# 00170701837872
Unscheduled inspection
Start date: 2017-07-19, end date: 2017-07-21, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the information set out in the appeal dated 22062017 vh O578VO Vaivichenskiy P on violations of the legislation in the field of industrial safety by the branch of Gazprom Gazoraspredelenie Volgograd JSC in the city of Kotovo


# 00160601600290
Unscheduled inspection
Start date: 2016-04-25, end date: 2016-05-06, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the information set out in the appeal dated 18042016 vx O368VO Commodity TI


# 00160601460846
Unscheduled inspection
Start date: 2016-01-14, end date: —, duration:
Authority: Upravlenie gosavtodornadzora po Volgogradskoi oblasti
Purpose of inspection: compliance with regulation 28 of 03122015


# 341903920867
Unscheduled inspection
Start date: 2019-10-30, end date: 2019-11-27, duration:
Authority: Administraciya gorodskogo okruga gorod Frolovo Volgogradskoi oblasti
Purpose of inspection: This check is carried out in order to review information received from the state authorities of the Russian Federation from 08082019 5617 on the facts of violation by a specialized organization of the requirements of the Rules for using gas in terms of ensuring safety when using and maintaining indoor and indoor gas equipment when providing utility services for gas supply approved by the decree of the Government of the Russian Federation from 14052013 g 410 in terms of non-fulfillment in 2018 maintenance and repair of indoor gas equipment that is part of the common property of an apartment building 4 on Kommunisticheskaya Street in Frolovo, Volgograd region, the objectives of this audit are to monitor compliance by legal entities with mandatory requirements for the maintenance and use of common property in an apartment building 7 The subject of this audit is compliance with mandatory requirements or requirements established by municipal legal acts


# 00170701837872
Unscheduled inspection
Start date: 2017-07-19, end date: 2017-07-21, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the information set out in the appeal dated 22062017 vh O578VO Vaivichenskiy P on violations of the legislation in the field of industrial safety by the branch of Gazprom Gazoraspredelenie Volgograd JSC in the city of Kotovo


# 00170701642741
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-07, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Control of the activities of a legal entity in connection with the expiration of the deadline for the execution of the Act issued by the state supervisory authority on the investigation of a fatal group accident that occurred on July 28, 2016


# 34170701628137
Unscheduled inspection
Start date: 2017-05-16, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Volgogradskoi oblasti
Purpose of inspection:


# 34170701515914
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Volgogradskoi oblasti
Purpose of inspection: control of a previously issued prescription


# 34170701515864
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Volgogradskoi oblasti
Purpose of inspection: control of previously issued prescriptions


# 34170701515808
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Volgogradskoi oblasti
Purpose of inspection: control of a previously issued prescription


# 34170701515383
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-10, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Volgogradskoi oblasti
Purpose of inspection: control of a previously issued prescription


# 34170701515772
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Volgogradskoi oblasti
Purpose of inspection: Control of a previously issued prescription


# 34170701515270
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Volgogradskoi oblasti
Purpose of inspection: control of a previously issued prescription


# 34170701512169
Unscheduled inspection
Start date: 2017-03-03, end date: 2017-03-31, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Volgogradskoi oblasti
Purpose of inspection: control of a previously issued prescription


# 34170701369710
Unscheduled inspection
Start date: 2017-02-02, end date: —, duration:
Authority:
Purpose of inspection:


# 34160701071907
Unscheduled inspection
Start date: 2016-11-07, end date: —, duration:
Authority:
Purpose of inspection:


# 34160701017701
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-10-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentationthe purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works with their results and applied building materials with the requirements of technical regulations of project documentation


# 34160701012800
Unscheduled inspection
Start date: 2016-10-17, end date: 2016-10-25, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and design documentationthe purpose of this audit is to prevent identify and suppress violations of the legislation of the Russian Federation, including technical regulations and design documentationthe subject of this audit is compliance with mandatory requirements in relation to the compliance of construction works with their results and applied building materials with the requirements of technical regulations, project documentation and the availability of a construction permit


# 34160700845388
Unscheduled inspection
Start date: 2016-09-22, end date: 2016-10-17, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Volgogradskoi oblasti
Purpose of inspection: Control over the execution of a previously issued prescription


# 34160700760122
Unscheduled inspection
Start date: 2016-09-22, end date: 2016-09-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work


# 34160700760101
Unscheduled inspection
Start date: 2016-09-22, end date: 2016-09-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work


