Found 2 inspections:

# 662100121112
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-04-30, duration: 10
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of a notice of completion of the construction of a capital construction facility. No. 29-01-41/12150 dated 03/31/2021, the purpose of this audit is to carry out regional state construction supervision. The subject of this audit is to verify the conformity of the work performed and the construction materials used during the construction of the capital construction facility "Beautification of St.Tavatuyskaya Street from Bebel Street to Rostochnaya Street in the Zheleznodorozhny district of Yekaterinburg", located at the address: Sverdlovsk region, Yekaterinburg, from Bebel Street to Rostochnaya Street, as well as the results of such work to the requirements of the project documentation specified in paragraph 1 of part 5 of Article 49 of the Urban Planning Code of the Russian Federation (including the project documentation, which takes into account the changes introduced in accordance with Parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation), including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources


# 661903296974
Unscheduled inspection
Start date: 2019-09-12, end date: 2019-10-04, duration:
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out on the basis of the notice of completion of the reconstruction of the capital construction facility bx 29018239514 dated 29082019. The objectives of this inspection are to carry out regional state construction supervision.6 The subject of this inspection is to verify the compliance of the work and construction materials used in the reconstruction of the capital construction facility "Reconstruction of Ulgotwald from Ulbebel to ulCherepanov in Hekaterinburg" located at Yekaterinburg VerkHisetsky and Zheleznodorozhny districts Gottwald St. the section from Bebel St. to Cherepanov St. the results of such work meet the requirements of the design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 3 and 31 of Article 52 Urban Planning Code of the Russian Federation


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.