Found 97 inspections:

# 001902755575
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-07-01, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: Verification of the implementation of regulation 10362238 dated 13/12/2018, namely, verification of the fact of the development and approval of the GO passport, the maintenance program, the technical inspection, the verification of the GO performance indicators and the planned preliminary repair of the manual, the GO operating instructions, as well as the determination of the official responsible for the operation of the GO and the maintenance of the GO passport


# 001902755529
Unscheduled inspection
Start date: 2019-06-03, end date: —, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection:


# 001902557840
Unscheduled inspection
Start date: 2019-03-14, end date: 2019-04-10, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: Verification of the implementation of regulation 10362239 of 13122018, namely, verification of the fact of submitting an application for state registration of objects that have a negative impact on the environment to the federal executive authority authorized by the Government of the Russian Federation or the executive authority of the subject of the Russian Federation in accordance with their competence


# 001802055604
Unscheduled inspection
Start date: 2018-10-08, end date: —, duration:
Authority:
Purpose of inspection:


# 001800191632
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-04-06, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po g Moskva Moskovskoi i Tulskoi oblastyam
Purpose of inspection: This audit is conducted in order to comply with the requirements of the previously issued regulation dated 29062017 10138z2017 on the elimination of identified violations, the deadline for which has expired. The objectives of this audit are to conduct an audit to eliminate violations of mandatory requirements of legislation in the field of land supervision as part of the fulfillment of the requirements of the previously issued regulation dated 29062017 10138z2017 on the elimination of identified violations, the deadline for which has expired. The subject of this audit is the execution of JSC "PSO 13 previously issued an order dated 29062017 10138z2017 on the elimination of identified violations


# 502105326781
Unscheduled inspection
Start date: 2021-12-29, end date: —, duration:
Authority:
Purpose of inspection:


# 772101380524
Unscheduled inspection
Start date: 2021-11-29, end date: —, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of Regulation No. 02-25-097600-5-02 dated 19.10.2021 with a deadline until 19.11.2021


# 772101385182
Unscheduled inspection
Start date: 2021-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 772101274457
Unscheduled inspection
Start date: 2021-11-08, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772101391798
Unscheduled inspection
Start date: 2021-11-26, end date: —, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of Regulation No. 02-25-099300-5-01 dated 05.10.2021 with a deadline until 05.11.2021


# 772101328304
Unscheduled inspection
Start date: 2021-11-15, end date: 2021-11-19, duration: 5
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772101171662
Unscheduled inspection
Start date: 2021-10-11, end date: —, duration:
Authority:
Purpose of inspection:


# 772101160753
Unscheduled inspection
Start date: 2021-10-11, end date: 2021-04-09, duration: 17
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: Conducting an inspection based on the completion notice No. P001-2185367220-50256312 dated 09/28/2021


# 772100803072
Unscheduled inspection
Start date: 2021-09-17, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100966676
Unscheduled inspection
Start date: 2021-09-29, end date: —, duration: 6
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations of Regulation No. 02-25-093900-5-02 dated 08/17/2021 with a deadline until 09/17/2021


# 772100554960
Unscheduled inspection
Start date: 2021-09-02, end date: —, duration:
Authority:
Purpose of inspection:


# 772100456239
Unscheduled inspection
Start date: 2021-08-16, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100532969
Unscheduled inspection
Start date: 2021-08-30, end date: —, duration: 7
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations of Regulation No. 02-25-097600-5-01 dated 07/20/2021 with a deadline until 08/20/2021


# 772100359255
Unscheduled inspection
Start date: 2021-07-19, end date: 2021-07-22, duration: 4
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100350020
Unscheduled inspection
Start date: 2021-07-13, end date: 2021-08-02, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100292461
Unscheduled inspection
Start date: 2021-06-16, end date: 2021-06-18, duration: 3
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the order issued by Mosgosstroynadzor


# 772100248245
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-07-02, duration: 19
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the inspection program; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: checking the elimination of violations specified in the instruction issued by Mosgosstroynadzor compliance of the work and the construction materials used in the construction, reconstruction process the capital construction facility, as well as the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100198762
Unscheduled inspection
Start date: 2021-05-06, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100169346
Unscheduled inspection
Start date: 2021-04-20, end date: —, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: Implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms, registration number of function No. 10001244260 in the Federal State Information System "Federal Register of State and Municipal Services"


# 502100153155
Unscheduled inspection
Start date: 2021-04-14, end date: 2021-05-13, duration: 20
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Moskovskoi oblasti
Purpose of inspection: The purpose is to implement the order of the Federal Service for Supervision of Consumer Rights Protection and Human Welfare dated 04/02/2021 No. 131 "On conducting inspections of working conditions of foreign citizens involved in the implementation of major investment projects", issued in order to implement paragraph 5.2. of the protocol of the operational meeting of the Security Council of the Russian Federation dated 02/02/2021, approved by the President of the Russian Federation V.V. Putin 05.03.2021 № Pr-356 The objectives of this audit are: to identify, prevent and suppress violations of the requirements of the legislation of the Russian Federation in the field of sanitary and epidemiological welfare of the population.


# 772100111390
Unscheduled inspection
Start date: 2021-04-05, end date: 2021-04-09, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: inspections of the elimination of violations (notification of the elimination of violations No. P001-8975477889-43872282 dated 03/25/2021 in the framework of Regulation No. 02-25-090600-5-01 dated 03/11/2021 with a deadline until 04/11/2021


# 772100093454
Unscheduled inspection
Start date: 2021-04-01, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772100077304
Unscheduled inspection
Start date: 2021-03-19, end date: 2021-04-07, duration: 14
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit: carrying out control measures in connection with the verification of compliance with the instruction; The tasks of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor


# 772100041900
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-04-09, duration: 20
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772100050400
Unscheduled inspection
Start date: 2021-03-04, end date: 2021-03-11, duration: 5
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: assessment of the compliance of the work performed with the requirements of the design documentation for the construction of a multi-storey residential building at the address: Moscow region, Mozhaysk, Frunze St.


# 772100044902
Unscheduled inspection
Start date: 2021-03-05, end date: 2021-03-19, duration: 10
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the implementation of the audit program; The tasks of the audit: prevention, identification and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements design documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, including checking the elimination of violations of compliance of completed works with the requirements of design documentation identified during construction control and state construction supervision


# 772105321477
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772105308693
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration:
Authority:
Purpose of inspection:


# 772005145653
Unscheduled inspection
Start date: 2020-10-01, end date: —, duration:
Authority:
Purpose of inspection:


# 502005194118
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration:
Authority:
Purpose of inspection:


# 502004404067
Unscheduled inspection
Start date: 2020-10-12, end date: —, duration:
Authority:
Purpose of inspection:


# 502005194576
Unscheduled inspection
Start date: 2020-08-17, end date: 2020-08-17, duration: 1
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: in order to verify the execution of the order from 02072020 022509170501 with a deadline of up to 02092020


# 772004456933
Unscheduled inspection
Start date: 2020-07-16, end date: —, duration:
Authority:
Purpose of inspection:


# 772004412429
Unscheduled inspection
Start date: 2020-05-20, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 772004220334
Unscheduled inspection
Start date: 2020-01-24, end date: —, duration:
Authority:
Purpose of inspection:


# 771904115353
Unscheduled inspection
Start date: 2019-12-18, end date: —, duration:
Authority:
Purpose of inspection:


# 771903920458
Unscheduled inspection
Start date: 2019-11-01, end date: —, duration:
Authority:
Purpose of inspection:


# 501904145792
Unscheduled inspection
Start date: 2019-11-21, end date: 2019-11-27, duration: 2
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001682175121130775522 dated 12112019 within the framework of regulation 0131173100502 dated 01112019 with a deadline of up to 10012020


# 501904031833
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration:
Authority:
Purpose of inspection:


# 771903800386
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration:
Authority:
Purpose of inspection:


# 771903705758
Unscheduled inspection
Start date: 2019-09-25, end date: 2019-09-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903643836
Unscheduled inspection
Start date: 2019-09-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803477118
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: carrying out control measures in connection with the implementation of the inspection program of the 2nd stage prevention of the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the person carrying out the construction of the requirements of part 3 of Article 52 of the Urban Planning Code compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources.


