Found 100 inspections:

# 002105297051
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-01-28, duration: 8
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by JSC Svyatogor of the previously issued regulations on the elimination of violations dated 01/24/2020 № Sv-6560-r(P) and dated 02/21/2020 № RP-332-210- o(P). The purpose of this audit is to take measures to control the elimination of violations specified in previously issued regulations dated 01/24/2020 № Sv-6560-r(P) and dated 02/21/2020 № RP-332-210- o(P). The subject of this audit is: compliance with the instructions of the state control (supervision) bodies.


# 002005190927
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-21, duration: 3
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Verification of compliance with the requirements of the environmental legislation of the Russian Federation regarding the geological study of the rational use and protection of subsurface The subject of verification is compliance with the instructions of state supervision bodies. This audit is conducted to establish the fact of non-compliance by JSC Svyatogor with the instructions previously issued by the Ural Interregional Directorate of Rosprirodnadzor to eliminate violations of mandatory requirements from 30032020 138 p 2, the deadline for which is 29012021 on the basis of Letters from JSC "Svyatogor" dated 05102020 3517102


# 002004335200
Unscheduled inspection
Start date: 2020-03-23, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004335293
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration:
Authority:
Purpose of inspection:


# 002004335258
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-23, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by JSC Svyatogor of the instruction on the elimination of identified violations dated 25112019 SV5400RP, the deadline for which has expired 25022020the purpose of this audit is to take measures to control the elimination of violations specified in the instruction dated 25112019 SV5400RP. The purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 002004278144
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-30, duration: 15
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This audit is conducted in order to establish the fact that JSC Svyatogor has failed to comply with the terms of subsurface use license SVE 14613 TE of technical projects and other documentation for the performance of work in accordance with the order of Rosprirodnadzor dated 18072019 17p pursuant to the instruction of the Government of the Russian Federation dated 17062019 AGP94932DSPTHE objectives of this audit are to verify compliance with the requirements of the environmental legislation of the Russian Federation in the field of geological exploration rational use and protection of mineral resources The purpose of the audit is to comply with the mandatory requirements and or requirements established by municipal legal acts


# 002004271841
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-02-21, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is conducted in order to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations dated 18112019 Sv5467rP. The purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instruction dated 18112019 SV5467RP. The purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 002004217146
Unscheduled inspection
Start date: 2020-01-20, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 002004205711
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-24, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to comply with the previously issued instruction from 09092019 Cb3254rp, the deadline for which expires Tasks implementation of measures to monitor the elimination of violations specified in the instruction from 09092019 Cb3254rp Subject to compliance with the instructions of the state control and supervision authorities


# 001903998627
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-25, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the audit program. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is to verify compliance with mandatory requirements in the field of urban development. compliance with the performance of works and the construction materials used during construction the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of a valid construction permit issued by the authorized body


# 001903965123
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-12-06, duration:
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: in order to verify the report on the elimination of identified inconsistencies with the accreditation criteria submitted by the letter of the Open Joint Stock Company "Svyatogor" dated 18102019 3037360 bx 565 dated 18102019the objectives of this audit are to establish the fact that an accredited person has eliminated inconsistencies in his activities with the requirements of the legislation of the Russian Federation for the activities of accredited persons indicated in the Notification of sending a list of inconsistencies with the accreditation criteria based on the results of the provision of public services for the confirmation of competence UFO605 U from 06092019the subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 001903945250
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-11-18, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is carried out in order to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations dated 19072019 CB3013PP. The purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instruction dated 19072019 CB3013PP. The purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 001902954765
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-23, duration: 10
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This audit is conducted in order to establish the fact that JSC Svyatogor has failed to comply with an order previously issued by the Department of Rosprirodnadzor for the Ural Federal District to eliminate identified violations of mandatory requirements dated 23092016 5634, which expired on 02082019. The objectives of this audit are to verify compliance with the requirements of the environmental legislation of the Russian Federation in the field of land supervision. The subject of this verification is to comply with the requirements of state supervision authorities


# 001902983117
Unscheduled inspection
Start date: 2019-08-15, end date: 2019-08-16, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to verify the fulfillment of the previously issued instruction dated 21032018 Cb1351 dsp1, the deadline for which has expired, the objectives of this audit are to take measures to control the elimination of violations specified in the instruction dated 21032018 Cb1351 dsp1, the deadline for which has expired. The subject of this audit is the fulfillment of the instructions of the state control and supervision authorities


# 001902906223
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-09, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the audit program. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is to verify compliance with mandatory requirements in the field of urban development. compliance with the performance of works and the construction materials used during construction the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of a valid construction permit issued by the authorized body


# 001902820836
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-07-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the previously issued regulation dated 24122018 Sv6766rp


# 001902705442
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-06-03, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out within the framework of the federal state construction supervision during the construction and reconstruction of facilities specified in paragraph 51 of Article 6 of the Urban Planning Code of the Russian Federation, with the exception of facilities for which state construction supervision is entrusted by decrees of the President of the Russian Federation to other federal executive authorities registration number 100015154386 To establish that61 This inspection is carried out in order to verify compliance with mandatory requirements in the field of urban planning activities based on the inspection program 62 The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development activities 7 The subject of this audit is compliance with mandatory requirements in the field of urban development activities compliance of work and applied building materials during the construction of a capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body


# 001902666475
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-04-30, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the inspection program dated December 06, 2018. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is compliance with mandatory requirements in the field of urban development, compliance with the performance of works and applied construction materials during the construction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body


# 001902558280
Unscheduled inspection
Start date: 2019-03-13, end date: 2019-03-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by JSC Svyatogor of the instruction on the elimination of identified violations dated 28112018 Sv6083rP 62 The purpose of this audit is to implement measures to control the elimination of violations specified in the instruction dated 28112018 Sv6083rP 7 The subject of this audit is to comply with the instructions of the state control and supervision authorities


# 001902558292
Unscheduled inspection
Start date: 2019-03-13, end date: 2019-03-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the compliance of JSC Svyatogor with the regulations on the elimination of identified violations dated 11102018 Sv5158rP and dated 11102018 Sv5160rP 62 The purpose of this audit is to implement measures to control the elimination of violations specified in the regulations dated 11102018 Sv5158rP and dated 11102018 Sv5160rP 7 The subject of this audit is to comply with the regulations of the state control and supervision authorities


# 001802036340
Unscheduled inspection
Start date: 2018-10-25, end date: 2018-10-31, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Review of documents and inspection of used technical devices at hazardous production facilities for compliance with their mandatory requirements of the Federal Laws of the Russian Federation, regulatory legal and regulatory documents, including Safety Rules approved by Rostechnadzor in accordance with the established procedure, visual inspection of technical devices and the surrounding area, the use of photo and video recordings To verify the facts set out in the appeal of citizen vh O1195 dated 22102018, the application of measures to prevention detection and suppression of violations of mandatory requirements In case of detection of violations of mandatory requirements or unjustified obstruction of control measures, take the measures provided for by law to bring those who committed violations to administrative responsibility in accordance with the Administrative Code of the Russian Federation, Sending materials on violations of mandatory requirements to law enforcement and other authorities to resolve the issue of initiating criminal and administrative cases in accordance with the Administrative Code of the Russian Federation. with their authority


# 001801766774
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-23, duration:
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: The purpose of the audit is to verify the report on the elimination of identified inconsistencies with the accreditation criteria submitted by the letter of the Open Joint Stock Company "Svyatogor" dated 21092018 ex 160245584 ex 731 dated 25092018 The objectives of the audit are to establish the fact that an accredited person has eliminated inconsistencies in his activities with the requirements of the legislation of the Russian Federation for the activities of accredited persons indicated in the Notification of sending a list of inconsistencies with the accreditation criteria based on the results of the provision of public services for the confirmation of competence from 22082018 UFO518U The subject of verification is the observance of mandatory requirements and or requirements established by municipal legal acts


# 001801858892
Unscheduled inspection
Start date: 2018-09-28, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800574082
Unscheduled inspection
Start date: 2018-07-26, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800574058
Unscheduled inspection
Start date: 2018-07-26, end date: 2018-08-01, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to verify compliance with mandatory requirements in the field of urban development. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is to verify compliance with mandatory requirements in the field of urban development. compliance with the performance of works and the construction materials used during the construction of the reconstruction of a capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body


# 001800068605
Unscheduled inspection
Start date: 2018-02-15, end date: 2018-03-02, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations dated 06102017 Sv4819r. The purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instruction dated 06102017 Sv4819r. The subject of this audit is to comply with the instructions of the state control and supervision authorities


