# 001904115385
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-18, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the activities of legal licindividual entrepreneurs in compliance with the requirements of legislation on urban development of mandatory norms and rules during the construction of a capital construction facility in order to verify the fulfillment of regulation 23104764933379PR462 of 09122019 on notification of the elimination of violations of 10122019 5782149 bx 113258 of 10122019 The objectives of this audit are to monitor compliance by legal entities individual entrepreneurs with the requirements of legislation on urban development mandatory rules and regulations prevention detection and suppression of violations of the legislation on urban planning activities, including project documentationthe subject of this audit is to comply with the instructions of the state control and supervision bodies
# 001904081674
Unscheduled inspection
Start date: 2019-11-25, end date: —, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 001903940775
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-12-09, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the activities of legal licindividual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in connection with the notice of completion of construction 4882149 dated 23102019 bx 1113014 dated 24102019, the objectives of this audit are to monitor compliance by legal entities individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and the suppression of violations of the legislation on urban development activities, including project documentation, the purpose of this audit is to note the necessary compliance with the mandatory requirements of the legislation on urban development activities, compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which the requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources the availability of a construction permit for persons carrying out construction to comply with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation compliance with the instructions of state control and supervision bodies
# 001902538670
Unscheduled inspection
Start date: 2019-03-05, end date: 2019-04-02, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility in accordance with the inspection program dated 12122018 bn the objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development 7 The subject of this audit is to note the necessary V compliance with mandatory requirements of legislation on urban planning activities V compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of project documentation including energy efficiency requirements with the exception of capital construction projects for which energy efficiency requirements the requirements for equipping a capital construction facility with metering devices for used energy resources also do not apply
# 001802150575
Unscheduled inspection
Start date: 2018-11-29, end date: 2018-12-05, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the activities of legal licindividual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in order to verify the fulfillment of the prescription from 25082017 23104747312788PR2017, the deadline for which has expired, the objectives of this audit are to monitor compliance by legal entities individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression violations of the legislation on urban planning activities, including project documentation, The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 001800104934
Unscheduled inspection
Start date: 2018-03-22, end date: 2018-03-30, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of regulation 0770393603PR124 of 26102017 The task is to take measures provided for by the legislation of the Russian Federation to suppress and eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who committed violations of the requirements of Federal laws and other regulatory legal acts compliance with the instructions of the state control and supervision bodies
# 001800038252
Unscheduled inspection
Start date: 2018-02-20, end date: —, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 00170701399072
Unscheduled inspection
Start date: 2017-02-28, end date: —, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:
# 782004438480
Unscheduled inspection
Start date: 2020-06-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 782004438474
Unscheduled inspection
Start date: 2020-06-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001904174669
Unscheduled inspection
Start date: 2019-12-20, end date: 2019-12-27, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including design Documentationthe subject of this audit is compliance with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipping the capital construction facility with metering devices for energy resources used permits for construction fulfillment by persons carrying out construction of the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001904174661
Unscheduled inspection
Start date: 2019-12-23, end date: 2019-12-27, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the implementation of the previously issued legal regulation 23132467593365pr408 dated 06122019the objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development activities mandatory norms and rules prevention detection and suppression of violations of legislation on urban development activities, including project documentation The subject of this audit is compliance with mandatory requirements of legislation on urban development activities, compliance with the performance of works and the construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work meet the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used, the presence of construction permits by persons carrying out construction of the requirements of parts 2 3 and 31 of the article 52 of the Urban Planning Code of the Russian Federation
# 001904115385
Unscheduled inspection
Start date: 2019-12-16, end date: 2019-12-18, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the activities of legal licindividual entrepreneurs in compliance with the requirements of legislation on urban development of mandatory norms and rules during the construction of a capital construction facility in order to verify the fulfillment of regulation 23104764933379PR462 of 09122019 on notification of the elimination of violations of 10122019 5782149 bx 113258 of 10122019 The objectives of this audit are to monitor compliance by legal entities individual entrepreneurs with the requirements of legislation on urban development mandatory rules and regulations prevention detection and suppression of violations of the legislation on urban planning activities, including project documentationthe subject of this audit is to comply with the instructions of the state control and supervision bodies
# 001904081674
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-12-06, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of this audit is to monitor the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in accordance with the inspection program dated 31/102019 The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban planning activities, including design documentationthe subject of this audit is to comply with the mandatory requirements of legislation on urban planning activities, compliance of the work and construction materials used in the construction process of reconstruction of a capital construction facility, as well as the results of such work, with the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipment of the facility capital construction with metering devices for energy resources used, the presence of a construction permit for persons carrying out construction to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 001903940775
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-12-09, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the activities of legal licindividual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in connection with the notice of completion of construction 4882149 dated 23102019 bx 1113014 dated 24102019, the objectives of this audit are to monitor compliance by legal entities individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and the suppression of violations of the legislation on urban development activities, including project documentation, the purpose of this audit is to note the necessary compliance with the mandatory requirements of the legislation on urban development activities, compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of project documentation, including energy efficiency requirements, with the exception of capital construction facilities for which the requirements of energy efficiency do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources the availability of a construction permit for persons carrying out construction to comply with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation compliance with the instructions of state control and supervision bodies
# 471903015712
Unscheduled inspection
Start date: 2019-08-28, end date: 2019-08-30, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Leningradskoi oblasti
Purpose of inspection: execution of the protocol of operational broadcasting of the Security Council of the Russian Federation of 30052019 approved by the President of the Russian Federation 06062019
# 001902867706
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-08-06, duration: —
Authority: Federalnaya sluzhba po akkreditacii
Purpose of inspection: The audit is carried out in order to verify the information contained in the report on the elimination of inconsistencies with the accreditation criteria provided by the letter of the Federal State Budgetary Educational Institution of St. Petersburg University of the Ministry of Emergency Situations of Russia dated 05072019 ex 30272247 ex NWFO782 dated 04072019 The objectives of the audit are to establish the fact that an accredited person eliminates inconsistencies in his activities with the requirements of the legislation of the Russian Federation to the activities of accredited persons specified in the Notification of sending a list of inconsistencies with the accreditation criteria based on the results the provision of public services to confirm the competence of NWFO115U from 20052019the subject of verification is compliance with mandatory requirements
# 781902737133
Unscheduled inspection
Start date: 2019-05-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 781902737212
Unscheduled inspection
Start date: 2019-05-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 251902687971
Unscheduled inspection
Start date: 2019-05-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902538670
Unscheduled inspection
Start date: 2019-03-05, end date: 2019-04-02, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility in accordance with the inspection program dated 12122018 bn the objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development 7 The subject of this audit is to note the necessary V compliance with mandatory requirements of legislation on urban planning activities V compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of project documentation including energy efficiency requirements with the exception of capital construction projects for which energy efficiency requirements the requirements for equipping a capital construction facility with metering devices for used energy resources also do not apply
# 001802150575
Unscheduled inspection
Start date: 2018-11-29, end date: 2018-12-05, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the activities of legal licindividual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the reconstruction of a capital construction facility in order to verify the fulfillment of the prescription from 25082017 23104747312788PR2017, the deadline for which has expired, the objectives of this audit are to monitor compliance by legal entities individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression violations of the legislation on urban planning activities, including project documentation, The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 251801855959
Unscheduled inspection
Start date: 2018-10-23, end date: 2018-10-31, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Primorskomu krayu
Purpose of inspection: control over the execution of the instruction to eliminate violations of mandatory fire safety requirements from 27092017 11311, the deadline for which expires on 02/102018, the objectives of this audit are to verify compliance with fire safety requirements and take measures based on the results of the audit
# 781800247748
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-05-16, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: in order to control the elimination of violations of fire safety requirements specified in regulation 21847111 on the elimination of violations of fire safety requirements dated July 14, 2017, the objectives of this audit are to identify, suppress and prevent possible violations of fire safety requirements, carry out systematic monitoring of compliance with fire safety requirements The subject of this audit is compliance with fire safety requirements at the protection facility used by the organization in the process carrying out their activities