# 501902961229
Unscheduled inspection
Start date: 2019-08-15, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803467161
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: This audit is conducted in order to carry out control measures in connection with the verification of the fulfillment of the order based on the expiration of the deadline for the fulfillment by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate violations of mandatory requirements dated 24042019 318619. The objectives of this audit are to prevent identify and suppress violations of the requirements of the design documentation of legislation on urban development by the person being audited. The subject of this audit is The purpose is to check the elimination of violations specified in the order issued by Mosgosstroynadzor 318619 dated 24042019


# 501902805014
Unscheduled inspection
Start date: 2019-08-05, end date: 2019-08-30, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po g Moskva Moskovskoi i Tulskoi oblastyam
Purpose of inspection: This audit is conducted in order to comply with the requirements of the previously issued regulation dated 02112018 10229z2018 on the elimination of identified violations, the deadline for which has expired. The objectives of this audit are to conduct an audit to eliminate violations of mandatory requirements of legislation in the field of land supervision as part of the fulfillment of the requirements of the previously issued regulation dated 02112018 10229z2018, the deadline for which has expired. The subject of this audit is the execution of JSC PSO 13 previously issued regulation dated 02112018 10229z2018 on the elimination of identified violations


# 77190803471209
Unscheduled inspection
Start date: 2019-08-02, end date: 2019-08-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: carrying out control measures in connection with the verification of compliance with the prescriptionrevention detection and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the person being checked, verification of the elimination of violations specified in the prescription issued by Mosgosstroynadzor


# 77190803435292
Unscheduled inspection
Start date: 2019-06-10, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803428180
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-06-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: carrying out control measures in connection with the verification of compliance with the prescriptionrevention detection and suppression of violations of the requirements of the design documentation of the legislation on urban development activity by the person being checked, verification of the elimination of violations specified in the prescription issued by Mosgosstroynadzor


# 001902755575
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-07-01, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: Verification of the implementation of regulation 10362238 dated 13/12/2018, namely, verification of the fact of the development and approval of the GO passport, the maintenance program, the technical inspection, the verification of the GO performance indicators and the planned preliminary repair of the manual, the GO operating instructions, as well as the determination of the official responsible for the operation of the GO and the maintenance of the GO passport


# 001902755529
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-07-01, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: Verification of the fulfillment of regulation 10362237 of 13122018, namely, verification of the presentation of the results of production control at sources 001 002 and 003 for substances Nitrogen dioxide Nitrogen oxide Inorganic dust>70 SiO2 Inorganic dust 7020 SiO2 Inorganic dust<20 SiO2 Limit hydrocarbons C12C19


# 501902812599
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-05-29, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: execution of the elimination of violations within the framework of the instruction from 19032019 0128031500501 assessment of the compliance of the work performed with the requirements of technical regulations verification of the availability of permits and design documentation compliance with mandatory requirements established by law at the capital construction facility Multi-storey residential building at Mozhaysk ul. Frunze


# 77190803422211
Unscheduled inspection
Start date: 2019-05-23, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77190803397568
Unscheduled inspection
Start date: 2019-04-15, end date: 2019-04-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: This audit is conducted in order to carry out control measures in connection with the implementation of the inspection program based on the approved inspection program dated 22102018 2The objectives of this audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the person being audited. The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources.


# 77190803407568
Unscheduled inspection
Start date: 2019-04-29, end date: 2019-04-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: carrying out control measures in connection with the implementation of the verification program2nd floor prevention detection and suppression of violations of the requirements of the design documentation of the legislation on urban development activity committed by the audited person. compliance of the work and construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of the technical regulations of the project documentation, including energy efficiency requirements and equipment requirements of the capital construction facility accounting devices for the energy resources used are used to fulfill the requirements of Part 3 of Article 52 of the Urban Planning Code by the person carrying out the construction


# 001902557840
Unscheduled inspection
Start date: 2019-03-14, end date: 2019-04-10, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: Verification of the implementation of regulation 10362239 of 13122018, namely, verification of the fact of submitting an application for state registration of objects that have a negative impact on the environment to the federal executive authority authorized by the Government of the Russian Federation or the executive authority of the subject of the Russian Federation in accordance with their competence


