# 662101109959
Unscheduled inspection
Start date: 2021-10-19, end date: 2021-10-29, duration: 9
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to control the execution of a previously issued instruction on the elimination of identified violations; Tasks - the implementation of regional state construction supervision; Subject - the implementation of a previously issued instruction on the elimination of an identified violation of mandatory requirements
# 662100592778
Unscheduled inspection
Start date: 2021-09-08, end date: 2021-10-05, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program no. ot; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: The construction of the attached warehouse building (block 2) (No. 3 according to ROM) is the 2nd stage of construction, located at Yekaterinburg, lane. Saraninsky, Novinskaya St., the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a building permit; compliance with the requirements established by parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 662100593001
Unscheduled inspection
Start date: 2021-09-08, end date: —, duration: —
Authority: —
Purpose of inspection:
# 662100795096
Unscheduled inspection
Start date: 2021-09-21, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 662100207047
Unscheduled inspection
Start date: 2021-05-17, end date: 2021-06-11, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to implement the inspection program No. 29-17-15/55-20 dated 2020-09-18; The tasks are to carry out regional state construction supervision; The subject is to verify the conformity of work performed and applicable building materials during the construction of a capital construction facility: Construction of an extension (No. 2 according to ROM) to the shipment site along the E/Z axis in axes 54-68 of the existing finished goods warehouse (No. 1 according to ROM) located at Yekaterinburg, Predelnaya St., the results of such work according to the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation project documentation, including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for energy resources used; availability of a construction permit; and compliance with the requirements established by parts 2, 3, and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 662100052136
Unscheduled inspection
Start date: 2021-03-17, end date: 2021-04-13, duration: 20
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is carried out in order to implement the inspection program No. 27-17-24/29-21 dated 02/16/2021, the purpose of this inspection is to carry out regional state construction supervision.
The subject of this audit is: verification of the conformity of the work performed and the construction materials used during the construction of the capital construction facility "Construction of an attached warehouse building (block 2) (No. 3 according to ROM) - 2nd stage of construction", located at Yekaterinburg, lane. Saraninsky, Novinskaya St., as well as the results of such work to the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of the Urban Planning Code of the Russian Federation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of the Urban Planning Code of the Russian Federation) and (or) the information model (in if the formation and maintenance of an information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and requirements for equipping the capital construction facility with metering devices for used energy resources; availability of a construction permit; meeting the requirements established by
Parts 2, 3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 662004457509
Unscheduled inspection
Start date: 2020-07-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902690794
Unscheduled inspection
Start date: 2019-05-16, end date: 2019-05-30, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This audit is conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707142p1 dated March 25, 2019. The objectives of this audit are to carry out regional state construction supervision. The subject of this audit is the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291707142p1 dated March 25, 2019.
# 661902731644
Unscheduled inspection
Start date: 2019-05-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902546888
Unscheduled inspection
Start date: 2019-03-04, end date: 2019-03-15, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 30120119215 COR 6 dated April 10, 2018 Tasks implementation of regional state construction supervision Subject matter verification of compliance of work performed and construction materials used in the construction of an investment facility with the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping an investment facility with metering devices for energy resources used, as well as the availability of permits for construction and fulfillment of the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation
# 661801022014
Unscheduled inspection
Start date: 2018-09-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800540934
Unscheduled inspection
Start date: 2018-07-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66180803050636
Unscheduled inspection
Start date: 2018-01-18, end date: 2018-01-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 29170137917 dated 10102017. The objectives of this inspection are the implementation of regional state construction supervision
# 66170802935851
Unscheduled inspection
Start date: 2017-12-04, end date: 2017-12-22, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The purpose is to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291705C4748P dated October 24, 2017The tasks of the regional state construction Supervision are to implement the previously issued order to eliminate the identified violation of mandatory requirements 291705C4748P dated October 24, 2017
# 66170802824361
Unscheduled inspection
Start date: 2017-11-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170802628838
Unscheduled inspection
Start date: 2017-10-02, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701615995
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-26, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: The inspection is carried out in order to implement the inspection program 29170144116 dated November 17, 2016. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the reconstruction of the capital construction facility "Reconstruction of an existing multifunctional building with the construction of a 2-storey annex to accommodate the Block A hypermarket with a built-in outdoor parking manege type and an integrated distribution substation 1 according to ROM, local sewage treatment plants 6 according to ROM, a diesel power plant 7 according to ROM, a sewage pumping station 9 according to ROM, Stage III of the construction of a shopping center located at Shcherbakova St., Yekaterinburg, Sverdlovsk Region, the results of such work meet the requirements of technical regulations, fire safety requirements, safety rules and state standards for project documentation, including energy requirements. the efficiency and requirements of equipping the capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170701540851
Unscheduled inspection
Start date: 2017-04-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701419308
Unscheduled inspection
Start date: 2017-03-13, end date: 2017-03-24, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 30120119215, as amended on March 01, 2016. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "The production building of the service station with the attached administrative building 1 according to the ROM, the building of the checkpoint 6 according to ROM pumping station building 3 on ROM block transformer substation 2 on ROM block modular gas boiler house 8 on ROM fire fighting tanks 4 on ROM sewage treatment plants 5 on ROM" located at Yekaterinburg Chkalovsky district Southeastern industrial complex of the results of such work requirements of technical regulations requirements of fire safety safety rules and state standards of project documentation, including energy requirements the efficiency and requirements of equipping the capital construction facility with metering devices for the energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66170701424017
Unscheduled inspection
Start date: 2017-03-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701423750
Unscheduled inspection
Start date: 2017-03-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701339075
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-02-24, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is being conducted in order to monitor the implementation of the previously issued order to eliminate the identified violation of mandatory requirements 291704x4753 p1 dated November 25, 2016. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to comply with the previously issued order to eliminate the identified violation of mandatory requirements 291704x4753 p1 dated November 25, 2016
# 66170701339091
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-02-24, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: To establish that this inspection is being conducted in order to implement the inspection program 30130444113, as amended on October 05, 2016. The objectives of this inspection are to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of work and applicable building materials during the reconstruction of the capital construction facility "Reconstruction of part of the administrative building in the axes of LU710 dividing the two-light space of the former conference hall into two floors" located at 19 Mashinostroiteley St., Yekaterinburg Ordzhonikidze district, the results of such work meet the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation
# 66160701239292
Unscheduled inspection
Start date: 2016-12-13, end date: 2016-12-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: implementation of the inspection program 29170144116 dated 17112016, the objectives of which are to carry out state construction supervision. The subject of this inspection is to verify the compliance of the work and the building materials used in the construction of the capital construction facility "Reconstruction of an existing multifunctional building with the construction of a 2-storey annex to accommodate the block A hypermarket with integrated outdoor parking manege type and integrated distribution substation 1 on ROM local sewage treatment plants 6 according to ROM diesel power plant 7 according to ROM sewage pumping station 9 according to ROM stage III of the construction of a shopping center located at Yekaterinburg, Chkalovsky district, Shcherbakova St. the results of such work are building codes and safety rules and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities
# 66160701050300
Unscheduled inspection
Start date: 2016-10-31, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 66160700961513
Unscheduled inspection
Start date: 2016-10-04, end date: —, duration: —
Authority: —
Purpose of inspection: