulatory legal acts containing labor law norms Prosecutor's Requirement 75430020TPR of 12102020
# 752005187170
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection:
# 752005185736
Unscheduled inspection
Start date: 2020-10-02, end date: 2020-10-09, duration: 5
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting a program check prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 752005209322
Unscheduled inspection
Start date: 2020-10-13, end date: 2020-11-10, duration: 20
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an inspection upon notification of the developer about the completion of construction prevention detection and suppression of violations of the legislation on urban development activities committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, including technical regulations and project documentation compliance with mandatory requirements or requirements established by municipal legal acts
# 752004481822
Unscheduled inspection
Start date: 2020-08-10, end date: 2020-08-21, duration: 10
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out an unscheduled inspection according to the inspection program based on the notice of completion of construction dated July 28, 2019 2the prevention of detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of mandatory requirements or requirements established by municipal legal acts
# 752004469185
Unscheduled inspection
Start date: 2020-07-20, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection:
# 752004410186
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-05, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting a program check prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 752004410169
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-06-05, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting a program check prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 752004409993
Unscheduled inspection
Start date: 2020-05-25, end date: 2020-05-27, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting a program check prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 752004417182
Unscheduled inspection
Start date: 2020-05-27, end date: 2020-06-09, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out a scheduled inspection prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 752004409702
Unscheduled inspection
Start date: 2020-05-14, end date: 2020-05-15, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Conducting an unscheduled inspection in accordance with the notice of the beginning of construction 163107 bx 2732 dated May 12, 2020 of the inspection program dated May 12, 2020 prevention detection and suppression of violations of the legislation on urban development, including project documentation, by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established municipal legal acts
# 752004409698
Unscheduled inspection
Start date: 2020-05-14, end date: 2020-05-15, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Conducting an unscheduled inspection in accordance with the notice of the beginning of construction 13 vx 2580 dated April 29, 2020 of the inspection program dated April 30, 2020 prevention detection and suppression of violations of the legislation on urban development, including project documentation, by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established municipal legal acts
# 752004409047
Unscheduled inspection
Start date: 2020-05-15, end date: 2020-05-28, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out a scheduled inspection prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 752004365539
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-04-03, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out a scheduled inspection prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 752004270065
Unscheduled inspection
Start date: 2020-02-07, end date: 2020-02-10, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: The purpose of verifying the execution of the instruction of the State Inspectorate of the Trans-Baikal Territory dated October 31, 2019 26019 tasks prevention detection and suppression of violations of the legislation on urban development, including project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter the contractor, to comply with the instructions of state control bodies supervision of municipal control bodies
# 751904062796
Unscheduled inspection
Start date: 2019-12-06, end date: 2019-12-27, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting a scheduled inspection according to the program of inspections based on the notice of completion of construction dated November 28, 2019 126788 prevention identification and suppression of violations of the legislation on urban development, including technical regulations and project documentation, by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, compliance with mandatory requirements or requirements established by municipal legal acts acts
# 751904082405
Unscheduled inspection
Start date: 2019-12-09, end date: 2020-01-13, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting an inspection upon notification of the developer about the completion of construction prevention detection and suppression of violations of the legislation on urban development activities committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, including technical regulations and project documentation compliance with mandatory requirements or requirements established by municipal legal acts
# 751904106173
Unscheduled inspection
Start date: 2019-12-10, end date: 2020-01-14, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Conducting a scheduled inspection in accordance with the notice of completion of construction dated December 03, 2019 vx 7832 and the inspection program dated June 17, 2019 prevention detection and suppression of violations of the legislation on urban development, including project documentation, by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established municipal legal acts
# 751904106565
Unscheduled inspection
Start date: 2019-12-11, end date: 2019-12-27, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: conducting a scheduled inspection according to the inspection program based on the notice of completion of construction dated December 05, 2019 127012 prevention identification and suppression of violations of the legislation on urban development and project documentation by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter the contractor compliance with mandatory requirements or requirements established by municipal legal acts
# 751903995600
Unscheduled inspection
