Found 35 inspections:

# 002005289724
Unscheduled inspection
Start date: 2020-12-16, end date: 2020-12-18, duration: 3
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of a previously issued prescription


# 001902779135
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-06-04, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: checking the prescription


# 001902559184
Unscheduled inspection
Start date: 2019-03-05, end date: 2019-03-19, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka ispolneniya ranee vydannogo predpisaniya ot 24122018 23109176794163PR578


# 001902539000
Unscheduled inspection
Start date: 2019-02-19, end date: —, duration:
Authority:
Purpose of inspection:


# 001800606198
Unscheduled inspection
Start date: 2018-08-31, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 001800606222
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-27, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and design The subject of this audit is compliance with the mandatory requirements of legislation on urban planning activities compliance of work and construction materials used in the process of construction reconstruction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used availability of a construction permit construction of the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 001800092598
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-19, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance with the instructions of the state control and supervision bodies


# 00170802928326
Unscheduled inspection
Start date: 2017-12-11, end date: —, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection:


# 00170802634202
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-31, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and project documentation The verification is compliance with the mandatory requirements of legislation on urban planning activities compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used availability of a construction permit fulfillment by persons carrying out construction of the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation compliance with the instructions of the state control and supervision bodies


# 00170701854602
Unscheduled inspection
Start date: 2017-08-31, end date: 2017-09-27, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and project documentation The verification is compliance with the mandatory requirements of legislation on urban planning activities compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used availability of a construction permit fulfillment by persons carrying out construction of the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation compliance with the instructions of the state control and supervision bodies


# 00170701611234
Unscheduled inspection
Start date: 2017-05-25, end date: 2017-06-22, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and project documentation The verification is compliance with the mandatory requirements of legislation on urban planning activities compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used availability of a construction permit fulfillment by persons carrying out construction of the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation compliance with the instructions of the state control and supervision bodies


# 00170701412771
Unscheduled inspection
Start date: 2017-02-28, end date: 2017-03-28, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and project documentation The verification is compliance with the mandatory requirements of legislation on urban planning activities compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used availability of a construction permit fulfillment by persons carrying out construction of the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation


# 00160700483634
Unscheduled inspection
Start date: 2016-09-14, end date: 2016-10-11, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the activities of legal licindividual entrepreneurs in compliance with the requirements of the legislation on urban development, mandatory norms and rules during the construction of a capital construction facility


# 782100329924
Unscheduled inspection
Start date: 2021-07-01, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: g) proverki zaversheniya rabot po osuschestvleniyu stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, ukazannogo v izveschenii zastroischika (tehnicheskogo zakazchika) ob okonchanii stroitelstva vh. № 03-5720/2020-4 ot 07.06.2021 (srok okonchaniya rabot po izvescheniyu 30.06.2021); a) soblyudenie obyazatelnyh trebovanii, v tom chisle: sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva, rekonstrukcii obekta kapitalnogo stroitelstva, a takzhe rezultatov takih rabot trebovaniyam utverzhdennoi v sootvetstvii s chastyami 15, 15.2 i 15.3 stati 48 nastoyaschego Kodeksa proektnoi dokumentacii (s uchetom izmenenii, vnesennyh v proektnuyu dokumentaciyu v sootvetstvii s chastyami 3.8 i 3.9 stati 49 nastoyaschego Kodeksa) i (ili) informacionnoi modeli (v sluchae, esli formirovanie i vedenie informacionnoi modeli yavlyayutsya obyazatelnymi v sootvetstvii s trebovaniyami nastoyaschego Kodeksa), v tom chisle trebovaniyam energeticheskoi effektivnosti (za isklyucheniem obektov kapitalnogo stroitelstva, na kotorye trebovaniya energeticheskoi effektivnosti ne rasprostranyayutsya) i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov; nalichie razresheniya na stroitelstvo; vypolneniya trebovanii, ustanovlennyh chastyami 2, 3 i 3.1 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii; v) provedenie meropriyatii: po predotvrascheniyu prichineniya vreda zhizni, zdorovyu grazhdan, vreda zhivotnym, rasteniyam, okruzhayuschei srede; po preduprezhdeniyu vozniknoveniya chrezvychainyh situacii prirodnogo i tehnogennogo haraktera; po likvidacii posledstvii prichineniya takogo vreda.


# 002005289724
Unscheduled inspection
Start date: 2020-12-16, end date: 2020-12-18, duration: 3
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control over the execution of a previously issued prescription


# 002005262519
Unscheduled inspection
Start date: 2020-11-12, end date: 2020-12-02, duration: 15
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring compliance with the requirements of legislation on urban development


# 472005202710
Unscheduled inspection
Start date: 2020-10-02, end date: —, duration:
Authority:
Purpose of inspection:


# 001902779135
Unscheduled inspection
Start date: 2019-05-23, end date: 2019-06-04, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: checking the prescription


# 471902698331
Unscheduled inspection
Start date: 2019-05-06, end date: 2019-06-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of works at the beginning of construction The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of legislation on urban planning activities committed by the developer, the technical customer, the person carrying out the construction, including technical regulations and project documentation


# 001902559184
Unscheduled inspection
Start date: 2019-03-05, end date: 2019-03-19, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: proverka ispolneniya ranee vydannogo predpisaniya ot 24122018 23109176794163PR578


