# 242004282627
Unscheduled inspection
Start date: 2020-02-12, end date: 2020-03-12, duration: 20
Authority: Ministerstvo ekologii i racionalnogo prirodopolzovaniya Krasnoyarskogo kraya
Purpose of inspection: establishing a negative impact on the environment by suppressing violations of the requirements of environmental legislation in the field of waste management and in the field of atmospheric air protection in the activities of LLC "Businessles" specified in reasoned submission 24 dated 06022020
# 241903949372
Unscheduled inspection
Start date: 2019-11-07, end date: —, duration: —
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Krasnoyarskomu krayu
Purpose of inspection:
# 241903291236
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-10-11, duration: —
Authority: Upravlenie Federalnoi sluzhby po veterinarnomu i fitosanitarnomu nadzoru po Krasnoyarskomu krayu
Purpose of inspection: the inspection is carried out in order to assess the compliance of the activities of an economic entity engaged in harvesting storing and selling wood with the requirements of legislation in the field of plant quarantine on the basis of the order of the Federal Service for Veterinary and Phytosanitary Supervision dated 16042019 386 DSP pursuant to the instructions of the Deputy Chairman of the Government of the Russian Federation A. V. Gordeev dated 03042019 AG P11 2558 The objectives of this inspection are to conduct control and surveillance measures aimed at prevention detection and suppression of violations of the mandatory requirements of the legislation of the Russian Federation in the field of federal state quarantine phytosanitary surveillance The subject of this audit is the compliance of LLC "Businessles" in the process of harvesting, storing and selling wood with the mandatory requirements of the legislation of the Russian Federation in the field of federal state quarantine phytosanitary surveillance, measures to identify, localize and eliminate quarantine facilities and prevent harm to plants and the environment
# 24190803463498
Unscheduled inspection
Start date: 2019-07-16, end date: 2019-08-12, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: The purpose of the inspection is to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 109 dated 09072019 on the completion of the construction of the capital construction facility. The objectives of the inspection are to prevent identify and suppress violations of legislation on urban development, including technical regulations and design documentation. The subject of the inspection is to verify the compliance of the work performed and the building materials used during the construction of the facility capital construction as well as the results of such work, the requirements of technical regulations and design documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, are subject to verification by all acts, regulations, notices on the elimination of violations and deficiencies identified during the implementation of regional state construction supervision, compliance with the requirements established by parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation Federation verification of a building permit
# 241902439280
Unscheduled inspection
Start date: 2019-01-21, end date: 2019-02-15, duration: —
Authority: Sluzhba stroitelnogo nadzora i zhilischnogo kontrolya Krasnoyarskogo kraya
Purpose of inspection: This audit is conducted in order to carry out regional state construction supervision during the construction of the specified capital construction facility on the basis of the received notification 1 dated 11.012019 on the start of construction of the capital construction facility. The objectives of this audit are to prevent identify and suppress violations of legislation on urban development activities, including technical regulations and project documentation. 7 The subject of this audit is 71 Verification of compliance with works and construction materials used during the construction of a capital construction facility, as well as the results of such work, to the requirements of design documentation, including energy efficiency requirements, with the exception of capital construction facilities to which energy efficiency requirements do not apply, and to the requirements for equipping a capital construction facility with metering devices for used energy resources 72 Meeting the requirements established by Parts 2 3 and 31 of Article 52 of the Urban Planning Code Code of the Russian Federation 73 Checking the availability of a building permit
# 241800682019
Unscheduled inspection
Start date: 2018-08-27, end date: 2018-09-21, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Krasnoyarskomu krayu
Purpose of inspection: control over the execution of the previously issued OND and PR in Gkansk and Kansky district of the Department and PR of the Main Directorate of the Ministry of Emergency Situations of Russia in the Krasnoyarsk Territory of the prescription dated 18122017 280112, the deadline for the elimination of which is set at 18072018
# 24170803009054
Unscheduled inspection
Start date: 2017-12-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 24170802679954
Unscheduled inspection
Start date: 2017-10-03, end date: 2017-10-04, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Krasnoyarskomu krayu
Purpose of inspection: control over the execution of previously issued regulations issued by the Ministry of Emergency Situations of Russia in the Krasnoyarsk Territory dated 22062017 791113 7911 7913 7914 7915 79110 79111 79112 79113
# 24170701730621
Unscheduled inspection
Start date: 2017-06-20, end date: —, duration: —
Authority: —
Purpose of inspection: