# 001903944170
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-10-31, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the execution of Smolenskregionteploenergo LLC of paragraphs 1133 of the regulation from 06082019 510104vn P00452019. The task of this audit is to verify the elimination by a legal entity of violations of mandatory requirements identified earlier as part of an on-site inspection. The subject of this audit is the execution by a legal entity of paragraphs 1133 of the regulation from 06082019 510104vn P00452019
# 001902619638
Unscheduled inspection
Start date: 2019-04-23, end date: 2019-05-27, duration: —
Authority: Centralnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: assessment of compliance of measurements performed in the field of state regulation to ensure the uniformity of measurements with mandatory requirements
# 001902531301
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-02-20, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the execution of LLC Smolenskregionteploenergo of paragraphs 110 of the regulation on the elimination of identified violations from 15112018 1220465vnP01612018, the deadline for which has expired, The task of this audit is to verify the elimination by a legal entity of violations of mandatory requirements identified earlier as part of an on-site audit The subject of this audit is the execution of LLC Smolenskregionteploenergo of paragraphs 110 of the regulation on the elimination of identified violations from 15112018 1220465vnP01612018
# 001800595962
Unscheduled inspection
Start date: 2018-07-25, end date: 2018-08-21, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: verification of the information contained in the notification on the elimination of inconsistencies with the accreditation criteria submitted by the letter of Smolenskaya Regional Thermal Power Company Smolenskregionteploenergo LLC dated 10072018 494b establishment of the fact of elimination by an accredited person of inconsistencies in his activities with the requirements of the legislation of the Russian Federation to the activities of accredited persons specified in the Notification on the direction of the list of inconsistencies with the accreditation criteria based on the results of the provision of public services for the confirmation of competence dated 21062018 1599904AC compliance with mandatory requirements or requirements established by municipal legal acts
# 001800102145
Unscheduled inspection
Start date: 2018-03-14, end date: 2018-03-27, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to control the execution of LLC Smolenskregionteploenergo of paragraphs 121 of the regulation on the elimination of identified violations dated 14112017 1220486plP01272017, the deadline for which has expired The task of this audit is to verify the elimination by a legal entity of violations of mandatory requirements identified earlier as part of an on-site audit The subject of this audit is the execution of LLC Smolenskregionteploenergo of paragraphs 121 of the regulation on the elimination of identified violations from 14112017 1220486plP01272017
# 00170701558887
Unscheduled inspection
Start date: 2017-04-12, end date: 2017-04-19, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ensuring the execution by a legal entity of the instruction on the elimination of identified violations dated 26082016 1210510vnP02952016, the deadline for which has expired
# 00160601521378
Unscheduled inspection
Start date: 2016-03-01, end date: 2016-03-09, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ensuring the execution by a legal entity of the instruction on the elimination of identified violations dated 12102015 1210664vnP02892015, the deadline for which has expired
# 00160601489248
Unscheduled inspection
Start date: 2016-01-25, end date: 2016-01-28, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: Checking the report on the elimination of inconsistencies based on the results of the PC
# 672101376775
Unscheduled inspection
Start date: 2021-11-25, end date: —, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection:
# 672101238383
Unscheduled inspection
Start date: 2021-10-20, end date: —, duration: 18
Authority: Glavnoe upravlenie "Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti"
Purpose of inspection: verification of the execution of regulation No. 1032/61/2021 of 09/14/2021; elimination of the facts of non-fulfillment (execution) of the measures specified in the audited regulation; fulfillment of the order of the state control body
# 672100713967
Unscheduled inspection
Start date: 2021-09-10, end date: —, duration: 20
Authority: Glavnoe upravlenie "Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti"
Purpose of inspection: verification of the facts set out in the appeal of vh. Zh-03490 dated 06/17/2021; organize a departure to the address: 39/19 Metallurg Ave., Yartsevo,
Smolensk region; compliance with the mandatory requirements of the current legislation of the Russian Federation
# 672100646604
Unscheduled inspection
Start date: 2021-09-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672100770711
Unscheduled inspection
Start date: 2021-09-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672100894597
Unscheduled inspection
