Found 86 inspections:

# 162101474923
Unscheduled inspection
Start date: 2021-12-17, end date: —, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 09.11.2021 case No. 16-04-2020/0022. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this review is (select the appropriate one): compliance with mandatory requirements and (or) requirements established by municipal legal acts.


# 162101274587
Unscheduled inspection
Start date: 2021-10-28, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162101147814
Unscheduled inspection
Start date: 2021-10-06, end date: —, duration:
Authority:
Purpose of inspection:


# 162100564736
Unscheduled inspection
Start date: 2021-09-03, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162100406220
Unscheduled inspection
Start date: 2021-08-04, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 06/17/2021 case No. 16-04-2021/0016. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements and (or) requirements established by municipal legal acts.


# 162100323903
Unscheduled inspection
Start date: 2021-07-05, end date: —, duration:
Authority:
Purpose of inspection:


# 162100285579
Unscheduled inspection
Start date: 2021-06-17, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 04.09.2020 case No. 16-04-2020/0022. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is (select the appropriate one): compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162100300074
Unscheduled inspection
Start date: 2021-06-24, end date: —, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to establish compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation, as well as to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipment of capital construction facilities with metering devices for energy resources used, availability of a construction permit, compliance with the requirements of Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation, on the basis of the notification received by the Inspection on the start of construction of the capital construction facility dated 06/15/2021 No. 6054. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162100052213
Unscheduled inspection
Start date: 2021-03-12, end date: 2021-03-24, duration: 9
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 04.09.2020 case No. 16-04-2020/0022. The objectives of this audit are: prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is (select the appropriate one): ☑ compliance with mandatory requirements and (or) requirements established by municipal legal acts;


# 162005271899
Unscheduled inspection
Start date: 2020-12-14, end date: —, duration:
Authority:
Purpose of inspection:


# 162005271324
Unscheduled inspection
Start date: 2020-12-23, end date: 2020-12-24, duration: 2
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 04092020 case 160420200022 The tasks of this inspection are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 162005250317
Unscheduled inspection
Start date: 2020-12-01, end date: —, duration:
Authority:
Purpose of inspection:


# 162005226102
Unscheduled inspection
Start date: 2020-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 162005151385
Unscheduled inspection
Start date: 2020-10-06, end date: 2020-10-08, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 28072020 case 160420190013 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162005196510
Unscheduled inspection
Start date: 2020-10-30, end date: 2020-11-03, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine whether the completed works used in the construction of an object of capital construction of building materials, the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 04092020 case 160420200022 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004498301
Unscheduled inspection
Start date: 2020-08-28, end date: —, duration:
Authority:
Purpose of inspection:


# 162004444276
Unscheduled inspection
Start date: 2020-07-07, end date: —, duration:
Authority:
Purpose of inspection:


# 162004404335
Unscheduled inspection
Start date: 2020-05-07, end date: 2020-05-08, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of verification of the completed construction facility in accordance with the received by notification dated 28042020 4219 to the Inspection on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 162004404086
Unscheduled inspection
Start date: 2020-05-06, end date: 2020-05-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program of 270-42020 case 160420190022 The objectives of this inspection are to prevent, identify and suppress violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer with the requirements of mandatory requirements and or requirements established by the municipal legal acts


# 162004386372
Unscheduled inspection
Start date: 2020-04-08, end date: —, duration:
Authority:
Purpose of inspection:


# 162004399525
Unscheduled inspection
Start date: 2020-04-27, end date: —, duration:
Authority:
Purpose of inspection:


# 162004396671
Unscheduled inspection
Start date: 2020-04-20, end date: 2020-04-22, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 24032020 case 160420190022 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004382412
Unscheduled inspection
Start date: 2020-03-27, end date: 2020-03-31, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of verification of the completed construction facility in accordance with the received by notification to the Inspection dated 23032020 2892 on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility mandatory requirements and or requirements established by municipal legal acts


# 162004333414
Unscheduled inspection
Start date: 2020-03-12, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004249242
Unscheduled inspection
Start date: 2020-02-04, end date: 2020-02-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations design documentation other regulations norms and rules, as well as to draw up an act on the elimination of violations on the basis of a notice received by the Inspection dated 27012020 793 on the elimination of violations during the construction reconstruction of a capital construction facility that was ordered to be eliminated within the time limit established by the regulation from 10122019 1612028401 to 31012020 The objectives of this audit are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation The subject of this audit is the fulfillment of the instructions of state control bodies supervision of municipal control bodies