# 001800068833
Unscheduled inspection
Start date: 2018-02-16, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800068673
Unscheduled inspection
Start date: 2018-02-16, end date: 2018-03-05, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations dated 05122017 Sv5787r. The purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instruction dated 05122017 Sv5787r. The subject of this audit is to comply with the instructions of the state control and supervision authorities


# 001800098815
Unscheduled inspection
Start date: 2018-02-20, end date: —, duration:
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection:


# 00170803010301
Unscheduled inspection
Start date: 2017-12-14, end date: 2017-12-15, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of measures to control the elimination of violations specified in paragraphs 123, the deadline for which expired 11/122017 regulations from 26062017 Sv2549p


# 00170802757832
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-10-16, duration:
Authority: Uralskoe Mezhregionalnoe upravlenie gosudarstvennogo avtodorozhnogo nadzora Federalnoi sluzhby po nadzoru v sfere transporta
Purpose of inspection: implementation of the previously issued regulation 521c dated 09102017


# 00170802594034
Unscheduled inspection
Start date: 2017-10-11, end date: 2017-10-13, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment of the previously issued regulation dated 27092016 Sv4485pP, the deadline for which has expired. The objectives of this audit are to take measures to control the elimination of violations specified in paragraph 17 of the regulation dated 27092016 Sv4485pP. The subject of this audit is to comply with the regulations of the state control and supervision authorities


# 00170802148380
Unscheduled inspection
Start date: 2017-09-13, end date: 2017-09-15, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of measures to control the elimination of violations specified in paragraphs 1, the deadline for which has expired 13062017 4, the deadline for which has expired 26062017 5, the deadline for which has expired 05072017 236, the deadline for which has expired 18092017 regulations from 05062017 Sv 16 dsp2


# 00170701751816
Unscheduled inspection
Start date: 2017-06-28, end date: 2017-06-30, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose verification of the fulfillment by JSC "Svyatogor" of the points of previously issued prescriptionthe task is to take measures to control the elimination of violations specified in the points of previously issued prescriptionsubject of verification is the fulfillment of the instructions of the state control and supervision authorities


# 00170701751805
Unscheduled inspection
Start date: 2017-06-28, end date: —, duration:
Authority:
Purpose of inspection:


# 00170701686379
Unscheduled inspection
Start date: 2017-06-22, end date: 2017-06-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: implementation of measures to control the elimination of violations specified in paragraphs 123, the deadline for which has expired 10062017 regulations of 22122016 Sv6331p


# 00170701891188
Unscheduled inspection
Start date: 2017-05-29, end date: 2017-05-31, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Visual inspection of the facilities of technical devices and the adjacent territory of EVRAZ NTMK JSC, using, if necessary, photos and videotapes, examination of documents of EVRAZ NTMK JSC 113 Assessment of the reliability of information previously submitted by EVRAZ NTMK JSC to the Ural Rostechnadzor Office on the data actually provided 114 Application of measures to prevent identify and suppress violations of mandatory requirements 115 In case of detection of facts violations of mandatory requirements or unjustified obstruction of control measures to take measures provided for by law to bring those who committed violations to administrative responsibility in accordance with the Administrative Code of the Russian Federation 116 Sending materials on violations of mandatory requirements to law enforcement and other authorities in order to resolve the issue of initiating criminal and administrative cases in accordance with their powers 117 To the person responsible for conducting the audit in a timely manner to enter into the Unified Register of Inspections the necessary information provided for in paragraph 13 of the Rules for the Formation and Maintenance of the unified register of inspections within the time limits established by section IV of these Rules.


# 00170701603536
Unscheduled inspection
Start date: 2017-05-02, end date: 2017-05-11, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: to perform the state function of licensing the activities of the license control of the licensee of JSC Svyatogor for compliance with the established requirements when renewing the license for the following type of activity: "Operation of explosive and fire-hazardous and chemically hazardous production facilities of hazard classes I II and III"


# 00170701502448
Unscheduled inspection
Start date: 2017-04-04, end date: —, duration:
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection:


# 00170701371158
Unscheduled inspection
Start date: 2017-02-06, end date: 2017-03-03, duration: 20
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Verification of the fact that JSC Svyatogor has failed to comply with the previously issued regulation dated 23092016 56356325632 on limiting emissions and harmful physical effects to the level established by the relevant permits, the deadline for which expired on 01022017the objectives of this audit are to verify compliance with the requirements of the environmental legislation of the Russian Federation in the field of atmospheric air protection. The purpose of this audit is to comply with the regulations of state control bodies, supervision bodies, municipal control bodies


# 00170701350669
Unscheduled inspection
Start date: 2017-02-20, end date: 2017-02-22, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The objectives of this audit are to implement measures to control the elimination of violations specified in paragraphs of the regulation dated 27092016 Sv4485pP


# 00160701219577
Unscheduled inspection
Start date: 2016-12-19, end date: 2016-12-20, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the previously issued regulation Cb845 dated 23092016


# 00160701183382
Unscheduled inspection
Start date: 2016-12-19, end date: 2016-12-22, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the fulfillment by JSC "Svyatogor" of the regulations Sv3666p dated 29072016, the deadlines for which have expired


# 00160701230471
Unscheduled inspection
Start date: 2016-12-21, end date: 2016-12-23, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This unscheduled on-site inspection is carried out in order to verify the fulfillment by JSC Svyatogor of the points of the previously issued instruction on the elimination of identified violations dated 27092016 Sv4485pP, the deadline for which has expired


# 00160701021012
Unscheduled inspection
Start date: 2016-10-20, end date: 2016-10-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: to perform the state function of licensing activities and conducting licensing control of the licensee of JSC Svyatogor for compliance with the established requirements when renewing the license for the type of activity "Production of surveying works" on the basis of an application for renewal of the license incoming Cb31070 dated 03102016


# 00160700222726
Unscheduled inspection
Start date: 2016-09-12, end date: —, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00160601689356
Unscheduled inspection
Start date: 2016-06-30, end date: 2016-07-08, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of compliance with the requirements of the Urban Planning Code of the Russian Federation, the requirements of technical regulations, building codes and other regulatory legal acts and design documentation, industrial safety requirements in the implementation of activities for the construction of a capital construction facility


# 00160601483611
Unscheduled inspection
Start date: 2016-02-03, end date: 2016-02-04, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the previously issued regulation Sv2022M dated 03102014


# 00160601505678
Unscheduled inspection
Start date: 2016-02-17, end date: 2016-02-26, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: unscheduled inspection of the previously issued regulation Sv6325p dated 22/12/2015


# 00160601458591
Unscheduled inspection
Start date: 2016-01-14, end date: 2016-01-15, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the previously issued regulation Sv2022M


# 00150600117182
Unscheduled inspection
Start date: 2015-08-03, end date: 2015-08-05, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the elimination of JSC Svyatogor revealed violations specified in regulation 1500132022PT dated 03102014, the deadline for which has expired


# 00150600062819
Unscheduled inspection
Start date: 2015-08-17, end date: 2015-08-19, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Checking the points of a previously issued prescription


# 662100637683
Unscheduled inspection
Start date: 2021-09-13, end date: 2021-10-08, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-19-17/380-20 dated 2020-12-09; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Reconstruction of the ore transshipment site at the station Ivdel-1, located at the address: Sverdlovsk region, Ivdel, the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and requirements equipment of the capital construction facility with metering devices for used energy resources; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100290721
Unscheduled inspection
Start date: 2021-06-18, end date: 2021-07-15, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-19-17/380-20 dated 2020-12-09; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Reconstruction of the ore transshipment site at the station Ivdel-1, located at the address: Sverdlovsk region, Ivdel, the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and requirements equipment of the capital construction facility with metering devices for used energy resources; availability of a construction permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.


# 662100223481
Unscheduled inspection
Start date: 2021-05-19, end date: —, duration: 20
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban planning activities based on the inspection program. The objectives of this audit are to prevent, identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this review is: - compliance with mandatory requirements in the field of urban planning; - compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used; - availability of a valid building permit issued by an authorized body


# 662100223336
Unscheduled inspection
Start date: 2021-05-19, end date: —, duration: 20
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban planning activities based on the inspection program. The objectives of this audit are to prevent, identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this review is: - compliance with mandatory requirements in the field of urban planning; - compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used; - availability of a valid building permit issued by the authorized body.


# 662100214420
Unscheduled inspection
Start date: 2021-05-14, end date: —, duration: 20
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This inspection is conducted in order to verify information about violations of the environmental legislation of the Russian Federation in the field of atmospheric air protection received from the Ministry of Natural Resources and Ecology of the Sverdlovsk Region (letter dated 04/12/2021 No. 12-01-82/8018) regarding the threat of a natural and man-made emergency. The objectives of this audit are: to verify compliance with the requirements of the environmental legislation of the Russian Federation in the field of atmospheric air. The subject of the audit is compliance with mandatory requirements and/or requirements established by municipal legal acts.


# 662100155821
Unscheduled inspection
Start date: 2021-04-19, end date: 2021-05-18, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Sverdlovskoi oblasti
Purpose of inspection: The purpose of this audit is to verify the implementation of the previously issued regulation No. 44 dated 10/30/2019, the organization and conduct of verification of compliance by organizations, as well as officials and citizens of the requirements of the legislation of the Russian Federation in the field of civil defense, including the rules for the operation of technical management systems of civil defense and civil defense facilities, rules for the use and maintenance of warning systems, personal protective equipment protection and other special equipment and property of civil defense.


# 662100146889
Unscheduled inspection
Start date: 2021-04-15, end date: 2021-04-28, duration: 10
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations No. RP-332-4892- about dated 01/25/2021, the deadline for the elimination of which expires on 03/30/2021. The purpose of this audit is to implement measures to control the elimination of violations specified in previously issued regulations of the Russian Federation.-332-4892- about from 01/25/2021. The subject of this audit is: compliance with the regulations of the state control (supervision) bodies.


# 662100114200
Unscheduled inspection
Start date: 2021-04-02, end date: 2021-04-29, duration: 20
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: protection of the rights and interests of employees (in connection with the consideration of an application for violation of labor rights), supervision and control over compliance with labor legislation and other regulatory legal acts containing labor law norms, compliance with mandatory requirements and (or) requirements established by municipal legal acts


# 662100041531
Unscheduled inspection
Start date: 2021-03-15, end date: 2021-03-17, duration: 3
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to carry out federal state supervision in the field of industrial safety during the operation of hazardous production facilities. The tasks are to implement measures to monitor the compliance of JSC Svyatogor with industrial safety requirements during blasting operations at a hazardous production facility. The subject is compliance with mandatory requirements; carrying out measures to prevent harm to the life and health of citizens, natural and man-made emergencies.


# 662100065145
Unscheduled inspection
Start date: 2021-03-23, end date: —, duration: 15
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban planning activities based on the inspection program. The objectives of this audit are to prevent, identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this review is: - compliance with mandatory requirements in the field of urban planning; - compliance of the work performed and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used; - availability of a valid building permit issued by the authorized body.


# 662100025077
Unscheduled inspection
Start date: 2021-02-17, end date: 2021-02-20, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose: to verify the fulfillment by JSC Svyatogor of the points of the previously issued instruction on the elimination of identified violations dated 01/24/2020 № Sv-70-r/p, the deadline for which has expired. Tasks: implementation of measures to control the elimination of violations specified in the regulation dated 24.01.2020 № Sv-70-r/P. Subject: compliance with the instructions of the state control (supervision) bodies dated 01/24/2020 № Sv-70-r/p, the deadline for which has expired.


# 662100008978
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration:
Authority:
Purpose of inspection:


# 002105297085
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-01-28, duration: 8
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by JSC Svyatogor of the instruction on the elimination of identified violations dated 03/23/2020 No. RP-332-669- o(P), the deadline for the elimination of which expires on 31.12.2020. 6.2. The purpose of this audit is to take measures to control the elimination of violations specified in the regulation dated 03/23/2020 № RP-332-669-o(P). 7. The subject of this audit is: compliance with the instructions of the state control (supervision) bodies.


# 002105297051
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-01-28, duration: 8
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by JSC Svyatogor of the previously issued regulations on the elimination of violations dated 01/24/2020 № Sv-6560-r(P) and dated 02/21/2020 № RP-332-210- o(P). The purpose of this audit is to take measures to control the elimination of violations specified in previously issued regulations dated 01/24/2020 № Sv-6560-r(P) and dated 02/21/2020 № RP-332-210- o(P). The subject of this audit is: compliance with the instructions of the state control (supervision) bodies.