# 34160700595564
Unscheduled inspection
Start date: 2016-09-02, end date: 2016-09-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of the Facility with the requirements of technical regulations of other regulatory legal acts and project documentationthe task is to ensure that the Facility meets the requirements of technical regulations of other regulatory legal acts and project documentationthe subject is compliance with mandatory requirements regarding the compliance of construction works with their results and applied building materials with the requirements of technical regulations of other regulatory legal acts and project documentation


# 34160700106077
Unscheduled inspection
Start date: 2016-09-02, end date: —, duration:
Authority:
Purpose of inspection:


# 34160700556755
Unscheduled inspection
Start date: 2016-09-20, end date: 2016-09-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work


# 34160700929526
Unscheduled inspection
Start date: 2016-09-27, end date: 2016-10-24, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Volgogradskoi oblasti
Purpose of inspection: verification of the facts indicated in the appeal


# 34160700863018
Unscheduled inspection
Start date: 2016-09-27, end date: 2016-09-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of the Facility with the requirements of technical regulations of other regulatory legal acts and project documentationthe task is to ensure that the Facility meets the requirements of technical regulations of other regulatory legal acts and project documentationthe subject is compliance with mandatory requirements regarding the compliance of construction works with their results and applied building materials with the requirements of technical regulations of other regulatory legal acts and project documentation


# 34160700829514
Unscheduled inspection
Start date: 2016-09-26, end date: 2016-09-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work


# 34160700124806
Unscheduled inspection
Start date: 2016-09-06, end date: —, duration:
Authority:
Purpose of inspection:


# 34160700725462
Unscheduled inspection
Start date: 2016-09-14, end date: —, duration:
Authority:
Purpose of inspection:


# 34160700759863
Unscheduled inspection
Start date: 2016-09-13, end date: 2016-10-10, duration:
Authority: Gosudarstvennaya inspekciya truda v Volgogradskoi oblasti
Purpose of inspection: verification of the employer's compliance with the requirements of labor legislation and other regulatory legal acts containing labor law norms in the course of its activities, the implementation of federal state supervision over the employer's compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the receipt by the State Labor Inspectorate in the Volgograd region of an employee's appeal about the violation by the employer of his labor rights vx 277316OB of 26082016 compliance by the employer with labor legislation and other regulatory legal acts containing labor law norms compliance with mandatory requirements or requirements established by municipal legal acts


# 34160601772863
Unscheduled inspection
Start date: 2016-08-04, end date: 2016-08-31, duration:
Authority: Gosudarstvennaya inspekciya truda v Volgogradskoi oblasti
Purpose of inspection: verification of the employer's compliance with the requirements of labor legislation and other regulatory legal acts containing labor law norms in the course of its activities, the implementation of federal state supervision over the employer's compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the receipt by the State Labor Inspectorate in the Volgograd region of employee statements about violation of his labor rights vx 7252016OB of 27072016 compliance by the employer with labor legislation and other regulatory legal acts containing labor law norms, compliance with mandatory requirements or requirements established by municipal legal acts


# 34160601738007
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of the Facility with the requirements of technical regulations of other regulatory legal acts and project documentationthe task is to ensure that the Facility meets the requirements of technical regulations of other regulatory legal acts and project documentationthe subject is compliance with mandatory requirements regarding the compliance of construction works with their results and applied building materials with the requirements of technical regulations of other regulatory legal acts and project documentation


# 34160601737964
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of the Facility with the requirements of technical regulations of other regulatory legal acts and project documentationthe task is to ensure that the Facility meets the requirements of technical regulations of other regulatory legal acts and project documentationthe subject is compliance with mandatory requirements regarding the compliance of construction works with their results and applied building materials with the requirements of technical regulations of other regulatory legal acts and project documentation


# 34160601737939
Unscheduled inspection
Start date: 2016-08-09, end date: 2016-08-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of the Facility with the requirements of technical regulations of other regulatory legal acts and project documentationthe task is to ensure that the Facility meets the requirements of technical regulations of other regulatory legal acts and project documentationthe subject is compliance with mandatory requirements regarding the compliance of construction works with their results and applied building materials with the requirements of technical regulations of other regulatory legal acts and project documentation


# 34160601774832
Unscheduled inspection
Start date: 2016-08-08, end date: 2016-08-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work


# 34160601767642
Unscheduled inspection
Start date: 2016-08-08, end date: 2016-08-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of activities carried out at the Facility with the requirements of the urban planning legislation of the Russian Federation as well as energy efficiency requirements and equipment requirements of the capital construction facility with metering devices for energy resources used, including technical regulations and project documentation tasks prevention detection and suppression of violations of the legislation of the Russian Federation, including technical regulations and project documentation Subject compliance with mandatory requirements in relation to compliance construction works, their results and the construction materials used, the requirements of technical regulations, design documentation, the availability of a construction permit, and the fulfillment of established requirements for admission to construction work


# 34160700054490
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-09-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: The purpose is to assess the compliance of the Facility with the requirements of technical regulations of other regulatory legal acts and project documentationthe task is to ensure that the Facility meets the requirements of technical regulations of other regulatory legal acts and project documentationthe subject is compliance with mandatory requirements regarding the compliance of construction works with their results and applied building materials with the requirements of technical regulations of other regulatory legal acts and project documentation


# 34160601702299
Unscheduled inspection
Start date: 2016-07-07, end date: 2016-07-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: assessment of compliance of activities carried out at the facility with the requirements of urban planning legislation


# 34160601702247
Unscheduled inspection
Start date: 2016-07-07, end date: 2016-07-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: assessment of compliance of activities carried out at the facility with the requirements of urban planning legislation


# 34160601702197
Unscheduled inspection
Start date: 2016-07-07, end date: 2016-07-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: assessment of compliance of activities carried out at the facility with the requirements of urban planning legislation


# 34160601689331
Unscheduled inspection
Start date: 2016-06-30, end date: 2016-07-27, duration:
Authority: Gosudarstvennaya inspekciya truda v Volgogradskoi oblasti
Purpose of inspection: implementation of federal state supervision over the employer's compliance with labor legislation and other regulatory legal acts containing labor law norms consideration of appeals No. 7215816OB dated 21062016


# 34160601687068
Unscheduled inspection
Start date: 2016-06-30, end date: 2016-07-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Volgogradskoi oblasti
Purpose of inspection: assessment of compliance of activities carried out at the facility with the requirements of urban planning legislation


# 34160601685228
Unscheduled inspection
Start date: 2016-06-30, end date: —, duration:
Authority:
Purpose of inspection:


# 00160601600290
Unscheduled inspection
Start date: 2016-04-25, end date: 2016-05-06, duration:
Authority: NizhneVolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: verification of the information set out in the appeal dated 18042016 vx O368VO Commodity TI


# 34160601535444
Unscheduled inspection
Start date: 2016-03-10, end date: 2016-04-06, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Volgogradskoi oblasti
Purpose of inspection: consideration of the circumstances set out in the applicant's appeal vx 1257 dated 01032016 on the issue of violation of the consumer rights of Gazprom Gazoraspredelenie Volgograd JSC under the legislation on consumer protection at the conclusion and execution of a contract for the provision of paid services


# 34160601515622
Unscheduled inspection
Start date: 2016-02-29, end date: 2016-03-29, duration:
Authority: Gosudarstvennaya inspekciya truda v Volgogradskoi oblasti
Purpose of inspection: verification of the employer's compliance with the requirements of labor legislation and other regulatory legal acts containing labor law norms in the course of its activities, the implementation of federal state supervision over the employer's compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the receipt by the State Labor Inspectorate in the Volgograd region of an employee's appeal about the violation by the employer of his labor rights vx 750416OB of 15022016


# 00160601460846
Unscheduled inspection
Start date: 2016-01-14, end date: —, duration:
Authority: Upravlenie gosavtodornadzora po Volgogradskoi oblasti
Purpose of inspection: compliance with regulation 28 of 03122015


# 34150601356508
Unscheduled inspection
Start date: 2015-11-19, end date: —, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Volgogradskoi oblasti
Purpose of inspection:


# 34150601255158
Unscheduled inspection
Start date: 2015-10-06, end date: 2015-11-02, duration:
Authority: Upravlenie Federalnoi sluzhby po nadzoru v sfere zaschity prav potrebitelei i blagopoluchiya cheloveka po Volgogradskoi oblasti
Purpose of inspection: consideration of the circumstances set out in the applicant's appeal vx 6067 dated 01102015 on the issue of violation of the consumer rights of Gazprom Gazoraspredelenie Volgograd JSC under the legislation on consumer protection at the conclusion and execution of a contract for the provision of paid services


# 34150600115104
Unscheduled inspection
Start date: 2015-09-03, end date: 2015-09-29, duration:
Authority: Glavnoe upravlenie MCHS Rossii po Volgogradskoi oblasti
Purpose of inspection: control over the execution of a previously issued prescription


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.