# 162004260428
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 162004285855
Unscheduled inspection
Start date: 2020-02-17, end date: 2020-02-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 03122019 case 160420190022 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004157876
Unscheduled inspection
Start date: 2020-01-13, end date: 2020-01-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program of 2112019 case 160420190013 The objectives of this inspection are to prevent as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 162004158767
Unscheduled inspection
Start date: 2020-01-15, end date: 2020-01-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program of 15112019 case 161120180009 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 161904129195
Unscheduled inspection
Start date: 2019-12-25, end date: 2019-12-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 03122019 case 160420190022 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 161904066988
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-10, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to establish compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation as well as to determine whether the completed works used in the construction of a capital construction facility, building materials, the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipment of capital construction facilities with metering devices for energy resources used, availability of a construction permit, performance the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notification received by the Inspectorate on the start of construction of a capital construction facility dated 29112019 12208 The tasks of this audit are to prevent, as well as identify and suppress violations committed by the developer customer by a person carrying out construction on the basis of an agreement with the developer or customer of compliance with the work performed during the construction of a capital construction facility with the requirements The purpose of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 161903892524
Unscheduled inspection
Start date: 2019-11-01, end date: —, duration:
Authority:
Purpose of inspection:


# 161903991984
Unscheduled inspection
Start date: 2019-11-26, end date: 2019-11-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program of 15112019 case 161120180009 The tasks of this inspection are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts. acts


# 161903931440
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 24092019 case 161120180009 The tasks of this inspection are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161903882247
Unscheduled inspection
Start date: 2019-10-28, end date: —, duration:
Authority:
Purpose of inspection:


# 161903353985
Unscheduled inspection
Start date: 2019-09-10, end date: 2019-09-11, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to establish compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation as well as to determine the compliance of the completed works used in the construction of a capital construction facility with construction materials and the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for used energy resources, availability of a construction permit, the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notification received by the Inspection on the start of construction of an object of capital construction dated 29082019 8005the tasks of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of an object of capital construction with the requirements technical regulations, other regulatory legal acts and project documentation The subject of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 161903502272
Unscheduled inspection
Start date: 2019-09-18, end date: 2019-09-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the program of inspections from 03092019 case 160420190013 The tasks of this audit are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 161902907518
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the program of inspections dated 09112018 case 161120180009 The tasks of this inspection are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentationthe subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts acts


# 161902901790
Unscheduled inspection
Start date: 2019-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 161902963996
Unscheduled inspection
Start date: 2019-08-21, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902918839
Unscheduled inspection
Start date: 2019-08-07, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902773812
Unscheduled inspection
Start date: 2019-06-10, end date: 2019-06-12, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the program of inspections dated 14052019 case 161120170010 The objectives of this audit are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The purpose of this audit is to select the necessary compliance with mandatory requirements and or requirements established by the municipal legal acts


# 161902772896
Unscheduled inspection
Start date: 2019-06-11, end date: —, duration:
Authority:
Purpose of inspection:


# 161902753064
Unscheduled inspection
Start date: 2019-06-05, end date: 2019-06-07, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the program of inspections dated 14052019 case 161120170010 The objectives of this audit are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The purpose of this audit is to select the necessary compliance with mandatory requirements and or requirements established by the municipal legal acts


# 161902751802
Unscheduled inspection
Start date: 2019-06-05, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902736459
Unscheduled inspection
Start date: 2019-05-29, end date: 2019-05-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: Carrying out supervisory measures to comply with the instructions of state supervision bodies


# 161902662088
Unscheduled inspection
Start date: 2019-04-23, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161902618947
Unscheduled inspection
Start date: 2019-04-24, end date: —, duration:
Authority:
Purpose of inspection:


# 161902655916
Unscheduled inspection
Start date: 2019-04-25, end date: —, duration:
Authority:
Purpose of inspection:


# 161902594389
Unscheduled inspection
Start date: 2019-04-08, end date: 2019-04-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations design documentation other regulations norms and rules, as well as to draw up an act on the elimination of violations on the basis of the notification received by the Inspection from 18032019 2269 on the elimination of violations during the construction reconstruction of a capital construction facility that was ordered to be eliminated within the time limit established by the regulation from 05122018 1619031602 to 25032019 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, compliance with the instructions of state control bodies, supervision of municipal control bodies


# 161802311966
Unscheduled inspection
Start date: 2018-12-26, end date: 2018-12-28, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program dated 29102018 case 161120170010 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts


# 161802144858
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-05, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program prevents, as well as identifies and suppresses violations of compliance of works performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, compliance with mandatory requirements and or requirements established by municipal legal acts, committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer


# 161801761013
Unscheduled inspection
Start date: 2018-10-04, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 161801240643
Unscheduled inspection
Start date: 2018-09-14, end date: 2018-09-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of verification of the completed construction facility in accordance with with the notification received by the Inspection dated 31082018 6262 on the completion of the construction of the capital construction facility, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800612468
Unscheduled inspection
Start date: 2018-08-14, end date: —, duration:
Authority:
Purpose of inspection:


# 161800620821
Unscheduled inspection
Start date: 2018-08-15, end date: 2018-08-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the fact of execution of the order dated 13072018 1619016301, the deadline for which expired 06082018 and drawing up an act based on the results of the inspection, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations and other The subject of this audit is to select the necessary compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800619260
Unscheduled inspection
Start date: 2018-08-10, end date: —, duration:
Authority:
Purpose of inspection:


# 161800675486
Unscheduled inspection
Start date: 2018-08-28, end date: 2018-08-29, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: To issue the results of the audit In the manner and in the cases provided for by the legislation of the Russian Federation on administrative offenses to carry out actions aimed at bringing to administrative responsibility persons who have committed administrative offenses


# 161800637873
Unscheduled inspection
Start date: 2018-08-22, end date: —, duration:
Authority:
Purpose of inspection:


# 161800582760
Unscheduled inspection
Start date: 2018-08-02, end date: 2018-08-02, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this audit is carried out in order to determine the fact of execution of the order dated 23052018 1619011501, the deadline for which expired 23072018 and drawing up an act based on the results of the audit, the objectives of this audit are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations and other regulatory legal acts and project documentation The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800550748
Unscheduled inspection
Start date: 2018-07-18, end date: —, duration:
Authority:
Purpose of inspection:


# 161800575548
Unscheduled inspection
Start date: 2018-07-26, end date: 2018-07-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to establish compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation as well as to determine the compliance of the completed works used in the construction of an object of capital construction of building materials and the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipment of capital construction facilities with metering devices for energy resources used construction of compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notice received by the Inspectorate on the start of construction of a capital construction facility dated 17072018 4970 The objectives of this audit are to prevent, identify and suppress violations of conformity committed by the developer customer by a person carrying out construction on the basis of an agreement with the developer or customer performed during the construction of a capital construction facility according to the requirements of technical regulations, other regulatory legal acts and project documentation, the subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800572517
Unscheduled inspection
Start date: 2018-07-26, end date: 2018-07-30, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 14062018 case 161120160024, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, the subject of this inspection is to select the necessary compliance with mandatory requirements and or the requirements established by municipal legal acts


# 161800560923
Unscheduled inspection
Start date: 2018-07-26, end date: 2018-07-26, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations design documentation other normative acts norms and rules for determining the fact of execution of the order as well as for the purpose of drawing up an act on the elimination of violations of the execution of the order on the basis of the notification received by the Inspection from 13072018 4858 on the elimination of violations during the construction reconstruction of a capital construction facility that were ordered to be eliminated within the time limit established the order from 16052018 1619010501 to 16072018 and the expiration date of the order from 16052018 1619010501, the deadline for which expired 16072018, the objectives of this audit are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations other regulatory legal acts and The subject of this audit is the fulfillment of the requirements of the state control bodies supervision of municipal control bodies


# 161800517766
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 14062018 case 161120160024, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800451594
Unscheduled inspection
Start date: 2018-06-19, end date: 2018-06-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 29052018 case 161120160024, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800436382
Unscheduled inspection
Start date: 2018-06-13, end date: 2018-06-19, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 29052018 case 161120160024, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800398504
Unscheduled inspection
Start date: 2018-06-01, end date: 2018-06-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with with the inspection program from 12022018 case 161120160024 prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800330421
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-16, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with with the inspection program from 12022018 case 161120160024 prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800371753
Unscheduled inspection
Start date: 2018-05-21, end date: 2018-05-23, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program from 07052018 case 161120170010, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 161800261524
Unscheduled inspection
Start date: 2018-04-18, end date: 2018-04-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations design documentation other regulations norms and rules, as well as to draw up an act on the elimination of violations on the basis of a notice received by the Inspection dated 29032018 2054 on the elimination of violations during the construction reconstruction of a capital construction facility that was ordered to be eliminated within the time limit established by the regulation from 13122017 1619056101 to 01042018 prevention, as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, compliance with the instructions of state control bodies, supervision of municipal control bodies


# 161800029185
Unscheduled inspection
Start date: 2018-02-05, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16180803050762
Unscheduled inspection
Start date: 2018-01-16, end date: 2018-01-17, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with with the inspection program, the objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of a capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170802926776
Unscheduled inspection
Start date: 2017-12-11, end date: 2017-12-13, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with with the program of inspections dated 17112017 case 161120160024 prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170802874383
Unscheduled inspection
Start date: 2017-11-21, end date: —, duration:
Authority:
Purpose of inspection:


# 16170802919797
Unscheduled inspection
Start date: 2017-11-30, end date: 2017-12-04, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with with the verification program, the tasks of this audit are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170802594325
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-09-27, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to establish compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation as well as to determine the compliance of the completed works used in the construction of an object of capital construction of building materials and the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipment of capital construction facilities with metering devices for energy resources used construction of compliance with the requirements of Parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of a notice received by the Inspection on the start of construction reconstruction of a capital construction facility, the objectives of this inspection are to prevent as well as identify and suppress violations of compliance of works performed during the construction of a capital construction facility with technical requirements committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer regulations of other regulatory legal acts and project documentation The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts


# 16170701480945
Unscheduled inspection
Start date: 2017-04-04, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16170701351104
Unscheduled inspection
Start date: 2017-02-13, end date: 2017-02-14, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of construction reconstruction of an object of capital construction of building materials, the results of such works with the requirements of technical regulations of project documentation, including the requirements of energy efficiency, prevention, as well as identification and suppression of violations of conformity committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer performed during the construction of an object of capital construction works according to the requirements of technical regulations, other regulatory legal acts and project documentationcompliance with mandatory requirements


# 16170701385316
Unscheduled inspection
Start date: 2017-02-20, end date: 2017-02-21, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of verification of the completed construction facility in in accordance with the notification received by the Inspection from 07022017 969 on the completion of construction reconstruction at the capital construction facility, the tasks of this inspection are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The verification is compliance with mandatory requirements


# 16170701322066
Unscheduled inspection
Start date: 2017-01-31, end date: —, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:


# 16160701086302
Unscheduled inspection
Start date: 2016-11-16, end date: —, duration:
Authority:
Purpose of inspection:


# 16160700327214
Unscheduled inspection
Start date: 2016-09-09, end date: 2016-09-09, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations design documentation other regulations norms and rules, as well as to draw up an act on the elimination of violations on the basis of the notification received by the Inspection dated 01092016 7577 on the elimination of violations during the construction reconstruction of a capital construction facility that was ordered to be eliminated within the time limit established by the regulation from 18082016 161904101 to 16092016 prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation, while eliminating previously identified violations, compliance with the instructions of state control bodies supervision of municipal control bodies


# 16160700040219
Unscheduled inspection
Start date: 2016-08-15, end date: 2016-08-15, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to establish compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notification received by the Inspection on the start of construction of the reconstruction of the capital construction facility from 05082016 6612, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility requirements of technical regulations, other regulatory legal acts and project documentationcompliance with mandatory requirements or requirements established by municipal legal acts


# 16160700041181
Unscheduled inspection
Start date: 2016-08-17, end date: 2016-08-18, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the work performed with the construction materials used in the process of construction reconstruction of the capital construction facility, the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used on the basis of notification received by the Inspection from 10082016 6738 on the completion dates of works that are subject to verification at the capital construction facility, the prevention as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and design documentationcompliance with mandatory requirements or requirements established by municipal legal acts


# 16160601736716
Unscheduled inspection
Start date: 2016-07-19, end date: 2016-07-20, duration:
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: in order to determine the compliance of the completed works applied in the process of construction reconstruction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the program inspections dated 14072016 case 161120150028 prevention as well as detection and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations other regulatory legal acts and project documentation compliance with mandatory requirements or requirements established by municipal legal acts


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.