# 781800247719
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-05-16, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po g SanktPeterburgu
Purpose of inspection: in order to control the elimination of violations of fire safety requirements specified in regulation 21847211 on the elimination of violations of fire safety requirements dated July 14, 2017, the objectives of this audit are to identify, suppress and prevent possible violations of fire safety requirements, carry out systematic monitoring of compliance with fire safety requirements The subject of this audit is compliance with fire safety requirements at the protection facility used by the organization in the process carrying out their activities
# 001800104934
Unscheduled inspection
Start date: 2018-03-22, end date: 2018-03-30, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose is to monitor the measures taken by a legal entity, an individual entrepreneur, to eliminate violations of mandatory requirements in connection with the expiration of the deadline for the execution of regulation 0770393603PR124 of 26102017 The task is to take measures provided for by the legislation of the Russian Federation to suppress and eliminate violations of mandatory requirements in case of their detection and to bring to justice persons who committed violations of the requirements of Federal laws and other regulatory legal acts compliance with the instructions of the state control and supervision bodies
# 001800038252
Unscheduled inspection
Start date: 2018-02-20, end date: 2018-03-22, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the activities of legal licindividual entrepreneurs in compliance with the requirements of legislation on urban planning, mandatory norms and rules during the construction of a capital construction facility in accordance with the inspection program dated 29112017 bn
# 00170801929518
Unscheduled inspection
Start date: 2017-07-31, end date: 2017-08-25, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility in accordance with the inspection program dated 18012016 bn and in order to verify the regulations of 28032017 2310471223964pr60, the tasks of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and the suppression of violations of legislation on urban development activities, including technical regulations and project documentation 7 The subject of this audit is to note the necessary compliance with the mandatory requirements of legislation on urban development activities, compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, the presence of a construction permit by persons carrying out construction of the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation, Compliance with the instructions of state control and supervision bodies
# 78170701660730
Unscheduled inspection
Start date: 2017-06-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 78170701660669
Unscheduled inspection
Start date: 2017-06-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170701381601
Unscheduled inspection
Start date: 2017-02-15, end date: 2017-03-12, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This check is carried out in order to verify the fulfillment of the previously issued instruction from 15112016 290NSS on the elimination of identified violations at the specified capital construction facility in connection with the notification received from 07022017 bx 13 on the elimination of violations before the expiration of the period specified in the prescriptionthe tasks of this check are to establish the fact of elimination of previously identified violations checking the actually performed works in accordance with the prescribed measures The subject of this check it is the fulfillment of a legal order of the body carrying out regional state construction supervision, the deadline for which expires on the DATE respectively
# 00170701399072
Unscheduled inspection
Start date: 2017-02-28, end date: 2017-03-28, duration: —
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: in order to control the activities of legal licindividual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility in accordance with the inspection program dated 18012016 bn and in order to verify the fulfillment of the previously issued prescription dated 26122016 23104790613801pr437, the tasks of this audit are to monitor compliance by legal entities individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development activities, including technical regulations and project documentation The subject of this audit is to note the necessary compliance with mandatory requirements of legislation on urban development activities, compliance of work and construction materials used in the construction process of reconstruction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy requirements the efficiency and equipment requirements of the capital construction facility with metering devices for energy resources used, the presence of a construction permit by persons carrying out construction of the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation, Compliance with the instructions of state control and supervision bodies
# 24170701399943
Unscheduled inspection
Start date: 2017-02-22, end date: 2017-03-24, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This unscheduled inspection is carried out in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the notification received from 14022017 bx 39 on the completion of the construction of the capital construction facility. The objectives of this unscheduled inspection are to prevent identify and suppress violations of legislation on urban planning activities, including technical regulations and design documentationcheck compliance of work and applied construction materials in the process of construction of a capital construction facility as well as the results of such work to the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, all acts prescriptions notices on the elimination of violations of deficiencies identified during the implementation of regional state construction supervision Verification of a construction permit Verification of a certificate are subject to verification on admission to the types of work on the construction of a capital construction facility that affect the safety of a capital construction facility
# 78160601593216
Unscheduled inspection
Start date: 2016-05-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 78160601593211
Unscheduled inspection
Start date: 2016-05-23, end date: —, duration: —
Authority: —
Purpose of inspection: