# 002004364138
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-30, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory safety requirements established by federal laws and other regulatory acts of the Russian Federation in the field of electric power industry
# 162005241774
Unscheduled inspection
Start date: 2020-11-24, end date: 2020-11-30, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to establish compliance with the requirements of Part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine whether the construction materials used in the construction of a capital construction facility and the results of such work comply with the requirements of the design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, and the implementation of the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate dated 13112020 12613 on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance with the requirements of the work performed during the construction of the capital construction facility technical regulations, other regulatory legal acts and project documentation The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 162005215049
Unscheduled inspection
Start date: 2020-11-05, end date: 2020-11-05, duration: 1
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 30102020 12094 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 26102020 1612024701 to 30112020grevention as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer, of compliance of the works performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentationthe subject of this audit is to comply with the instructions of state control bodies, supervision bodies of municipal control
# 162005199344
Unscheduled inspection
Start date: 2020-10-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162004513373
Unscheduled inspection
Start date: 2020-08-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162004513355
Unscheduled inspection
Start date: 2020-08-28, end date: 2020-09-10, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, project documentation, other regulations, norms and rules, as well as to draw up an act on the elimination of violations based on the notice received by the Inspectorate from 21082020 8939 on the elimination of violations during the construction of the reconstruction of the capital construction facility, which was ordered to be eliminated within the time limit set by the regulation from 14082020 1712027001 to 14092020 The objectives of this audit are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation committed by the developer, the customer, or the person carrying out construction on the basis of a contract with the developer or the customer. The subject of this audit is to comply with the instructions of state control bodies, supervision bodies, and municipal control bodies
# 162004513349
Unscheduled inspection
Start date: 2020-08-28, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162004486341
Unscheduled inspection
Start date: 2020-08-14, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 002004364138
Unscheduled inspection
Start date: 2020-03-10, end date: 2020-03-30, duration: —
Authority: Privolzhskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: prevention detection and suppression of violations of mandatory safety requirements established by federal laws and other regulatory acts of the Russian Federation in the field of electric power industry