# 001801923362
Unscheduled inspection
Start date: 2018-10-09, end date: 2018-10-17, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 61 This inspection is carried out in order to verify the items 7 8 11 13 16 17 19 22 25 27 28 31 33 the previously issued order dated 09102017 Cb4858, the deadline for which expired on 01102018 62 The objectives of this audit are to implement measures to control the elimination of violations of the PP 7 8 11 13 16 17 19 22 25 27 28 31 33 regulations from 09102017 Cb4858 7 The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 00170701751657
Unscheduled inspection
Start date: 2017-06-28, end date: 2017-06-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose verification of compliance with the points of a previously issued prescription Task implementation of measures to control the elimination of violations specified in the points of a previously issued prescription The purpose of this audit is to comply with the instructions of state control and supervision bodies
# 00150600633982
Unscheduled inspection
Start date: 2015-09-14, end date: 2015-09-17, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 662101370182
Unscheduled inspection
Start date: 2021-12-06, end date: 2021-12-10, duration: 5
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-17-29/472 dated 09/24/2021 issued by Uralmetallurgmontazh 2 JSC, the task of this inspection is: implementation of regional state construction supervision. The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 09/24/2021 No. 29-17-29/472, issued by JSC Uralmetallurgmontazh 2.
# 662101273232
Unscheduled inspection
Start date: 2021-11-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662101352902
Unscheduled inspection
Start date: 2021-11-18, end date: 2021-11-30, duration: 9
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to verify compliance with the requirements of Regulation No. 29-17-29/486 dated 30.09.2021, issued by Uralmetallurgmontazh 2 JSC, the task of this inspection is: implementation of regional state construction supervision. The subject of this audit is: the fulfillment of the previously issued instruction on the elimination of identified violations of mandatory requirements dated 30.09.2021 No. 29-17-29/486, issued by JSC Uralmetallurgmontazh 2.
# 742101260986
Unscheduled inspection
Start date: 2021-10-28, end date: 2021-11-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the Installation of the building frame (in the course of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation in accordance with in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects to which energy efficiency requirements do not apply) and equipment requirements the capital construction facility is equipped with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101215049
Unscheduled inspection
Start date: 2021-10-18, end date: 2021-10-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on compliance with fire-fighting and sanitary-epidemiological measures and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and equipment requirements of the facility capital construction with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100676204
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662100590430
Unscheduled inspection
Start date: 2021-09-06, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 742100447088
Unscheduled inspection
Start date: 2021-08-16, end date: 2021-08-20, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the electric lighting system, the 6/04 kV power supply system and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation in accordance with with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and equipment requirements the capital construction facility is equipped with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100331394
Unscheduled inspection
Start date: 2021-07-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100257601
Unscheduled inspection
Start date: 2021-06-08, end date: 2021-06-15, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of heating, ventilation, interior finishing works and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects to which energy efficiency requirements do not apply) and requirements the equipment of the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100300875
Unscheduled inspection
Start date: 2021-06-24, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100207394
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-05-21, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the execution of works on internal masonry works and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such works with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 662100072704
Unscheduled inspection
Start date: 2021-04-06, end date: 2021-04-09, duration: 4
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 742100158448
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-04-30, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed to verify the actual condition of the facility and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including the requirements of energy efficiency (with the exception of capital construction projects, to which the requirements of energy efficiency do not apply) and the requirements of equipment of the capital construction facility with devices accounting for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100151673
Unscheduled inspection
Start date: 2021-04-26, end date: 2021-04-30, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the Installation of foundations reinforcement (before sealing) and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and equipment requirements of the facility capital construction with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100092753
Unscheduled inspection
Start date: 2021-03-30, end date: 2021-04-02, duration: 4
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Verification of the execution of the order dated 02/18/2021, the deadline for execution is 03/19/2021. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742105332488
Unscheduled inspection
Start date: 2021-02-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662105320445
Unscheduled inspection
Start date: 2021-01-25, end date: 2021-02-19, duration: 20
Authority: Glavnoe upravlenie MCHS Rossii po Sverdlovskoi oblasti
Purpose of inspection: This check is carried out for the purpose of: checking the fulfillment of the points of the previously issued instruction of the state control (supervision) body dated 04/17/2019. No. 415/1/1, the deadline for which expired on 01.12.2020.
The objectives of this audit are: to carry out activities aimed at preventing, identifying and suppressing violations by the organization of the requirements established by the legislation of the Russian Federation on fire safety, by organizing and conducting, in accordance with the established procedure, an audit of the organization's activities, the condition of the objects of protection used (operated) by it.
The subject of this audit is the fulfillment of the instructions of the state control (supervision) bodies, municipal control bodies;
# 001903998796
Unscheduled inspection
Start date: 2019-11-11, end date: 2019-11-25, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by Uralmetallurgmontazh 2 JSC of the instruction on the elimination of identified violations from 09082019 Cb3356rP, the deadline for which expires on 30102019. The purpose of this audit is to carry out measures to control the elimination of violations specified in the instruction from 09082019 CB3356PP. The subject of this audit is the fulfillment of the instructions of the state control supervision bodies
# 661903366201
Unscheduled inspection
Start date: 2019-09-23, end date: 2019-09-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose control of the execution of the previously issued order on the elimination of the identified violation of mandatory requirements 291707484 P dated July 26, 2019 Task implementation of state construction supervision Subject to the implementation of the previously issued order on the elimination of the identified violation of mandatory requirements 291707484 P dated July 26, 2019
# 661902858838
Unscheduled inspection
Start date: 2019-08-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661903061191
Unscheduled inspection
Start date: 2019-08-29, end date: 2019-09-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is carried out in order to monitor the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements dated July 22, 2019 291307172 P The objectives of this audit are the implementation of regional state construction supervision The subject of this audit is the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements dated July 22, 2019 291307172 P
# 661902848516
Unscheduled inspection
Start date: 2019-07-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902558650
Unscheduled inspection
Start date: 2019-03-11, end date: 2019-03-15, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose control of the execution of the previously issued instruction on the elimination of the identified violation of mandatory requirements 29170725 P dated February 01, 2019 Task implementation of state construction supervision Subject to the implementation of the previously issued instruction on the elimination of the identified violation of mandatory requirements 29170725 P dated February 01, 2019
# 001801923362
Unscheduled inspection
Start date: 2018-10-09, end date: 2018-10-17, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 61 This inspection is carried out in order to verify the items 7 8 11 13 16 17 19 22 25 27 28 31 33 the previously issued order dated 09102017 Cb4858, the deadline for which expired on 01102018 62 The objectives of this audit are to implement measures to control the elimination of violations of the PP 7 8 11 13 16 17 19 22 25 27 28 31 33 regulations from 09102017 Cb4858 7 The subject of this audit is the fulfillment of the instructions of the state control and supervision bodies
# 001800336255
Unscheduled inspection
Start date: 2018-05-03, end date: 2018-05-07, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: execution of Rostechnadzor Order No. 15032017 85 "On inspections of organizations operating tower cranes" on the basis of instructions from Deputy Chairman of the Government of the Russian Federation AG Khloponin dated 08022017 AHP9682 "On the organization and conduct of unscheduled inspections of organizations operating tower cranes from 2017 to 2019"prevention, detection and suppression of violations of mandatory requirements established by Federal Laws and other regulatory acts In the field of industrial safety and technical regulation of mandatory requirements, taking measures to eliminate violations of mandatory requirements if they are identified and to bring to justice persons who have committed violations of the requirements of federal laws and other regulatory legal acts, compliance by a legal entity in the course of carrying out activities with mandatory industrial safety requirements in the design construction operation conservation and liquidation of hazardous production facilities manufacturing installation commissioning maintenance and repair of technical devices of tower cranes used at hazardous production facilities compliance with the specified requirements of buildings premises structures equipment and materials used as well as requirements for machinery and equipment and related requirements for these products operation and disposal processes
# 001800260120
Unscheduled inspection
Start date: 2018-04-05, end date: 2018-04-13, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: 61 This inspection is carried out in order to verify the items 1 6 9 10 12 14 15 18 20 21 23 24 26 29 30 34 35 the previously issued order dated 09102017 Cb4858, the deadline for which expired on 01042018 62 The objectives of this audit are to implement measures to control the elimination of violations of the PP 1 6 9 10 12 14 15 18 20 21 23 24 26 29 30 34 35 regulations of 09102017 Cb4858 7 The subject of this audit is the fulfillment of the regulations of the state control and supervision bodies
# 66170802782727
Unscheduled inspection
Start date: 2017-10-30, end date: 2017-11-03, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to control the execution of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291705C2618 P dated September 15, 2017. The subject of this inspection is the fulfillment of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291705C2618 P dated September 15, 2017. The task of this inspection is the implementation of state construction supervision
# 66170802148042
Unscheduled inspection
Start date: 2017-09-11, end date: 2017-09-15, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to control the execution of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291705X2401 P dated June 16, 2017. The subject of this inspection is the fulfillment of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291705X2401 P dated June 16, 2017. The task of this inspection is the implementation of state construction supervision
# 00170701751657
Unscheduled inspection
Start date: 2017-06-28, end date: 2017-06-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Purpose verification of compliance with the points of a previously issued prescription Task implementation of measures to control the elimination of violations specified in the points of a previously issued prescription The purpose of this audit is to comply with the instructions of state control and supervision bodies
# 66170701601169
Unscheduled inspection
Start date: 2017-05-15, end date: 2017-05-19, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to control the execution of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291705X2181 P3 dated March 24, 2017. The subject of this inspection is the fulfillment of the previously issued instruction on the elimination of the identified violation of mandatory requirements 291705X2181 P3 dated March 24, 2017. The task of this inspection is the implementation of state construction supervision
# 66160701189709
Unscheduled inspection
Start date: 2016-11-21, end date: 2016-12-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The subject of this audit is to verify the compliance of the work and applicable building materials during the reconstruction of the capital construction facility "Reconstruction of the copper electrolysis workshop of JSC Uralelectromed" located at the address Sverdlovsk region, Verkhnyaya Pyshma, Lenin Street, house 1, the results of such work with building norms and rules, sanitary and epidemiological rules and regulations, safety rules and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the reconstruction of capital construction facilities
# 66160601747968
Unscheduled inspection
Start date: 2016-08-11, end date: 2016-08-25, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 30120442714 dated 16102014, the tasks of which are to carry out state construction supervision
# 00150600633982
Unscheduled inspection
Start date: 2015-09-14, end date: 2015-09-17, duration: —
Authority: ZapadnoUralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Verification of compliance with the requirements of Federal legislation in the field of urban development
# 66150600148190
Unscheduled inspection
Start date: 2015-08-17, end date: —, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Sverdlovskoi oblasti
Purpose of inspection: