Found 79 inspections:

# 002105338813
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-03-01, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki vypolneniya meropriyatii, predusmotrennyh punktami ranee vydannogo proveryaemomu licu predpisaniya ot 17.11.2020 № 09/377 ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii, srok kotoryh istek. Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii predpisaniya ot 17.11.2020 № 09/377. Predmetom nastoyaschei proverki, yavlyaetsya proverka fakticheskogo vypolneniya predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 17.11.2020 № 09/377


# 002005280454
Unscheduled inspection
Start date: 2020-12-21, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002005180320
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004475082
Unscheduled inspection
Start date: 2020-07-30, end date: 2020-08-26, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu osuschestvleniya gosudarstvennogo stroitelnogo nadzora pri stroitelstve ukazannogo obekta kapitalnogo stroitelstva v svyazi s nastupleniem srokov zaversheniya rabot kotorye podlezhat proverke v sootvetstvii s utverzhdennoi programmoi provedeniya proverok pri rekonstrukcii obekta kapitalnogo stroitelstvaZadachei nastoyaschei proverki yavlyaetsya preduprezhdenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti a takzhe trebovanii proektnoi dokumentacii


# 001902874846
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-08-09, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 26042019 09200 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek 01072019Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 26042019 09200Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 26042019 09200


# 001902874545
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-08-09, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki vypolneniya meropriyatii predusmotrennyh punktami ranee vydannogo proveryaemomu licu predpisaniya ot 24052019g 09237 ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii srok ispolneniya kotorogo istek 05072019Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii v ustanovlennyi predpisaniem ot 24052019g 09237 srok 6 Predmetom nastoyaschei proverki yavlyaetsya proverka vypolneniya predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 24052019g 09237


# 001902874474
Unscheduled inspection
Start date: 2019-07-15, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902781264
Unscheduled inspection
Start date: 2019-06-11, end date: 2019-07-09, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 18032019 09103 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek 13052019Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 18032019 09103Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 18032019 09103


# 001902724252
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001902501921
Unscheduled inspection
Start date: 2019-02-18, end date: —, duration:
Authority:
Purpose of inspection:


# 001802086210
Unscheduled inspection
Start date: 2018-11-19, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800609094
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-09-14, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800542249
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 20042018 09231 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 20042018 09231 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 20042018 09231


# 001800542238
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 20042018 09230 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 20042018 09230 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 20042018 09230


# 001800542279
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 20042018 09229 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 20042018 09229 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 20042018 09229


# 001800502377
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 27032018 09163 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 27032018 09163 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 27032018 09163


# 001800221016
Unscheduled inspection
Start date: 2018-03-26, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800221003
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-20, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800220999
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-20, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800220997
Unscheduled inspection
Start date: 2018-03-26, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800083196
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-27, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 20112017 09741 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 20112017 09741 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 20112017 09741


# 001800083189
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-27, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800083172
Unscheduled inspection
Start date: 2018-02-26, end date: —, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800083170
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-27, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 06102017 09626 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 06102017 09626 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 06102017 09626


# 242100277578
Unscheduled inspection
Start date: 2021-06-10, end date: —, duration: 14
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to carry out state construction supervision in carrying out works to preserve an object of cultural heritage affecting the structural and other characteristics of reliability and safety of the specified capital construction facility, in connection with the timing of completion of works that are subject to verification in accordance with the approved program of inspections in carrying out works to preserve an object of cultural heritage affecting the structural and other characteristics of reliability and safety of the capital construction facility. The subject of this review is: Verification of compliance of the work performed and the construction materials used during the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used; Checking for a building permit; Verification of compliance with the requirements established by Parts 2, 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation


# 242100229695
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya meropriyatii, predusmotrennyh punktami ranee vydannogo proveryaemomu licu predpisaniya ot 25.01.2021 № 09/024 ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii, srok ispolneniya kotorogo istek. Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii predpisaniya ot 25.01.2021 № 09/024 v ustanovlennyi srok. Predmetom nastoyaschei proverki, yavlyaetsya proverka vypolneniya predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 25.01.2021 № 09/024.


# 242100229739
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya meropriyatii, predusmotrennyh punktami ranee vydannogo proveryaemomu licu predpisaniya ot 25.01.2021 № 09/025 ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii, srok ispolneniya kotorogo istek. Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii predpisaniya ot 25.01.2021 № 09/025 v ustanovlennyi srok. Predmetom nastoyaschei proverki, yavlyaetsya proverka vypolneniya predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 25.01.2021 № 09/025.