Start date: 2021-09-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672100770701
Unscheduled inspection
Start date: 2021-09-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672100480402
Unscheduled inspection
Start date: 2021-08-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672100463055
Unscheduled inspection
Start date: 2021-08-13, end date: —, duration: 3
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: this inspection is carried out for the purpose of: implementation of regional state construction supervision in the territory of the Smolensk region, in accordance with the inspection program dated April 20, 2021;
The subject of this inspection is the inspection:
– compliance of the work and the construction materials and products used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved by the developer, technical customer, person responsible for the operation of the building, structure, or regional operator of the project documentation and (or) information model (if the formation and maintenance of information models are mandatory);
– compliance with the requirement for a construction permit, as well as the parameters of the capital construction facility under construction, under reconstruction, specified in the construction permit;
– membership in a self-regulatory organization in the field of construction;
– ensuring the conservation of the capital construction facility, if necessary, the termination of work or their suspension for more than six months;
– requirements for the procedure for the implementation of construction control established by the Urban Planning Code of the Russian Federation and other regulatory legal acts.
# 672100359739
Unscheduled inspection
Start date: 2021-07-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672100359505
Unscheduled inspection
Start date: 2021-07-16, end date: —, duration: 3
Authority: Glavnoe upravlenie "Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti"
Purpose of inspection: Verification of the execution of regulation No. 0251/50/2021 of 03/17/2021; elimination of the facts of non-fulfillment (execution) of the measures specified in the audited regulation; fulfillment of the order of the state control body
# 672100336691
Unscheduled inspection
Start date: 2021-07-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672100369311
Unscheduled inspection
Start date: 2021-07-20, end date: —, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection:
# 772100249628
Unscheduled inspection
Start date: 2021-06-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672100216412
Unscheduled inspection
Start date: 2021-05-14, end date: —, duration: 12
Authority: Glavnoe upravlenie "Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti"
Purpose of inspection: verification of the execution of regulation No. 0356/69/2021 dated 04/09/2021;
establishment of the facts of execution (non-fulfillment) of the measures specified in the audited regulation;
compliance with the instructions of the state control body
# 672100252310
Unscheduled inspection
Start date: 2021-05-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672100187842
Unscheduled inspection
Start date: 2021-05-20, end date: —, duration: 6
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: this inspection is carried out for the purpose of: implementation of regional state construction supervision in the territory of the Smolensk region, in accordance with the inspection program dated April 20, 2021;
The subject of this inspection is the inspection:
– compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and the requirements of equipping the capital construction facility with metering devices for energy resources used
# 672100166957
Unscheduled inspection
Start date: 2021-04-20, end date: 2021-05-19, duration: 20
Authority: Glavnoe upravlenie "Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti"
Purpose of inspection: verification of the facts set out in the appeal of vh. Zh-01085 dated 03/17/2021; organize a visit to the address: 44 Metallurg Ave., Yartsevo, Smolensk
region; compliance with mandatory requirements of the current legislation of the Russian Federation
# 672100156630
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-05-12, duration: 18
Authority: Glavnoe upravlenie "Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti"
Purpose of inspection: verification of the facts stated in the appeal of the tenant of the apartment building No. 5 on Kalinin Street in Dorogobuzha
Smolensk region (zh-01038 dated 03/16/2021).; to analyze the submitted documents
compliance with the mandatory requirements of the current legislation of the Russian Federation
# 772100178237
Unscheduled inspection
Start date: 2021-04-28, end date: —, duration: 3
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to monitor the implementation of the regulation dated December 30, 2020 No. 5.2-RP-201-1697- O-P/0083-2020;
The objectives of this audit are:
to monitor the measures taken by the legal entity to comply with the regulation and comply with mandatory requirements;
taking measures to eliminate violations of mandatory requirements (if they are detected) and to bring to justice persons who have committed violations of the requirements of Federal laws and other regulatory legal acts.