Start date: 2019-11-20, end date: 2019-12-17, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out a scheduled inspection according to the program of inspections based on the notice of completion of construction dated November 12, 2019 126341the prevention of detection and suppression of violations of the legislation on urban development and project documentation by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, compliance with mandatory requirements or requirements established by municipal legal acts
# 751903995567
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection:
# 751903995552
Unscheduled inspection
Start date: 2019-11-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 751904028456
Unscheduled inspection
Start date: 2019-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 751903947950
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-11-21, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out a scheduled inspection prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 751903832628
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-11-12, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of the execution of the instruction prevention detection and suppression of violations of the legislation on urban planning activities committed by the person carrying out construction on the basis of an agreement with the developer or technical customer, including technical regulations and project documentation compliance with the instructions of state control bodies supervision of municipal control bodies
# 751903880524
Unscheduled inspection
Start date: 2019-10-23, end date: 2019-10-31, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Conducting a scheduled inspection in accordance with the notice of the beginning of construction dated September 17, 2019 022019 vx 3967 and the inspection program dated September 30, 2019 prevention detection and suppression of violations of the legislation on urban development, including project documentation, compliance with mandatory requirements or requirements made by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the technical customer established by municipal legal acts
# 751903821762
Unscheduled inspection
Start date: 2019-10-08, end date: 2019-10-11, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of the execution of the instruction prevention detection and suppression of violations of the legislation on urban planning activities committed by the person carrying out construction on the basis of an agreement with the developer or technical customer, including technical regulations and project documentation compliance with the instructions of state control bodies supervision of municipal control bodies
# 751903832632
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-11-12, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out a scheduled inspection prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 751903488262
Unscheduled inspection
Start date: 2019-09-12, end date: 2019-10-10, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out a scheduled inspection prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 751902932022
Unscheduled inspection
Start date: 2019-08-07, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection:
# 751902880474
Unscheduled inspection
Start date: 2019-07-17, end date: 2019-07-19, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: Carrying out a planned final inspection prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 751902880460
Unscheduled inspection
Start date: 2019-07-17, end date: 2019-07-18, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of the execution of the instruction prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by a person carrying out construction on the basis of a contract with a developer or a technical customer, compliance with the instructions of state control bodies supervision of municipal control bodies
# 751902880450
Unscheduled inspection
Start date: 2019-07-17, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection:
# 751902995013
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-07-26, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out a scheduled inspection prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 751902883302
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-16, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out a scheduled inspection prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 751902906861
Unscheduled inspection
Start date: 2019-07-29, end date: 2019-08-23, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out a scheduled inspection prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 751902810999
Unscheduled inspection
Start date: 2019-06-20, end date: 2019-06-26, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out a scheduled inspection prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 751902813995
Unscheduled inspection
Start date: 2019-06-24, end date: 2019-06-28, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: carrying out a scheduled inspection prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the technical customer, compliance with mandatory requirements or requirements established by municipal legal acts
# 751902762555
Unscheduled inspection
Start date: 2019-06-06, end date: 2019-06-24, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of the execution of the instruction prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by a person carrying out construction on the basis of a contract with a developer or a technical customer, compliance with the instructions of state control bodies supervision of municipal control bodies
# 751902762551
Unscheduled inspection
Start date: 2019-06-06, end date: 2019-06-24, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of the execution of the instruction prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation, committed by a person carrying out construction on the basis of a contract with a developer or a technical customer, compliance with the instructions of state control bodies supervision of municipal control bodies
# 751802156938
Unscheduled inspection
Start date: 2018-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 751802170965
Unscheduled inspection
Start date: 2018-11-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 751802130830
Unscheduled inspection
Start date: 2018-11-14, end date: 2018-12-11, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation on the basis of the notice of completion of construction dated November 06, 2018 124754 vx dated November 06, 2018 7148 prevention detection and suppression of violations of the law committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter the contractor urban planning activities, including technical regulations and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 751801669121
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-10-19, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation on the basis of the notice of completion of construction dated September 13, 2018 123914 vx dated September 14, 2018 5787 prevention detection and suppression of violations of the law committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter the contractor urban planning activities, including technical regulations and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 751800420522
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-07-02, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Zabaikalskomu krayu
Purpose of inspection: verification of the execution of the order on the elimination of violations of land legislation from 30052017 184, the deadline for which expired 28052018 compliance with the requirements of land legislation by the State Government Institution the Service of the unified customer of the Trans-Baikal Territory when using a land plot located at the address Zabaikalsky Krai Chita district from Smolenka str. Central 29 a
# 75170802976654
Unscheduled inspection
Start date: 2017-12-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 75170802936073
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-25, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation on the basis of the notice of completion of construction dated November 27, 2017 124282 vx dated November 27, 2017 7514 prevention detection and suppression of violations of the law committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter referred to as the contractor urban planning activities, including technical regulations and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 75170802936159
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-25, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation on the basis of the notice of completion of construction dated November 27, 2017 124281 bx dated November 27, 2017 7517 prevention detection and suppression of violations of the law committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter the contractor urban planning activities, including technical regulations and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 75170802936003
Unscheduled inspection
Start date: 2017-12-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 75170802935909
Unscheduled inspection
Start date: 2017-12-05, end date: 2017-12-25, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation on the basis of the notice of completion of construction dated November 27, 2017 124278 vx dated November 27, 2017 7518 prevention detection and suppression of violations of the law committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter the contractor urban planning activities, including technical regulations and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 75170802961875
Unscheduled inspection
Start date: 2017-12-12, end date: 2017-12-26, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of the execution of the instruction prevention detection and suppression of violations of the legislation on urban planning activities committed by the person carrying out construction on the basis of an agreement with the developer or technical customer, including technical regulations and project documentation compliance with the instructions of state control bodies supervision of municipal control bodies
# 75170802711190
Unscheduled inspection
Start date: 2017-10-11, end date: 2017-10-26, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation on the basis of the notice of completion of construction dated October 02, 2017 123826 bx dated October 03, 2017 6137 prevention detection and suppression of violations of the law committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter the contractor urban planning activities, including technical regulations and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 75170802797216
Unscheduled inspection
Start date: 2017-10-31, end date: —, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection:
# 75170802411592
Unscheduled inspection
Start date: 2017-09-12, end date: 2017-10-09, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation on the basis of the notice of completion of construction dated September 04, 2017 123391 cx dated September 05, 2017 5565 prevention detection and suppression of violations of the legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter the contractor urban planning activities, including technical regulations and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 75170801950170
Unscheduled inspection
Start date: 2017-08-29, end date: 2017-09-25, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation on the basis of the notice of completion of construction dated August 17, 2017 123131 cx dated August 21, 2017 5198 prevention detection and suppression of violations of the legislation committed by the developer, the customer and the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter the contractor urban planning activities, including technical regulations and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts
# 75170801916532
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-09-18, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: This inspection is carried out in order to verify the compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation on the basis of the notice of completion of construction dated August 17, 2017. The objectives of this inspection are to prevent the identification and suppression of violations of urban planning legislation committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor The purpose of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 75170701890134
Unscheduled inspection
Start date: 2017-08-22, end date: 2017-09-18, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of the execution of the instruction prevention detection and suppression of violations of the legislation on urban planning activities committed by the person carrying out construction on the basis of an agreement with the developer or technical customer, including technical regulations and project documentation compliance with the instructions of state control bodies supervision of municipal control bodies
# 75170701750257
Unscheduled inspection
Start date: 2017-06-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 75170701610437
Unscheduled inspection
Start date: 2017-05-11, end date: 2017-05-24, duration: —
Authority: Gosudarstvennaya inspekciya Zabaikalskogo kraya
Purpose of inspection: verification of compliance of the constructed reconstructed capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation on the basis of the notice of completion of construction dated May 02, 2017 121442 vx dated May 02, 2017 2597 prevention detection and suppression of violations of the law committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer hereinafter the contractor urban planning activities, including technical regulations and project documentation, compliance with mandatory requirements or requirements established by municipal legal acts