# 77190803371479
Unscheduled inspection
Start date: 2019-03-18, end date: 2019-03-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: This audit is conducted in order to carry out control measures in connection with the verification of the fulfillment of the order based on the expiration of the deadline for the fulfillment by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate violations of mandatory requirements dated 25/122018 1121/2018. The objectives of this audit are to prevent identify and suppress violations of the requirements of the design documentation of legislation on urban development by the person being audited. The subject of this audit is The purpose is to check the elimination of violations specified in the order issued by Mosgosstroynadzor 1121018 dated 25/122018


# 77190803337156
Unscheduled inspection
Start date: 2019-02-13, end date: 2019-02-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the capital construction facility with the requirements of technical regulations and design documentationthe prevention of detection and suppression of violations of technical regulations and design documentationthe compliance of the work performed and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices used energy resources


# 77190803340181
Unscheduled inspection
Start date: 2019-02-21, end date: 2019-02-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: This inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor on the basis of the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate violations of mandatory requirements dated 30112018 1046018the objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The purpose of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 1046018 dated 30112018


# 77180803305524
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803305266
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803292111
Unscheduled inspection
Start date: 2018-12-05, end date: 2018-12-07, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803296162
Unscheduled inspection
Start date: 2018-12-17, end date: 2018-12-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803280578
Unscheduled inspection
Start date: 2018-11-22, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 001802097297
Unscheduled inspection
Start date: 2018-11-14, end date: 2018-12-11, duration:
Authority: Departament Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya po Centralnomu federalnomu okrugu
Purpose of inspection: Identification of violations of the requirements of water land legislation and legislation in the field of production and consumption waste management during the implementation of PSO13 JSC production and economic activities at the addresses 143500 Moscow region Istra Sovetskaya str. d54 Novoierusalimskaya st. 143500 Moscow region Istra Zagorodnaya str. d5 on the basis of the instruction of the Deputy Chairman of the Government of the Russian Federation AV Gordeev dated 19102018 AGP97127


# 77180803256571
Unscheduled inspection
Start date: 2018-10-22, end date: —, duration:
Authority:
Purpose of inspection:


# 001802055604
Unscheduled inspection
Start date: 2018-10-08, end date: 2018-11-02, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po g Moskva Moskovskoi i Tulskoi oblastyam
Purpose of inspection: This audit is conducted in order to comply with the requirements of the previously issued regulation dated 23032018 1023z2018 on the elimination of identified violations, the deadline for which has expired. The objectives of this audit are to conduct an audit to eliminate violations of mandatory requirements of legislation in the field of land supervision as part of the fulfillment of the requirements of the previously issued regulation dated 23032018 1023z2018 on the elimination of identified violations, the deadline for which has expired. The purpose of this audit is to comply with JSC "PSO 13 of the previously issued regulation dated 23032018 1023z2018 on the elimination of identified violations


# 501801487678
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-09-14, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the facts stated in the notice of elimination of violations dated 28082018 P001424846915815638900 as well as the execution of the instruction dated 14062018 0225081100501


# 77180803237094
Unscheduled inspection
Start date: 2018-09-25, end date: —, duration:
Authority:
Purpose of inspection:


# 501800529473
Unscheduled inspection
Start date: 2018-07-05, end date: 2018-07-06, duration:
Authority: Glavnoe upravlenie gosudarstvennogo administrativnotehnicheskogo nadzora Moskovskoi oblasti
Purpose of inspection: The audit is conducted in order to verify the fulfillment of the instructions on the elimination of identified violations from 06042018 10116R. The objectives of this audit are to verify compliance with the requirements established by regulatory legal acts in the field of protection of the population and territories from emergency situations at the address 143500 Moscow region, Istra Chekhov lane house 5. The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts. regulations of state control bodies, supervision of municipal control bodies


# 77180803187315
Unscheduled inspection
Start date: 2018-07-25, end date: 2018-07-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803172681
Unscheduled inspection
Start date: 2018-07-03, end date: —, duration:
Authority:
Purpose of inspection:


# 621800393927
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-21, duration:
Authority: Gosudarstvennaya zhilischnaya inspekciya Ryazanskoi oblasti
Purpose of inspection: compliance with the MP12 regulation from 22032018


# 621800283287
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-03-12, duration:
Authority: Gosudarstvennaya zhilischnaya inspekciya Ryazanskoi oblasti
Purpose of inspection: compliance with the requirements of MP07 from 22022018


# 001800191632
Unscheduled inspection
Start date: 2018-03-12, end date: 2018-04-06, duration:
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po g Moskva Moskovskoi i Tulskoi oblastyam
Purpose of inspection: This audit is conducted in order to comply with the requirements of the previously issued regulation dated 29062017 10138z2017 on the elimination of identified violations, the deadline for which has expired. The objectives of this audit are to conduct an audit to eliminate violations of mandatory requirements of legislation in the field of land supervision as part of the fulfillment of the requirements of the previously issued regulation dated 29062017 10138z2017 on the elimination of identified violations, the deadline for which has expired. The subject of this audit is the execution of JSC "PSO 13 previously issued an order dated 29062017 10138z2017 on the elimination of identified violations


# 501800047720
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-03-09, duration:
Authority: Gosudarstvennaya inspekciya truda v Moskovskoi oblasti
Purpose of inspection: protection of the rights and interests of employees


# 77180803088749
Unscheduled inspection
Start date: 2018-02-27, end date: 2018-02-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 001800003263
Unscheduled inspection
Start date: 2018-01-15, end date: 2018-01-29, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to comply with the order of the Federal Service for Environmental Technological and Nuclear Supervision dated March 15, 2017 No. 85 "On inspections of organizations operating tower cranes" based on the instruction of Deputy Prime Minister of the Russian Federation AG Khloponin dated February 8, 2017 AHP9682 on the organization and conduct in 2017-2019 of unscheduled inspections of organizations operating tower cranes with the objectives of this inspections are aimed at preventing detecting and suppressing violations of mandatory requirements established by federal laws and other regulatory acts of the Russian Federation in the field of industrial safety and technical regulation of mandatory requirements taking measures to eliminate violations of mandatory requirements if they are detected and to bring to justice persons who have violated the requirements of federal laws and other regulatory legal acts The subject of this audit is compliance with legal by a person in the course of carrying out activities of mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacture installation commissioning maintenance and repair of technical devices for lifting cranes used at hazardous production facilities compliance with the specified requirements of buildings, premises, structures, equipment and materials used, as well as requirements for machinery and equipment and processes related to the requirements for these products Operation and disposal


# 77180803058964
Unscheduled inspection
Start date: 2018-01-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77170803012932
Unscheduled inspection
Start date: 2017-12-20, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802760456
Unscheduled inspection
Start date: 2017-10-26, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802167404
Unscheduled inspection
Start date: 2017-09-07, end date: 2017-09-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701708350
Unscheduled inspection
Start date: 2017-07-12, end date: 2017-07-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701686673
Unscheduled inspection
Start date: 2017-06-09, end date: 2017-06-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701637263
Unscheduled inspection
Start date: 2017-05-22, end date: 2017-05-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701477092
Unscheduled inspection
Start date: 2017-03-24, end date: 2017-03-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701339467
Unscheduled inspection
Start date: 2017-02-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701339462
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-01-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 50160701231108
Unscheduled inspection
Start date: 2016-12-15, end date: 2016-12-16, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: execution of the order dated 14112016 0225074400507 assessment of compliance of the performed works with the requirements of technical regulations and design documentation at the capital construction facility Warehouse complex at the address MO Istra district with Pavlovskaya Sloboda


# 50160701239968
Unscheduled inspection
Start date: 2016-12-14, end date: 2016-12-15, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: execution of the order dated 12102016 0225073700503 for the period up to 12112016 assessment of compliance of the performed works with the requirements of technical regulations and project documentation at the capital construction facility Warehouse complex at the address Moscow region Istra district with Pavlovskaya Sloboda


# 77160701258533
Unscheduled inspection
Start date: 2016-12-23, end date: 2016-12-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701135731
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-11-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.