# 242100229772
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration:
Authority:
Purpose of inspection:


# 242100229811
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration:
Authority:
Purpose of inspection:


# 242100229642
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya s celyu proverki vypolneniya meropriyatii, predusmotrennyh punktami ranee vydannogo proveryaemomu licu predpisaniya ot 25.01.2021 № 09/026 ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii, srok ispolneniya kotorogo istek. Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii predpisaniya ot 25.01.2021 № 09/026 v ustanovlennyi srok. Predmetom nastoyaschei proverki, yavlyaetsya proverka vypolneniya predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 25.01.2021 № 09/026.


# 242100229599
Unscheduled inspection
Start date: 2021-05-26, end date: —, duration:
Authority:
Purpose of inspection:


# 242100240464
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration:
Authority:
Purpose of inspection:


# 002105338813
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-03-01, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki vypolneniya meropriyatii, predusmotrennyh punktami ranee vydannogo proveryaemomu licu predpisaniya ot 17.11.2020 № 09/377 ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii, srok kotoryh istek. Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii predpisaniya ot 17.11.2020 № 09/377. Predmetom nastoyaschei proverki, yavlyaetsya proverka fakticheskogo vypolneniya predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 17.11.2020 № 09/377


# 002005280541
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-25, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki vypolneniya meropriyatii predusmotrennyh punktami ranee vydannogo proveryaemomu licu predpisaniya ot 13042020 09106 ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii v svyazi s postupivshim hodataistvom ot 11112020 9400211759220 vh 36146478 ot 08122020 Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii predpisaniya ot 13042020 09106 Predmetom nastoyaschei proverki yavlyaetsya proverka vypolneniya predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 13042020 09106


# 002005280454
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-25, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki vypolneniya meropriyatii predusmotrennyh punktami ranee vydannogo proveryaemomu licu predpisaniya ot 14072020 09172 ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii v svyazi s postupivshim hodataistvom ot 11112020 bn vh 36146476 ot 08122020 Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii predpisaniya ot 14072020 09172 Predmetom nastoyaschei proverki yavlyaetsya proverka vypolneniya predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 14072020 09172


# 002005280400
Unscheduled inspection
Start date: 2020-12-21, end date: 2021-01-25, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki vypolneniya meropriyatii predusmotrennyh punktami ranee vydannogo proveryaemomu licu predpisaniya ot 13042020 09107 ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii v svyazi s postupivshim hodataistvom ot 11112020 9400211759120 vh 36146480 ot 08122020 Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii predpisaniya ot 13042020 09107 Predmetom nastoyaschei proverki yavlyaetsya proverka vypolneniya predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 13042020 09107


# 002005180320
Unscheduled inspection
Start date: 2020-10-12, end date: 2020-10-30, duration: 15
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: To establish that this inspection is carried out in order to carry out state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility, the subject of this inspection is to verify the compliance of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such inspections the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, Verification of the availability of a construction permit, verification of compliance with the requirements established by parts 2 3 and 3_1 of Article 52 of the Urban Planning Code of the Russian Federation dated 29122004 190 FZ


# 002004475059
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-28, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu osuschestvleniya gosudarstvennogo stroitelnogo nadzora pri stroitelstve ukazannogo obekta kapitalnogo stroitelstva v svyazi s nastupleniem srokov zaversheniya rabot kotorye podlezhat proverke v sootvetstvii s utverzhdennoi programmoi provedeniya proverok pri rekonstrukcii obekta kapitalnogo stroitelstvaZadachei nastoyaschei proverki yavlyaetsya preduprezhdenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti a takzhe trebovanii proektnoi dokumentacii


# 002004475121
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-28, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu osuschestvleniya gosudarstvennogo stroitelnogo nadzora pri stroitelstve ukazannogo obekta kapitalnogo stroitelstva v svyazi s nastupleniem srokov zaversheniya rabot kotorye podlezhat proverke v sootvetstvii s utverzhdennoi programmoi provedeniya proverok pri rekonstrukcii obekta kapitalnogo stroitelstvaZadachei nastoyaschei proverki yavlyaetsya preduprezhdenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti a takzhe trebovanii proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovproverka nalichiya razresheniya na stroitelstvoproverka vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 3_1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii ot 29122004 190FZ