# 002105297062
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-01-25, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations dated 03/23/2020 No. RP-332-668- o(N), whose elimination period expires on 31.12.2020. The purpose of this audit is to implement measures to control the elimination of violations specified in the previously issued regulations dated 03/23/2020 No. RP-332-668- o(P). The subject of this audit is: compliance with the instructions of the state control (supervision) bodies.


# 002105297120
Unscheduled inspection
Start date: 2021-01-19, end date: 2021-01-25, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to verify the fulfillment by JSC Svyatogor of the instruction on the elimination of identified violations dated 03/23/2020 No. RP-332-671- o(N), whose elimination period expires on 31.12.2020. The purpose of this inspection is to implement measures to control the elimination of violations specified in the regulation dated 03/23/2020 No. RP-332-671- o(P). The subject of this audit is: compliance with the instructions of the state control (supervision) bodies.


# 002105297081
Unscheduled inspection
Start date: 2021-01-27, end date: 2021-01-29, duration: 3
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations dated 01/24/2020 № Sv-72-r(P). 6.2. The purpose of this audit is to implement measures to control the elimination of violations specified in the previously issued instruction dated 01/24/2020 № Sv-72-r(P). 7. The subject of this audit is: compliance with the instructions of the state control (supervision) bodies.


# 002005190927
Unscheduled inspection
Start date: 2020-10-19, end date: 2020-10-21, duration: 3
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: Verification of compliance with the requirements of the environmental legislation of the Russian Federation regarding the geological study of the rational use and protection of subsurface The subject of verification is compliance with the instructions of state supervision bodies. This audit is conducted to establish the fact of non-compliance by JSC Svyatogor with the instructions previously issued by the Ural Interregional Directorate of Rosprirodnadzor to eliminate violations of mandatory requirements from 30032020 138 p 2, the deadline for which is 29012021 on the basis of Letters from JSC "Svyatogor" dated 05102020 3517102


# 002005193965
Unscheduled inspection
Start date: 2020-10-20, end date: 2020-11-17, duration: 20
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This audit is conducted in order to verify that the business entity complies with the requirements of the legislation of the Russian Federation in the field of nature management and environmental protection at the Request of the Prosecutor General's Office of the Russian Federation dated 05102020 7528522020 on conducting an unscheduled field inspection The objectives of this audit are to verify compliance with the requirements of the environmental legislation of the Russian Federation in the field of geological exploration rational use and protection of subsurface use and protection of water bodies protection of atmospheric air waste management and in the field of land protection, verification of compliance with mandatory requirements and or requirements established by municipal legal acts to prevent harm to the life and health of citizens, harm to animals, plants, the environment, and the prevention of natural and man-made emergencies


# 002004499074
Unscheduled inspection
Start date: 2020-08-26, end date: 2020-08-28, duration: 3
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted to verify compliance with mandatory requirements in the field of urban development based on the inspection program dated December 06, 2018. 62 The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. 7 The subject of this audit is compliance with mandatory requirements in the field of urban development. the construction materials used during the construction of the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body.


# 662004452998
Unscheduled inspection
Start date: 2020-07-13, end date: 2020-07-31, duration: 15
Authority: Glavnoe upravlenie MCHS Rossii po Sverdlovskoi oblasti
Purpose of inspection: execution of the order of the Chairman of the Government of the Russian Federation Yuborisov dated 25062020 YUBP46808THE task is to assess the compliance of activities carried out by a legal entity, an individual entrepreneur, or actions of inaction with mandatory fire safety requirements. Subject of the audit is to verify compliance with legislation in the field of fire safety in children's health camps


# 662004406619
Unscheduled inspection
Start date: 2020-04-30, end date: 2020-05-29, duration:
Authority: Gosudarstvennaya inspekciya truda v Sverdlovskoi oblasti
Purpose of inspection: implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with information about violations of the requirements of labor legislation and labor protection specified in the citizen's appeal reg 667289020 and dated 22042020


# 002004335200
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-04-06, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the audit program. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is to verify compliance with mandatory requirements in the field of urban development. compliance with the performance of works and the construction materials used during construction the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of a valid construction permit issued by the authorized body