# 672100116783
Unscheduled inspection
Start date: 2021-04-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672100073991
Unscheduled inspection
Start date: 2021-03-16, end date: 2021-04-12, duration: 20
Authority: Glavnoe upravlenie "Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti"
Purpose of inspection: verification of the facts set out in the address of the owner residing at the address:
Vyazemsky district, Vyazma, Gogol str. 20 (W- 00569 dated 02/12/2021).; arrange departure to Gogol str. 20, Vyazma, Smolensk
region; compliance with mandatory requirements of the current legislation of the Russian Federation
# 672100067775
Unscheduled inspection
Start date: 2021-03-12, end date: 2021-03-17, duration: 4
Authority: Glavnoe upravlenie "Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti"
Purpose of inspection: it is carried out in order to verify the facts set out in the address of the consumer residing at the address: Smolensk
region, Yartsevo, Zaozernaya str., 2b, sq. (Zh-00568 dated 02/12/2021); checking the procedure for calculating the amount of payment for heating utilities for the period of provision
of utilities of inadequate quality
; compliance with mandatory requirements of current legislation of the Russian Federation
# 672100091919
Unscheduled inspection
Start date: 2021-03-24, end date: 2021-04-09, duration: 13
Authority: Glavnoe upravlenie "Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti"
Purpose of inspection: it is carried out in order to verify the facts stated in the appeal of the consumer living at the address: Smolensk
region, Vyazma, Lenin str., 29 (zh-00161 from 01/20/2021);
compliance with the requirements of current legislation, in terms of recalculation
of the amount of heating fees for the period of provision of utility services of inadequate quality;
compliance with the mandatory requirements of the current legislation of the Russian Federation
# 672100015575
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-02-24, duration: 6
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: this inspection is carried out for the purpose of: implementation of regional state construction supervision in the territory of the Smolensk region, in accordance with the inspection program dated April 30, 2020;
The subject of this inspection is the inspection:
– compliance of the work performed and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements (with the exception of capital construction facilities, to which energy efficiency requirements do not apply) and the requirements of equipping the capital construction facility with metering devices for energy resources used
# 772100035662
Unscheduled inspection
Start date: 2021-02-25, end date: 2021-03-03, duration: 5
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the verification is carried out in order to control the execution
Smolenskregionteploenergo LLC paragraphs 1-223
of Regulation No. 5.1-1048vn-P/0062-2020 dated 08/07/2020.
The purpose of this audit is to verify the elimination by a legal entity of violations of mandatory requirements identified earlier as part of an on-site audit
# 672105342904
Unscheduled inspection
Start date: 2021-02-01, end date: 2021-02-24, duration: 17
Authority: Glavnoe upravlenie "Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti"
Purpose of inspection: verification of the facts stated in the address of the owner of a residential building in an apartment building at the address:
33 Sovetskaya str., Yartsevo (Zh-04440 dated 07.12,2020);
checking the procedure for recalculating the amount of the fee for hot water supply;
compliance with the mandatory requirements of the current legislation of the Russian Federation
# 672005285098
Unscheduled inspection
Start date: 2020-12-24, end date: 2020-12-30, duration: 5
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated April 30, 2020. The purpose of this inspection is to verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements for with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used
# 002005298558
Unscheduled inspection
Start date: 2020-12-29, end date: 2020-12-30, duration: 2
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this inspection is to prevent identify and suppress violations of industrial safety requirements of the Technical Regulations on the safety of gas distribution and gas consumption networks approved by Decree of the Government of the Russian Federation dated October 29, 2010 870 during the operation of a hazardous production facility Smolensk region Dorogobuzhsky district SP Mikhailovskoye land plot with cadastral number 67060000000730 as well as the Rules of technical operation of heat supply facilities and heat consuming installations approved by the order Ministry of Energy of the Russian Federation dated March 24, 2003 115 during the operation of power plants, the subject of this inspection is compliance with mandatory requirements
# 672005201280
Unscheduled inspection
Start date: 2020-10-23, end date: 2020-10-30, duration: 6
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated January 10, 2020. The purpose of this inspection is to verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements for with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used