# 002004475117
Unscheduled inspection
Start date: 2020-08-03, end date: 2020-08-28, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu osuschestvleniya gosudarstvennogo stroitelnogo nadzora pri stroitelstve ukazannogo obekta kapitalnogo stroitelstva v svyazi s nastupleniem srokov zaversheniya rabot kotorye podlezhat proverke v sootvetstvii s utverzhdennoi programmoi provedeniya proverok pri rekonstrukcii obekta kapitalnogo stroitelstvaZadachei nastoyaschei proverki yavlyaetsya preduprezhdenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti a takzhe trebovanii proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovproverka nalichiya razresheniya na stroitelstvoproverka vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 3_1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii ot 29122004 190FZ


# 002004475082
Unscheduled inspection
Start date: 2020-07-30, end date: 2020-08-26, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu osuschestvleniya gosudarstvennogo stroitelnogo nadzora pri stroitelstve ukazannogo obekta kapitalnogo stroitelstva v svyazi s nastupleniem srokov zaversheniya rabot kotorye podlezhat proverke v sootvetstvii s utverzhdennoi programmoi provedeniya proverok pri rekonstrukcii obekta kapitalnogo stroitelstvaZadachei nastoyaschei proverki yavlyaetsya preduprezhdenie i presechenie narushenii zakonodatelstva o gradostroitelnoi deyatelnosti a takzhe trebovanii proektnoi dokumentacii


# 002004427184
Unscheduled inspection
Start date: 2020-06-05, end date: 2020-06-30, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu osuschestvleniya gosudarstvennogo stroitelnogo nadzora pri stroitelstve ukazannogo obekta kapitalnogo stroitelstva v svyazi s nastupleniem srokov zaversheniya rabot kotorye podlezhat proverke v sootvetstvii s utverzhdennoi programmoi provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva6 Predmetom nastoyaschei proverki yavlyaetsya 61 Proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov62 Proverka nalichiya razresheniya na stroitelstvo63 Proverka vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 3_1 stati 52 Gradostroitelnogo kodeks Rossiiskoi Federacii ot 29122004 190FZ


# 002004426441
Unscheduled inspection
Start date: 2020-06-15, end date: 2020-07-14, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu osuschestvleniya gosudarstvennogo stroitelnogo nadzora pri stroitelstve ukazannogo obekta kapitalnogo stroitelstva v svyazi s nastupleniem srokov zaversheniya rabot kotorye podlezhat proverke v sootvetstvii s utverzhdennoi programmoi provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva6 Predmetom nastoyaschei proverki yavlyaetsya 61 Proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov62 Proverka nalichiya razresheniya na stroitelstvo63 Proverka vypolneniya trebovanii ustanovlennyh chastyami 2 3 i 3_1 stati 52 Gradostroitelnogo kodeks Rossiiskoi Federacii ot 29122004 190FZ


# 002004358525
Unscheduled inspection
Start date: 2020-03-17, end date: 2020-04-13, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used


# 002004358493
Unscheduled inspection
Start date: 2020-03-17, end date: 2020-04-13, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used


# 001902874846
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-08-09, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 26042019 09200 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek 01072019Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 26042019 09200Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 26042019 09200


# 001902874610
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-08-09, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki vypolneniya meropriyatii predusmotrennyh punktami ranee vydannogo proveryaemomu licu predpisaniya ot 24052019g 09236 ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii srok ispolneniya kotorogo istek 05072019Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii v ustanovlennyi predpisaniem ot 24052019g 09236 srok 6 Predmetom nastoyaschei proverki yavlyaetsya proverka vypolneniya predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 24052019g 09236


# 001902874545
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-08-09, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki vypolneniya meropriyatii predusmotrennyh punktami ranee vydannogo proveryaemomu licu predpisaniya ot 24052019g 09237 ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii srok ispolneniya kotorogo istek 05072019Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii v ustanovlennyi predpisaniem ot 24052019g 09237 srok 6 Predmetom nastoyaschei proverki yavlyaetsya proverka vypolneniya predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 24052019g 09237


# 001902874474
Unscheduled inspection
Start date: 2019-07-15, end date: 2019-08-09, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: nastoyaschaya proverka provoditsya s celyu proverki vypolneniya meropriyatii predusmotrennyh punktami ranee vydannogo proveryaemomu licu predpisaniya ot 26042019g 09201 ob ustranenii vyyavlennyh narushenii obyazatelnyh trebovanii srok ispolneniya kotorogo istek 01072019Zadachei nastoyaschei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii v ustanovlennyi predpisaniem ot 26042019g 09201 srok 6 Predmetom nastoyaschei proverki yavlyaetsya proverka vypolneniya predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 26042019g 09201


