# 561904003853
Unscheduled inspection
Start date: 2019-11-25, end date: 2019-11-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Orenburgskoi oblasti
Purpose of inspection: implementation of regional state construction supervision on the basis of a notice on the completion dates of works subject to inspection during the construction of a capital construction facility bx 2760 dated 19/12/2019 identification and suppression of violations of the requirements of the design documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used legislation on urban development h 2 art 51 h 2 3 31 6 Art 52 of the Urban Planning Code of the Russian Federation compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, compliance with urban planning legislation h 2 Art 51 h 2 3 31 6 Art 52 of the Urban Planning Code Code of the Russian Federation roof boiler house facade gas pipeline