Found 6 inspections:

# 502004727175
Unscheduled inspection
Start date: 2020-07-31, end date: 2020-08-24, duration: 3
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: assessment of compliance of the work performed with the requirements of the design documentation at the capital construction site Collectors of the external sewerage network K2DN=1000mm C2DN=1000mm K1DN=315mm located on a land plot with cadastral number 502800501057 at the address Moscow region Domodedovo district with Domodedovo Collectors of the external sewerage network K2DN=1000mm C2DN=1000mm K1DN=315mm located at the address Moscow region Domodedovo district from Domodedovo at the intersection of the M2 Krympavlovskoye highway 3 technical category highway code 12800371400km 1855km stage 2 at the address Moscow region Domodedovo district from Domodedovo


# 502004727162
Unscheduled inspection
Start date: 2020-07-31, end date: —, duration:
Authority:
Purpose of inspection:


# 501903706197
Unscheduled inspection
Start date: 2019-09-18, end date: 2019-09-24, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 17072019 0712081500502 with a deadline of 17092019 for the execution of project documentation at the capital construction facility Connection of the facilities of the Domodedovo PLC to the M2KrymPavlovskoye highway 2 technical category road code 1280037a namely the entrance exit from the checkpoint 2 located at the address of the Moscow region Domodedovo microdistrict Severnyullogistic at the address Moscow region Domodedovo microdistrict Severny Logistic street verification of execution regulations dated 17072019 0712081500502 with a deadline of 17092019


# 501800399491
Unscheduled inspection
Start date: 2018-02-13, end date: —, duration:
Authority:
Purpose of inspection:


# 50170801944694
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-07-31, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 20062017 0712081400501 deadline for completion until 24072017 assessment of compliance of the work performed with the requirements of technical regulations and project documentation "Connection of the facilities of the Northern Domodedovo PLC to the Kashirskoye highway 2 technical category road code 1280037 namely the entrance exit from the checkpoint 1" at the address Moscow region Domodedovo microdistrict Severny Street Logistic verification of the execution of the order from 20062017 0712081400501 due date is 24072017


# 50170801944838
Unscheduled inspection
Start date: 2017-07-25, end date: 2017-08-31, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the execution of the order from 20062017 0712081500501 deadline to 24072017 assessment of compliance of the work performed with the requirements of technical regulations and design documentation at the capital construction facility Connection of the facilities of the Domodedovo PLC to the M2KrymPavlovskoye highway 2 technical category road code 1280037a namely the entrance exit from the checkpoint 2 located at the address of the Moscow region Domodedovo microdistrict Severnyullogistic at the address Moscow region Domodedovo microdistrict Severnoye Logistic street verification of the execution of the regulation from 20062017 0712 081500501 due date is 24072017


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.