Found 3 inspections:

# 74170701336036
Unscheduled inspection
Start date: 2017-02-06, end date: 2017-02-10, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work with the installation of internal engineering power supply systems and low-current networks 2 construction stages in axes 13 after completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160701162286
Unscheduled inspection
Start date: 2016-12-05, end date: 2016-12-09, duration:
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work with the installation of internal engineering power supply systems and low-current networks 2 construction stages in axes 13 during installation and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the need for a construction permit3compliance with the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation


# 74160601795490
Unscheduled inspection
Start date: 2016-08-22, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.