# 001902886365
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-16, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya v ramkah gosudarstvennogo stroitelnogo nadzora pri stroitelstve rekonstrukcii kapitalnom remonte obektov ukazannyh v punkte 51 stati 6 Gradostroitelnogo kodeksa Rossiiskoi Federacii za isklyucheniem obektov v otnoshenii kotoryh osuschestvlenie gosudarstvennogo stroitelnogo nadzora ukazami Prezidenta Rossiiskoi Federacii vozlozheno na inye federalnye organy ispolnitelnoi vlasti reestrovyi 10001515438 v svyazi s postupivshim izvescheniem ot 15072019 94001315919 vh 59651 ot 16072019 g ot zastroischika ob okonchanii stroitelstva obekta kapitalnogo stroitelstvaZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya 1 proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 001902781264
Unscheduled inspection
Start date: 2019-06-11, end date: 2019-07-09, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 18032019 09103 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek 13052019Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 18032019 09103Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 18032019 09103


# 001902688784
Unscheduled inspection
Start date: 2019-05-13, end date: 2019-06-07, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001902724252
Unscheduled inspection
Start date: 2019-05-27, end date: 2019-06-07, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 08022019 090313 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek 12042019Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 08022019 090313Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 08022019 090313


# 001902590561
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-05-17, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrol vypolneniya meropriyatii predusmotrennyh ranee vydannym predpisaniem ot 08022019 g 090313 p 18 srok ispolneniya kotorogo istekaet 12042019 g


# 001902654809
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-05-20, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001902654789
Unscheduled inspection
Start date: 2019-04-16, end date: 2019-05-20, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001902606718
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-26, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001902606711
Unscheduled inspection
Start date: 2019-04-01, end date: 2019-04-26, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001902501921
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-03-18, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001802217976
Unscheduled inspection
Start date: 2018-12-10, end date: 2019-01-14, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 12092018 09529ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istekaet 30112018 Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 12092018 09529 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 12092018 09529


# 001802217937
Unscheduled inspection
Start date: 2018-12-10, end date: 2019-01-14, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 12092018 09530 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istekaet 30112018 Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 12092018 09530 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 12092018 09530


# 001802086210
Unscheduled inspection
Start date: 2018-11-19, end date: 2018-12-14, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya v ramkah gosudarstvennogo stroitelnogo nadzora pri stroitelstve rekonstrukcii kapitalnom remonte obektov ukazannyh v punkte 51 stati 6 Gradostroitelnogo kodeksa Rossiiskoi Federacii za isklyucheniem obektov v otnoshenii kotoryh osuschestvlenie gosudarstvennogo stroitelnogo nadzora ukazami Prezidenta Rossiiskoi Federacii vozlozheno na inye federalnye organy ispolnitelnoi vlasti reestrovyi 10001515438 v svyazi s postupivshim izvescheniem ot 06112018 bn vh 81977 ot 06112018 g ot zastroischika ob okonchanii stroitelstva obekta kapitalnogo stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya 1 proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 001800609094
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-09-14, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800609093
Unscheduled inspection
Start date: 2018-08-20, end date: 2018-09-14, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800542300
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 20042018 09228 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 20042018 09228 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 20042018 09228


# 001800542249
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 20042018 09231 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 20042018 09231 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 20042018 09231


# 001800542238
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 20042018 09230 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 20042018 09230 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 20042018 09230


# 001800542279
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 20042018 09229 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 20042018 09229 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 20042018 09229


# 001800502377
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-08-03, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 27032018 09163 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 27032018 09163 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 27032018 09163


# 001800442539
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-07-13, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: osuschestvlenie gosudarstvennogo stroitelnogo nadzora pri stroitelstve ukazannogo obekta kapitalnogo stroitelstva v svyazi s nastupleniem srokov zaversheniya rabot kotorye podlezhat proverke v sootvetstvii s utverzhdennoi programmoi provedeniya proverok pri stroitelstve obekta kapitalnogo stroitelstva Zadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh licom osuschestvlyayuschim stroitelstvo narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentacii


# 001800221023
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-20, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800221016
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-20, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800221003
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-20, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800220999
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-20, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800220997
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-04-20, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800083196
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-27, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 20112017 09741 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 20112017 09741 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 20112017 09741


# 001800083189
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-27, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800083172
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-27, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 06102017 09625 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 06102017 09625 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 06102017 09625


# 001800083170
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-27, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 06102017 09626 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 06102017 09626 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 06102017 09626


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.