# 672004446458
Unscheduled inspection
Start date: 2020-07-03, end date: 2020-07-09, duration: 5
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated January 10, 2020. The purpose of this inspection is to verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements for with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used
# 672004446456
Unscheduled inspection
Start date: 2020-07-03, end date: 2020-07-09, duration: 5
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated April 30, 2020. The purpose of this inspection is to verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements for with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used
# 002004463662
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-08-07, duration: 20
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to monitor the progress of the preparation of heat supply facilities for operation in the autumn-winter period of 2020-2021 on the basis of the instruction of the Government of the Russian Federation dated July 03, 2020, YUBP97109 and the order of the Federal Service for Environmental Technological and Nuclear Supervision dated July 08, 2020 267 "On monitoring the progress of the preparation of electric power and heat supply facilities for operation in the autumn-winter period of 20202021"the objectives of this audit are to monitor the progress of the preparation of heat supply facilities for operation in the autumn-winter period of 2020-2021
# 672004351866
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672004371750
Unscheduled inspection
Start date: 2020-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672004256919
Unscheduled inspection
Start date: 2020-02-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 672004300599
Unscheduled inspection
Start date: 2020-02-19, end date: 2020-03-04, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the address of the owner residing at Smolenskaya region Yelnya Engels str. d35 05833 dated 31/122019 organize a visit to Smolenskaya region Yelnya Engels str. d35 compliance with the mandatory requirements of the current legislation of the Russian Federation
# 671904145125
Unscheduled inspection
Start date: 2019-12-25, end date: 2019-12-27, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated November 20, 2019. The purpose of this inspection is to verify the compliance of the work and the construction materials used during the construction of the reconstruction of the capital construction facility as well as the results of such work with the requirements of design documentation, including energy efficiency requirements for with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used
# 671904169792
Unscheduled inspection
Start date: 2019-12-30, end date: 2020-02-03, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the address of the owner residing at the address Yartsevo Avyuzavodskaya str. d 14 Vx Z05672 from 19122019 organize a departure to the address Avtozavodskaya str. d 14 Yartsevo Smolensk region
# 671904039595
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-12-24, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the appeals of the owners living at the address Smolensk Regionsmolensky district Bogoroditskoye Viktorova str. d 27 J04873 dated 31102019 organize a visit to Viktorova str. d 27 Bogoroditskoesmolensky district of the Smolensk region compliance with the mandatory requirements of the current legislation of the Russian Federation
# 671904039660
Unscheduled inspection
Start date: 2019-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671904039458
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-12-24, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the appeals of the owners living at the address Smolensk Regionsmolensky district Bogoroditskoye Viktorova str. d 28 Z04991 from 07112019 Z05266 from 221119 Z04679 from 21102019 Z04786 from 24102019 Z05009 from 08112019 organize a departure to the address Viktorova str. d 28 Bogoroditskoesmolensky district of the Smolensk region compliance with mandatory requirements of the current legislation of the Russian Federation
# 671904039532
Unscheduled inspection
Start date: 2019-11-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671903775218
Unscheduled inspection
Start date: 2019-10-01, end date: 2019-10-28, duration: —
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Smolenskoi oblasti
Purpose of inspection: this audit is carried out in order to fulfill a reasoned submission on the appointment of an unscheduled documentary audit dated 27092019 55 on the issue of violation of consumer rights consumer appeals dated 20092019 bx 1114 the objectives of this audit are supervision and control over the fulfillment of mandatory requirements of the legislation of the Russian Federation in the field of consumer protection The subject of this audit is compliance with mandatory requirements
# 001903944170
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-10-31, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the execution of Smolenskregionteploenergo LLC of paragraphs 1133 of the regulation from 06082019 510104vn P00452019. The task of this audit is to verify the elimination by a legal entity of violations of mandatory requirements identified earlier as part of an on-site inspection. The subject of this audit is the execution by a legal entity of paragraphs 1133 of the regulation from 06082019 510104vn P00452019
