# 762101438063
Unscheduled inspection
Start date: 2021-12-10, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of this audit is to:
based on the audit program.
The objectives of this audit are:
to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation.
7. The subject of this audit is:
compliance with mandatory requirements.
# 762101459990
Unscheduled inspection
Start date: 2021-12-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762101437947
Unscheduled inspection
Start date: 2021-09-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762100984487
Unscheduled inspection
Start date: 2021-09-28, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose of this audit is to:
based on the audit program.
The objectives of this audit are:
to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of the project documentation.
7. The subject of this audit is:
compliance with mandatory requirements.
# 762100412377
Unscheduled inspection
Start date: 2021-09-07, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Purpose: based on the inspection program; Task: to determine the compliance of the work performed during the construction of the capital construction facility with the requirements of the project documentation Subject: compliance with mandatory requirements
# 762000288423
Unscheduled inspection
Start date: 2021-06-16, end date: 2020-09-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This inspection is carried out for the purpose of:
based on the inspection program.
The objectives of this audit are:
to determine the compliance of the works performed during the construction of the capital construction facility with the requirements of the project documentation.
7. The subject of this audit is:
compliance with mandatory requirements.
# 762000236890
Unscheduled inspection
Start date: 2021-05-27, end date: 2020-09-24, duration: 6
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: proverka provoditsya s celyu:
na osnovanii izvescheniya ob okonchanii stroitelstva (rekonstrukcii) obekta kapitalnogo stroitelstva ot 19.05.2021 Vh. № 660;
Zadachami nastoyaschei proverki yavlyayutsya:
opredelenie sootvetstviya postroennogo obekta kapitalnogo stroitelstva, trebovaniyam proektnoi dokumentacii.
Predmetom nastoyaschei proverki yavlyaetsya:
soblyudenie obyazatelnyh trebovanii.
7. Predmetom nastoyaschei proverki yavlyaetsya:
soblyudenie obyazatelnyh trebovanii.
# 762100227542
Unscheduled inspection
Start date: 2021-05-27, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Purpose: based on the inspection program; Task: to determine the compliance of the work performed during the construction of the capital construction facility with the requirements of the project documentation Subject: compliance with mandatory requirements
# 762000062924
Unscheduled inspection
Start date: 2021-03-18, end date: 2020-09-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This inspection is carried out for the purpose of:
based on the inspection program.
The objectives of this audit are:
to determine the compliance of the works performed during the construction of the capital construction facility with the requirements of the project documentation.
7. The subject of this audit is:
compliance with mandatory requirements.
# 762000062883
Unscheduled inspection
Start date: 2021-03-18, end date: 2020-09-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This inspection is carried out for the purpose of:
based on the inspection program.
The objectives of this audit are:
to determine the compliance of the works performed during the construction of the capital construction facility with the requirements of the project documentation.
7. The subject of this audit is:
compliance with mandatory requirements.
# 762005289967
Unscheduled inspection
Start date: 2020-12-29, end date: 2020-12-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Purpose based on the inspection program, the task is to determine the compliance of the work performed during the construction of the capital construction facility with the requirements of the project documentation, the subject is compliance with mandatory requirements
# 762005189495
Unscheduled inspection
Start date: 2020-10-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection:
# 762004439228
Unscheduled inspection
Start date: 2020-06-29, end date: 2020-06-29, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Purpose based on the inspection program, the task is to determine the compliance of the work performed during the construction of the capital construction facility with the requirements of the project documentation, the subject is compliance with mandatory requirements
# 762004440213
Unscheduled inspection
Start date: 2020-06-26, end date: 2020-06-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of project documentation7 The subject of this audit is compliance with mandatory requirements
# 762004377015
Unscheduled inspection
Start date: 2020-03-25, end date: 2020-03-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Purpose based on the inspection program, the task is to determine the compliance of the work performed during the construction of the capital construction facility with the requirements of the project documentation, the subject is compliance with mandatory requirements
# 762003644553
Unscheduled inspection
Start date: 2020-03-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 762004221853
Unscheduled inspection
Start date: 2020-01-24, end date: 2020-01-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Purpose based on the inspection program, the task is to determine the compliance of the work performed during the construction of the capital construction facility with the requirements of the project documentation, the subject is compliance with mandatory requirements
# 761904047140
Unscheduled inspection
Start date: 2019-12-17, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection:
# 761903985690
Unscheduled inspection
Start date: 2019-11-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 761903970782
Unscheduled inspection
Start date: 2019-11-14, end date: 2019-11-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: This audit is carried out in order to determine, on the basis of the verification program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation7 The subject of this audit is compliance with mandatory requirements
# 761903896940
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-10-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose on the basis of the inspection program is to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation Subject to compliance with mandatory requirements
# 761903896914
Unscheduled inspection
Start date: 2019-10-28, end date: 2019-10-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose on the basis of the inspection program is to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation Subject to compliance with mandatory requirements
# 761902967348
Unscheduled inspection
Start date: 2019-08-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 761902715606
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose on the basis of the inspection program is to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation Subject to compliance with mandatory requirements
# 761902715577
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose on the basis of the inspection program is to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation Subject to compliance with mandatory requirements
# 761902715559
Unscheduled inspection
Start date: 2019-05-20, end date: 2019-05-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose on the basis of the inspection program is to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation Subject to compliance with mandatory requirements
# 761902616354
Unscheduled inspection
Start date: 2019-04-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 761902678960
Unscheduled inspection
Start date: 2019-04-25, end date: 2019-04-25, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, on the basis of the audit program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements
# 761902525304
Unscheduled inspection
Start date: 2019-02-21, end date: 2019-02-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose on the basis of the inspection program is to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation Subject to compliance with mandatory requirements
# 761902527055
Unscheduled inspection
Start date: 2019-02-07, end date: 2019-02-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: proverka provoditsya s celyu rekvizity motivirovannogo predstavleniya dolzhnostnogo lica organa gosudarstvennogo kontrolya nadzora po rezultatam analiza rezultatov meropriyatii po kontrolyu bez vzaimodeistviya s yuridicheskimi licami informacii ot organov gosudarstvennoi vlasti ot 05022019 Zadachami nastoyaschei proverki yavlyayutsya soblyudenie obyazatelnyh trebovanii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii
# 761902455596
Unscheduled inspection
Start date: 2019-01-25, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection:
# 761902455565
Unscheduled inspection
Start date: 2019-01-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 761800898541
Unscheduled inspection
Start date: 2018-09-10, end date: 2018-09-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: proverka provoditsya s celyu na osnovanii izvescheniya ob okonchanii stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva ot 13082018 Vh 1202018 Zadachami nastoyaschei proverki yavlyayutsya opredelenie sootvetstviya postroennogo obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov norm i pravil inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii
# 761800612383
Unscheduled inspection
Start date: 2018-08-10, end date: 2018-08-10, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: proverka provoditsya s celyu na osnovanii izvescheniya ob okonchanii stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva ot 20072018 Vh 1062018 Zadachami nastoyaschei proverki yavlyayutsya opredelenie sootvetstviya postroennogo obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov norm i pravil inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii
# 761800664415
Unscheduled inspection
Start date: 2018-08-21, end date: 2018-08-21, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: the audit is carried out in order to determine, on the basis of the audit program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements
# 761800564356
Unscheduled inspection
Start date: 2018-07-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 761800568048
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose on the basis of the inspection program is to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation Subject to compliance with mandatory requirements
# 761800568031
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose on the basis of the inspection program is to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation Subject to compliance with mandatory requirements
# 761800568055
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-07-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose on the basis of the inspection program is to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation Subject to compliance with mandatory requirements
# 761800449751
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: proverka provoditsya s celyu rekvizity ranee vydannogo proveryaemomu licu predpisaniya ob ustranenii vyyavlennogo narusheniya srok dlya ispolneniya kotorogo istek ot 19042018 g 1 Zadachami nastoyaschei proverki yavlyayutsya opredelenie vypolneniya meropriyatii predusmotrennyh predpisaniem ot 19042018 1 Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii vypolnenie predpisanii organov gosudarstvennogo nadzora
# 761800446550
Unscheduled inspection
Start date: 2018-06-20, end date: 2018-06-22, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: proverka provoditsya s celyu na osnovanii izvescheniya ob okonchanii stroitelstva rekonstrukcii obekta kapitalnogo stroitelstva ot 29052018 Vh 612018 Zadachami nastoyaschei proverki yavlyayutsya opredelenie sootvetstviya postroennogo obekta kapitalnogo stroitelstva trebovaniyam tehnicheskih reglamentov norm i pravil inyh normativnyh pravovyh aktov i proektnoi dokumentacii Predmetom nastoyaschei proverki yavlyaetsya soblyudenie obyazatelnyh trebovanii
# 761800386295
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-04-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: the audit is carried out in order to determine, on the basis of the audit program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements
# 761800386372
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-04-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The audit is carried out in order to determine, on the basis of the audit program, the objectives of this audit are to determine whether the work performed during the construction of a capital construction facility meets the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation. The subject of this audit is compliance with mandatory requirements
# 761800324439
Unscheduled inspection
Start date: 2018-04-27, end date: 2018-04-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose on the basis of the inspection program is to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation Subject to compliance with mandatory requirements
# 761800106953
Unscheduled inspection
Start date: 2018-02-27, end date: 2018-02-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: The purpose on the basis of the inspection program is to determine the compliance of the work performed during the construction of a capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation Subject to compliance with mandatory requirements
# 76170802455567
Unscheduled inspection
Start date: 2017-09-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 76170701745774
Unscheduled inspection
Start date: 2017-07-19, end date: 2017-07-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: Compliance with the mandatory requirements of technical regulations
# 76170701692974
Unscheduled inspection
Start date: 2017-06-20, end date: 2017-06-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: proverka soblyudeniya trebovanii gradostroitelnogo zakonodatelstva i tehnicheskih reglamentov po rezultatam proverki akt8104 ot 05062017
# 76170701525121
Unscheduled inspection
Start date: 2017-04-11, end date: 2017-04-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora YAroslavskoi oblasti
Purpose of inspection: proverka soblyudeniya obyazatelnyh trebovanii tehnicheskih reglamentov norm i pravil po rezultatam akta 4504 ot 05042017