# 001902539000
Unscheduled inspection
Start date: 2019-02-19, end date: 2019-02-21, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of the execution of a previously issued prescription


# 001802422344
Unscheduled inspection
Start date: 2018-12-27, end date: 2019-01-31, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: kontrol deyatelnosti po soblyudeniyu trebovanii gradostroitelnogo zakonodatelstva trebovanii proekta v sootvetstvii s izvescheniem ob okonchanii stroitelstva ot 11122018 bn


# 001800606198
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-27, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and design The subject of this audit is compliance with the mandatory requirements of legislation on urban planning activities compliance of work and construction materials used in the process of construction reconstruction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used availability of a construction permit construction of the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 001800606222
Unscheduled inspection
Start date: 2018-08-31, end date: 2018-09-27, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and design The subject of this audit is compliance with the mandatory requirements of legislation on urban planning activities compliance of work and construction materials used in the process of construction reconstruction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used availability of a construction permit construction of the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation


# 001800092598
Unscheduled inspection
Start date: 2018-02-26, end date: 2018-03-19, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: compliance with the instructions of the state control and supervision bodies


# 471800001114
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-02-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Purpose verification of the works specified in the notice of the person carrying out the construction on the completion dates of the works that are subject to verification The subject of this audit is compliance with mandatory requirements, including compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and equipment requirements of the facility capital construction metering devices for energy resources used to comply with the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation the objectives of this audit are to prevent identify and suppress violations of legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, the person carrying out the construction


# 00170802928326
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-22, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and project documentation The verification is compliance with the mandatory requirements of legislation on urban planning activities compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used availability of a construction permit fulfillment by persons carrying out construction of the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation compliance with the instructions of the state control and supervision bodies


# 00170802634202
Unscheduled inspection
Start date: 2017-10-04, end date: 2017-10-31, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and project documentation The verification is compliance with the mandatory requirements of legislation on urban planning activities compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used availability of a construction permit fulfillment by persons carrying out construction of the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation compliance with the instructions of the state control and supervision bodies


# 00170701854602
Unscheduled inspection
Start date: 2017-08-31, end date: 2017-09-27, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and project documentation The verification is compliance with the mandatory requirements of legislation on urban planning activities compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used availability of a construction permit fulfillment by persons carrying out construction of the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation compliance with the instructions of the state control and supervision bodies


# 00170701611234
Unscheduled inspection
Start date: 2017-05-25, end date: 2017-06-22, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and project documentation The verification is compliance with the mandatory requirements of legislation on urban planning activities compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used availability of a construction permit fulfillment by persons carrying out construction of the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation compliance with the instructions of the state control and supervision bodies


# 00170701412771
Unscheduled inspection
Start date: 2017-02-28, end date: 2017-03-28, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of monitoring the activities of legal entities and individual entrepreneurs in compliance with the requirements of legislation on urban development mandatory norms and rules during the construction of a capital construction facility The objectives of this audit are to monitor compliance by legal entities and individual entrepreneurs with the requirements of legislation on urban development mandatory norms and rules prevention detection and suppression of violations of legislation on urban development, including technical regulations and project documentation The verification is compliance with the mandatory requirements of legislation on urban planning activities compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used availability of a construction permit fulfillment by persons carrying out construction of the requirements of parts 2 and 3 Articles 52 of the Urban Planning Code of the Russian Federation


# 47160701236247
Unscheduled inspection
Start date: 2016-12-14, end date: 2017-01-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Cel proverka rabot ukazannyh v izveschenii lica osuschestvlyayuschego stroitelstvo o srokah zaversheniya rabot kotorye podlezhat proverkePredmetom nastoyaschei proverki yavlyaetsyasoblyudenie obyazatelnyh trebovanii v tom chislesootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstvapriborami ucheta ispolzuemyh energeticheskih resursovvypolnenie trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii


# 47160701236246
Unscheduled inspection
Start date: 2016-12-14, end date: 2017-01-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Cel proverka rabot ukazannyh v izveschenii lica osuschestvlyayuschego stroitelstvo o srokah zaversheniya rabot kotorye podlezhat proverkePredmetom nastoyaschei proverki yavlyaetsyasoblyudenie obyazatelnyh trebovanii v tom chislesootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstvapriborami ucheta ispolzuemyh energeticheskih resursovvypolnenie trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii


# 47160701213040
Unscheduled inspection
Start date: 2016-12-07, end date: 2017-01-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora i gosudarstvennoi ekspertizy Leningradskoi oblasti
Purpose of inspection: Cel proverka zaversheniya rabot po osuschestvleniyu stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva ukazannogo v izveschenii zastroischika ob okonchanii stroitelstvaPredmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii v tom chislesootvetstvie vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursovvypolnenie trebovanii chastei 2 i 3 stati 52 Gradostroitelnogo kodeksa Rossiiskoi Federacii


# 00160700483634
Unscheduled inspection
Start date: 2016-09-14, end date: 2016-10-11, duration:
Authority: SeveroZapadnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: control of the activities of legal licindividual entrepreneurs in compliance with the requirements of the legislation on urban development, mandatory norms and rules during the construction of a capital construction facility


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.