# 671903183318
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-18, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Smolenskoi oblasti
Purpose of inspection: The purpose of monitoring the execution of a previously issued order on the elimination of violations of land legislation from 15022019, the deadline for which expires, the tasks of this audit are supervision of compliance with legal requirements related to the fulfillment of orders issued by officials of the Federal State Registration Service of Cadastre and Cartography and its territorial bodies within the competence on compliance with the requirements of land legislation and elimination of violations in the field The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 671903458233
Unscheduled inspection
Start date: 2019-09-11, end date: 2019-10-08, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the address of the owner living at the address Vyazma Repina str. d 16A Z03450 from 02082019 organize a trip to the address Repina str. d 16A Vyazma Smolensk region compliance with the mandatory requirements of the current legislation of the Russian Federation
# 671903587784
Unscheduled inspection
Start date: 2019-09-17, end date: 2019-09-20, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated March 29, 2018. The objectives of this inspection are to prevent and suppress violations of the legislation on urban development, including technical regulations, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer contractor. project documentation
# 671902926346
Unscheduled inspection
Start date: 2019-08-06, end date: 2019-08-09, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: the purpose is to carry out regional state construction supervision on the territory of the Smolensk region in accordance with the inspection program dated March 29, 2018. Tasks are to prevent and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer contractor
# 001902955891
Unscheduled inspection
Start date: 2019-07-17, end date: 2019-08-06, duration: —
Authority: Mezhregionalnoe tehnologicheskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the inspection is carried out in order to monitor the progress of preparation of heat supply facilities for operation in the autumn winter period 20192020 on the basis of the order of the Government of the Russian Federation dated June 19, 2019 VMP95084 and the order of the Federal Service for Environmental Technological and Nuclear Supervision dated 04072019 261 "On monitoring the progress of preparation of heat supply facilities for operation in the autumn winter period 20192020" the registration number of the function in the Federal Service for Environmental Technology and Nuclear Supervision of 04072019 261 "On monitoring the progress of preparation of heat supply facilities for operation in the autumn winter period 20192020 the state information system "Federal Register of State and Municipal Services of Functions" 313853436the tasks of this audit are to monitor the progress of preparation of heat supply facilities for operation in the autumn-winter period 2019-2020
# 671903280390
Unscheduled inspection
Start date: 2019-07-26, end date: 2019-08-15, duration: —
Authority: Gosudarstvennaya inspekciya truda v Smolenskoi oblasti
Purpose of inspection: protection of the rights and interests of employees in connection with the consideration of the appeal dated 18072019 677123019OB On violation of labor rights
# 671902855089
Unscheduled inspection
Start date: 2019-07-09, end date: 2019-07-12, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: the purpose is to carry out regional state construction supervision on the territory of the Smolensk region in accordance with the inspection program dated March 29, 2018. Tasks are to prevent and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer contractor
# 001902843232
Unscheduled inspection
Start date: 2019-06-27, end date: 2019-07-11, duration: —
Authority: Zapadnoe mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Centralnogo federalnogo okruga Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: conducting state control and supervision in relation to Smolenskregionteploenergo LLC on the basis of a license application dated 25062019-2028
# 001902619638
Unscheduled inspection
Start date: 2019-04-23, end date: 2019-05-27, duration: —
Authority: Centralnoe mezhregionalnoe territorialnoe upravlenie Federalnogo agentstva po tehnicheskomu regulirovaniyu i metrologii
Purpose of inspection: assessment of compliance of measurements performed in the field of state regulation to ensure the uniformity of measurements with mandatory requirements
# 671902587952
Unscheduled inspection
Start date: 2019-03-20, end date: 2019-04-16, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the appeal of VH Zh00747 organize a visit to the address d 3919 at Metallurgov Ave Yartsevo, Smolensk region compliance with the mandatory requirements of the current legislation of the Russian Federation compliance with the regulatory level and regime for providing public utilities
# 671902552579
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-04-01, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the appeal of VH Zh00625 to organize a departure to the address d 57 Kosmonavtov St., Yartsevo, Smolensk region compliance with the mandatory requirements of the current legislation of the Russian Federation compliance with the regulatory level and regime for providing public utilities
# 671902601760
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-05, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated March 29, 2018. The objectives of this inspection are to prevent and suppress violations of legislation on urban development, including technical regulations, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer contractor. project documentation
# 001902531301
Unscheduled inspection
Start date: 2019-02-18, end date: 2019-02-20, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the execution of LLC Smolenskregionteploenergo of paragraphs 110 of the regulation on the elimination of identified violations from 15112018 1220465vnP01612018, the deadline for which has expired, The task of this audit is to verify the elimination by a legal entity of violations of mandatory requirements identified earlier as part of an on-site audit The subject of this audit is the execution of LLC Smolenskregionteploenergo of paragraphs 110 of the regulation on the elimination of identified violations from 15112018 1220465vnP01612018
# 671902375527
Unscheduled inspection
Start date: 2019-02-01, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Smolenskoi oblasti
Purpose of inspection:
# 671902492463
Unscheduled inspection
Start date: 2019-02-08, end date: 2019-02-18, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated March 29, 2018. The objectives of this inspection are to prevent and suppress violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer contractor Documentation
# 671902492456
Unscheduled inspection
Start date: 2019-02-08, end date: 2019-02-18, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated June 07, 2018. The objectives of this inspection are to prevent and suppress violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer contractor Documentation
# 671902492451
Unscheduled inspection
Start date: 2019-02-08, end date: 2019-02-18, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: This inspection is carried out in order to carry out regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated March 29, 2018. The objectives of this inspection are to prevent and suppress violations of the legislation on urban development, including technical regulations and design documentation, committed by the developer, the customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer contractor Documentation
# 671802043096
Unscheduled inspection
Start date: 2018-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671802043071
Unscheduled inspection
Start date: 2018-11-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671801943409
Unscheduled inspection
Start date: 2018-10-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671800901936
Unscheduled inspection
Start date: 2018-09-03, end date: 2018-09-28, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the execution of regulation 0654732018 of 23052018 establishing the facts of the execution of non-fulfillment of the measures specified in the audited regulation compliance with the instructions of the state control body
# 671800628153
Unscheduled inspection
Start date: 2018-08-15, end date: 2018-08-17, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: implementation of regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated February 06, 2018, prevention and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer contractor
# 671800644679
Unscheduled inspection
Start date: 2018-08-17, end date: 2018-08-24, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: implementation of regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated July 07, 2018, prevention and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer contractor
# 001800595962
Unscheduled inspection
Start date: 2018-07-25, end date: 2018-08-21, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: verification of the information contained in the notification on the elimination of inconsistencies with the accreditation criteria submitted by the letter of Smolenskaya Regional Thermal Power Company Smolenskregionteploenergo LLC dated 10072018 494b establishment of the fact of elimination by an accredited person of inconsistencies in his activities with the requirements of the legislation of the Russian Federation to the activities of accredited persons specified in the Notification on the direction of the list of inconsistencies with the accreditation criteria based on the results of the provision of public services for the confirmation of competence dated 21062018 1599904AC compliance with mandatory requirements or requirements established by municipal legal acts
# 001801491082
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-03, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is carried out in order to control the fulfillment by Smolenskregionteploenergo LLC of paragraphs 25 10 1221 of the regulation on the elimination of identified violations dated 14112017 1220486vnP01272017, the deadline for which has expired The task of this audit is to verify the elimination by a legal entity of violations of mandatory requirements identified earlier as part of an on-site audit The subject of this audit is the execution by Smolenskregionteploenergo LLC of paragraphs 25 10 1221 of the regulation on elimination detected violations from 14112017 1220486vnP01272017
# 671800520980
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-19, duration: —
Authority: Gosudarstvennaya inspekciya truda v Smolenskoi oblasti
Purpose of inspection: protection of the rights and interests of employees in connection with the consideration of the appeal of 22062018 67752218 ON termination of the employment contract at the initiative of the employee
# 67180803168490
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-06-29, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: And fulfilling the instructions of the Deputy Chairman of the Government of the Russian Federation, DN Kozak, on the adoption of exhaustive measures to ensure the implementation of the Federal Law of the Russian Federation of 21072014 209F Z On the State information System of housing and Communal Services given in a letter dated 07052018 DC P 102639 And fulfilling the order of the Head of the Main Department of the State Housing Inspectorate Smolensk Region 51O D of 10052018 on approval of the plangraphy of monitoring the volume of information placed by organizations of the Smolensk region in the state information system of housing and communal services verification of compliance with the requirements of the Federal Law of the Russian Federation of 21072014 209 FZ On the state information system of housing and communal services Performed services rendered measures taken by the licensee to comply with licensing requirements
# 67180803143759
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-06-13, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the appeal of VH J01568 J02084 to organize a departure to the address d 57 Kosmonavtov St., Yartsevo, Smolensk region Compliance with mandatory requirements for the provision of public services to owners and users of premises in apartment buildings and residential buildings
# 671800304646
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-04-24, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: implementation of regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated February 06, 2018, prevention and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer contractor
# 67180803130953
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-05-21, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: this check is carried out in order to verify the facts set out in the appeal to the address Gagarin ul. L Tolstoy d 4 Zh00782 dated 22022018 to analyze the documents provided Compliance with mandatory requirements for the performance by persons managing apartment buildings of services and works for the maintenance and repair of common property in an apartment building in accordance with the requirements of the legislation of the Russian Federation
# 67180803130454
Unscheduled inspection
Start date: 2018-04-24, end date: 2018-05-23, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the execution of regulation 0321812018 of 15032018 elimination of the facts of non-fulfillment of the measures specified in the audited regulation Measures taken by the licensee to comply with the regulations on the elimination of identified violations of licensing requirements
# 001800102145
Unscheduled inspection
Start date: 2018-03-14, end date: 2018-03-27, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to control the execution of LLC Smolenskregionteploenergo of paragraphs 121 of the regulation on the elimination of identified violations dated 14112017 1220486plP01272017, the deadline for which has expired The task of this audit is to verify the elimination by a legal entity of violations of mandatory requirements identified earlier as part of an on-site audit The subject of this audit is the execution of LLC Smolenskregionteploenergo of paragraphs 121 of the regulation on the elimination of identified violations from 14112017 1220486plP01272017
# 671800103512
Unscheduled inspection
Start date: 2018-02-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671800037246
Unscheduled inspection
Start date: 2018-02-02, end date: 2018-02-06, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: implementation of regional state construction supervision in the territory of the Smolensk region in accordance with the inspection program dated December 26, 2017, prevention and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer contractor
# 671800172074
Unscheduled inspection
Start date: 2018-02-28, end date: 2018-03-29, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the appeal of VH Zh00448 organize a departure to the address d 34 on Solnechnaya g Yartsevo street, Smolensk region compliance with the mandatory requirements of the current legislation of the Russian Federation compliance with the regulatory level and regime for providing public utilities
# 67180803062883
Unscheduled inspection
Start date: 2018-01-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671800010000
Unscheduled inspection
Start date: 2018-01-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 671800009979
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-02-13, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the appeal of VH Z06106 organize a departure to the address d 16 Avtozavodskaya street, Yartsevo, Smolensk region compliance with the mandatory requirements of the current legislation of the Russian Federation compliance with the regulatory level and regime for providing public utilities
# 67170803005247
Unscheduled inspection
Start date: 2017-12-14, end date: 2018-01-16, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the appeal Z04857 dated 25102017 to analyze the provided documents and comply with the mandatory requirements of the current legislation of the Russian Federation
# 67170802856769
Unscheduled inspection
Start date: 2017-11-10, end date: 2017-11-30, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the execution of regulation 1378732017 of 18092017 establishing the facts of the execution of non-fulfillment of the measures specified in the audited prescriptionfulfilling the instructions of the state control body
# 67170802853617
Unscheduled inspection
Start date: 2017-11-10, end date: 2017-11-29, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the execution of regulation 1348612017 of 12092017 establishing the facts of the execution of non-fulfillment of the measures specified in the audited prescriptioncompliance with the instructions of the state control body
# 67170802693117
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-31, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the appeal of VH Z04248 Z04242 Organize a departure to the address d 57 Gorky Street, Yartsevo, Smolensk region, compliance with the mandatory requirements of the current legislation of the Russian Federation, compliance with the regulatory level and the regime for providing public utilities
# 67170801971591
Unscheduled inspection
Start date: 2017-09-04, end date: —, duration: —
Authority: —
Purpose of inspection:
# 67170801913855
Unscheduled inspection
Start date: 2017-08-18, end date: 2017-09-12, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: this check is carried out in order to verify the facts set out in the address Safonovo Stroiteley str. d 13 kv 10 Zh02708 dated 19062017 to analyze the documents provided and comply with the mandatory requirements of the current legislation of the Russian Federation
# 67170701832888
Unscheduled inspection
Start date: 2017-07-26, end date: 2017-08-02, duration: —
Authority: Departament gosudarstvennogo stroitelnogo i tehnicheskogo nadzora Smolenskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the territory of the Smolensk region in accordance with the inspection program dated September 27, 2016, prevention and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer contractor
# 67170701726216
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-07-14, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the appeal of vh Ha Zh02360 organize a departure to the address d 33 Solnechnaya g Yartsevo street, Smolensk region compliance with mandatory requirements of the current legislation of the Russian Federation compliance with the regulatory level and the regime for providing public utilities
# 00170701558887
Unscheduled inspection
Start date: 2017-04-12, end date: 2017-04-19, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ensuring the execution by a legal entity of the instruction on the elimination of identified violations dated 26082016 1210510vnP02952016, the deadline for which has expired
# 67170701432789
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-10, duration: —
Authority: Glavnoe upravlenie Gosudarstvennaya zhilischnaya inspekciya Smolenskoi oblasti
Purpose of inspection: verification of the facts set out in the appeal zh 00787 of 16022017 zh 00851 of 20022017 organize a departure to the address Smolensk region g Pochinok Krasnoarmeyskaya str. d62 compliance with the mandatory requirements of the current legislation of the Russian Federation
# 67160601674487
Unscheduled inspection
Start date: 2016-06-14, end date: 2016-06-20, duration: —
Authority: Gosudarstvennaya inspekciya truda v Smolenskoi oblasti
Purpose of inspection: Supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms
# 00160601521378
Unscheduled inspection
Start date: 2016-03-01, end date: 2016-03-09, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ensuring the execution by a legal entity of the instruction on the elimination of identified violations dated 12102015 1210664vnP02892015, the deadline for which has expired
# 00160601489248
Unscheduled inspection
Start date: 2016-01-25, end date: 2016-01-28, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: Checking the report on the elimination of inconsistencies based on the results of the PC
# 00150600735486
Unscheduled inspection
Start date: 2015-09-15, end date: 2015-10-12, duration: —
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Monitoring the progress of preparation of electric power industry organizations and heat supply facilities for operation in the autumn-winter period 20152016