# 002004335329
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-23, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations from 20122019 SV6137PP, the deadline for which expires 02032020the purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instructions from 20122019 SV6137PPTHE purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 002004335293
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-23, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by JSC Svyatogor of the instruction on the elimination of identified violations dated 08102019 SV4701PP, the deadline for which expires on 28022020the purpose of this audit is to take measures to control the elimination of violations specified in the instruction dated 08102019 SV4701PPTHE purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 002004335258
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-23, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by JSC Svyatogor of the instruction on the elimination of identified violations dated 25112019 SV5400RP, the deadline for which has expired 25022020the purpose of this audit is to take measures to control the elimination of violations specified in the instruction dated 25112019 SV5400RP. The purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 002004278144
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-30, duration: 15
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This audit is conducted in order to establish the fact that JSC Svyatogor has failed to comply with the terms of subsurface use license SVE 14613 TE of technical projects and other documentation for the performance of work in accordance with the order of Rosprirodnadzor dated 18072019 17p pursuant to the instruction of the Government of the Russian Federation dated 17062019 AGP94932DSPTHE objectives of this audit are to verify compliance with the requirements of the environmental legislation of the Russian Federation in the field of geological exploration rational use and protection of mineral resources The purpose of the audit is to comply with the mandatory requirements and or requirements established by municipal legal acts


# 002004271841
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-02-21, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is conducted in order to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations dated 18112019 Sv5467rP. The purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instruction dated 18112019 SV5467RP. The purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 002004217146
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-24, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is conducted in order to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations dated 13092019 Sv3852rP. The purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instruction dated 13092019 Sv3852rP. The subject of this audit is the fulfillment of the instructions of the state control and supervision authorities


# 002004205711
Unscheduled inspection
Start date: 2020-01-20, end date: 2020-01-24, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to comply with the previously issued instruction from 09092019 Cb3254rp, the deadline for which expires Tasks implementation of measures to monitor the elimination of violations specified in the instruction from 09092019 Cb3254rp Subject to compliance with the instructions of the state control and supervision authorities


# 001904153929
Unscheduled inspection
Start date: 2019-12-20, end date: 2020-01-24, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the inspection program dated December 06, 2018. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is compliance with mandatory requirements in the field of urban development, compliance with the performance of works and applied construction materials during the construction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body


# 001904049326
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-20, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations dated 25102019 SV4935RPTHE purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instructions dated 25102019 SV4935RPTHE purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 661904064021
Unscheduled inspection
Start date: 2019-11-29, end date: 2019-12-26, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to prevent a threat to the health and life of citizens from environmental pollution. The inspection is carried out on the basis of a written request from GRD VH 66064965j2019 dated 14112019 37364j2019 dated 29102019 with a complaint about the release of harmful gases into the atmosphere of Krasnouralsk by JSC Svyatogor. The objectives of this inspection are to check compliance with the requirements of sanitary legislation


# 001903998539
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-25, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by JSC Svyatogor of the instruction on the elimination of identified violations dated 03062019 SW2083PP, the deadline for which has expired on 02092019the purpose of this audit is to take measures to control the elimination of violations specified in the instruction dated 03062019 SW2083PPTHE subject of this audit is to comply with the instructions of the state control and supervision authorities


# 001903998627
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-25, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify compliance with mandatory requirements in the field of urban development based on the audit program. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is to verify compliance with mandatory requirements in the field of urban development. compliance with the performance of works and the construction materials used during construction the capital construction facility, as well as the results of such work, meet the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, and the availability of a valid construction permit issued by the authorized body


# 001903965123
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-12-06, duration:
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: in order to verify the report on the elimination of identified inconsistencies with the accreditation criteria submitted by the letter of the Open Joint Stock Company "Svyatogor" dated 18102019 3037360 bx 565 dated 18102019the objectives of this audit are to establish the fact that an accredited person has eliminated inconsistencies in his activities with the requirements of the legislation of the Russian Federation for the activities of accredited persons indicated in the Notification of sending a list of inconsistencies with the accreditation criteria based on the results of the provision of public services for the confirmation of competence UFO605 U from 06092019the subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 001903945250
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-11-18, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is carried out in order to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations dated 19072019 CB3013PP. The purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instruction dated 19072019 CB3013PP. The purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 001903772511
Unscheduled inspection
Start date: 2019-10-02, end date: 2019-10-08, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by JSC Svyatogor of the instruction on the elimination of identified violations dated 26032019 SW1029PP, the deadline for which expires on 01102019the purpose of this audit is to take measures to control the elimination of violations specified in the instruction dated 26032019 SW1029PPTHE purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 661903878265
Unscheduled inspection
Start date: 2019-10-21, end date: —, duration:
Authority:
Purpose of inspection:


# 661903850517
Unscheduled inspection
Start date: 2019-10-16, end date: —, duration:
Authority:
Purpose of inspection:


# 001903860615
Unscheduled inspection
Start date: 2019-10-14, end date: 2019-10-22, duration: 7
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This audit is conducted in order to establish the fact that JSC Svyatogor has failed to comply with the previously issued instruction dated 02082019 3421 deadline 01102019the objectives of this audit are to verify compliance with the requirements of the environmental legislation of the Russian Federation regarding the use and protection of water bodiesthe purpose of this audit is to comply with the instructions of state control bodies, municipal control bodies


# 001903853134
Unscheduled inspection
Start date: 2019-10-15, end date: 2019-10-25, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by JSC Svyatogor of the previously issued regulations on the elimination of violations dated 21012019 SV6729PP dated 05022019 SV6732PPTHE purpose of this audit is to implement measures to control the elimination of violations specified in the previously issued regulations dated 21012019 Sv6729pP dated 05022019 SV6732PPTHE purpose of this audit is to comply with the regulations of the state control and supervision bodies


# 001902986414
Unscheduled inspection
Start date: 2019-09-09, end date: 2019-09-13, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is conducted in order to verify the fulfillment by JSC Svyatogor of the previously issued instruction on the elimination of violations dated 30042019 SV1782. The purpose of this audit is to take measures to control the elimination of violations specified in the previously issued instruction dated 30042019 SV1782. The purpose of this audit is to comply with the instructions of the state control and supervision authorities


# 001902954765
Unscheduled inspection
Start date: 2019-08-12, end date: 2019-08-23, duration: 10
Authority: Uralskoe mezhregionalnoe upravlenie Federalnoi sluzhby po nadzoru v sfere prirodopolzovaniya
Purpose of inspection: This audit is conducted in order to establish the fact that JSC Svyatogor has failed to comply with an order previously issued by the Department of Rosprirodnadzor for the Ural Federal District to eliminate identified violations of mandatory requirements dated 23092016 5634, which expired on 02082019. The objectives of this audit are to verify compliance with the requirements of the environmental legislation of the Russian Federation in the field of land supervision. The subject of this verification is to comply with the requirements of state supervision authorities


# 001902983117
Unscheduled inspection
Start date: 2019-08-15, end date: 2019-08-16, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to verify the fulfillment of the previously issued instruction dated 21032018 Cb1351 dsp1, the deadline for which has expired, the objectives of this audit are to take measures to control the elimination of violations specified in the instruction dated 21032018 Cb1351 dsp1, the deadline for which has expired. The subject of this audit is the fulfillment of the instructions of the state control and supervision authorities


# 661902944946
Unscheduled inspection
Start date: 2019-08-14, end date: 2019-09-10, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Sverdlovskoi oblasti
Purpose of inspection: the purpose is to fulfill the instruction of the Chairman of the Government of the Russian Federation dated 30072019 YBP46516 the task is to assess the compliance of activities or actions inaction carried out by a legal entity or individual entrepreneur with mandatory fire safety requirements the subject of the audit is to verify compliance with legislation in the field of fire safety of children's health camps


# 661902921853
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-28, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to prevent a threat to the health and life of citizens from environmental pollution. The inspection is carried out on the basis of the expiration of the deadline for the elimination of identified violations of sanitary and epidemiological requirements 6606113725832019 dated 24072019. The objectives of this inspection are to conduct an inspection with tests for compliance with the requirements of sanitary legislation


# 001902906904
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-07, duration:
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The audit is conducted to verify compliance with mandatory requirements in the field of urban development based on the inspection program dated December 06, 2018. The objectives of this audit are to prevent identify and suppress violations in the implementation of measures to monitor compliance with the requirements of legislation on urban development. The subject of this audit is compliance with mandatory requirements in the field of urban development, compliance with the performance of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used, and the availability of a valid construction permit issued by the authorized body


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.