# 742101418800
Unscheduled inspection
Start date: 2021-12-08, end date: 2021-12-14, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the work on the installation of fire protection measures and installation of internal engineering systems. and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100538896
Unscheduled inspection
Start date: 2021-09-10, end date: 2021-09-16, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the performance of work on the installation of translucent structures, the installation of concrete floors during the production process. and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100242298
Unscheduled inspection
Start date: 2021-05-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742105342269
Unscheduled inspection
Start date: 2021-03-03, end date: 2021-03-11, duration: 6
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of load-bearing and enclosing structures during the production process. and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742005192073
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802308678
Unscheduled inspection
Start date: 2018-12-19, end date: 2019-01-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802308621
Unscheduled inspection
Start date: 2018-12-19, end date: 2019-01-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the completed facility 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801460724
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-09-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the gas pipeline tie-in, reclamation, fire prevention, sanitary and epidemiological and environmental protection measures after the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801460485
Unscheduled inspection
Start date: 2018-09-24, end date: 2018-09-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the gas pipeline, reclamation, fire prevention, sanitary and epidemiological and environmental protection measures after the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800620204
Unscheduled inspection
Start date: 2018-08-17, end date: 2018-08-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on welding and laying pipes, insulation and anti-corrosion coating, sprinkling and filling of the pipeline during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800620114
Unscheduled inspection
Start date: 2018-08-17, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800545971
Unscheduled inspection
Start date: 2018-07-17, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800545952
Unscheduled inspection
Start date: 2018-07-17, end date: 2018-07-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the breakdown of the trench development route and the construction of the bed, work on the installation of foundations for supports and the installation of supports, work on welding and laying pipes during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800220074
Unscheduled inspection
Start date: 2018-03-23, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741800005711
Unscheduled inspection
Start date: 2018-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802851030
Unscheduled inspection
Start date: 2017-11-20, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802620794
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of excavation for foundations, concrete preparation devices, foundation slabs and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802697804
Unscheduled inspection
Start date: 2017-10-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701707330
Unscheduled inspection
Start date: 2017-06-30, end date: 2017-07-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the conformity of work on the installation of trenches, pipe laying, backfilling of entrances 5 11 13 Embedding device electrical work landscaping 2The receipt of building permits 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701207766
Unscheduled inspection
Start date: 2016-12-16, end date: 2016-12-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the conformity of the work performed installation of a trench cushion laying of a pipe backfilling of inputs 5 10 11 13 insertion device electrical works landscaping and materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701068487
Unscheduled inspection
Start date: 2016-11-07, end date: 2016-11-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the compliance of the work with the installation of trenches, pillows, pipe laying, backfilling of inputs 6781415 and the materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700972397
Unscheduled inspection
Start date: 2016-10-14, end date: 2016-10-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of the hinged ventilated facade of internal engineering systems water supply sewerage heating ventilation electricity fire automation and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160601775266
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1confirmation of the conformity of the work performed installation of trenches, cushions, pipe laying, backfilling of entrances 123991 base, installation, fencing of the GRPB and materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation2 Receipt of a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation