# 002105314661
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-01-26, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment by IC Interpol LLC of the points of the previously issued instructions on the elimination of identified violations dated 07/20/2020 No. RP-332-1787- o-3, dated 04/06/2020 No.RP-332-649- Oh.
# 742101298185
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100676110
Unscheduled inspection
Start date: 2021-09-13, end date: 2021-09-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the frame (columns, beams, ties), the installation of trusses and girders (Production building No. 2), the foundation (Production Building No. 1). and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with the parts 15, 15.2 and 15.3 of Article 48 of this Code of the project documentation (subject to changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities, which are not subject to energy efficiency requirements) and the requirements for equipping a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 742100291720
Unscheduled inspection
Start date: 2021-06-21, end date: 2021-06-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the foundation (production building No. 2) and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes made to the project documentation in accordance with in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which energy efficiency requirements do not apply) and equipment requirements a capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of art.52 of the Urban Planning Code of the Russian Federation.
# 742100063164
Unscheduled inspection
Start date: 2021-03-16, end date: 2021-03-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Verification of the execution of the order dated 02/16/2021, due on 03/03/2021. 2. Availability of a building permit. 3. Meeting the requirements of Parts 2.3 and 3.1 of art. 52 of the Urban Planning Code of the Russian Federation.
# 002105314661
Unscheduled inspection
Start date: 2021-01-20, end date: 2021-01-26, duration: 5
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu, tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment by IC Interpol LLC of the points of the previously issued instructions on the elimination of identified violations dated 07/20/2020 No. RP-332-1787- o-3, dated 04/06/2020 No.RP-332-649- Oh.
# 742004386330
Unscheduled inspection
Start date: 2020-04-06, end date: 2020-04-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of the supporting structures of the communication tunnel, the end of the junction box, the end of the upper drain tank, the end of the supporting structures of the retaining walls, the end of the supporting structures of the thickener 1, 1st stage ABC of the frame of the overpass of the supply pulp pipelines and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements approved in accordance with Parts 15 152 and 153 Article 48 of this Code of the project documentation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of the information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements They also do not apply to the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation 4 Verification of compliance with regulations from 02032020 with a deadline of 02042020
# 742004327452
Unscheduled inspection
Start date: 2020-03-23, end date: 2020-04-06, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment by IC Interpol LLC of the points of the previously issued instruction on the elimination of identified violations from 10122019 Sv6024r
# 742004302924
Unscheduled inspection
Start date: 2020-02-25, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004264674
Unscheduled inspection
Start date: 2020-02-10, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741904031249
Unscheduled inspection
Start date: 2019-11-27, end date: 2019-12-10, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment by IC Interpol LLC of the points of the previously issued instruction on the elimination of identified violations from 26082019 Sv3439r
# 741902913784
Unscheduled inspection
Start date: 2019-08-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902708791
Unscheduled inspection
Start date: 2019-05-16, end date: —, duration: —
Authority: —
Purpose of inspection:
# 001902519102
Unscheduled inspection
Start date: 2019-02-20, end date: 2019-02-28, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment by IC Interpol LLC of the points of the previously issued instructions on the elimination of identified violations from 30102018 Sv5683r1 from 30102018 Sv5678r
# 741902527887
Unscheduled inspection
Start date: 2019-02-27, end date: 2019-03-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the construction of the foundation pit in PM pile driving installation of portals lightning rods installation of the building and the construction materials used in the construction of the capital construction facility as well as the results of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802000073
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-10-30, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This check is carried out in order to verify the fulfillment by Interpol IC LLC of the points of the previously issued instruction on the elimination of identified violations dated 09072018 Cb32432. The purpose of this check is to take measures to control the elimination of violations specified in the previously issued instruction on the elimination of identified violations dated 09072018 Cb32432.
# 741801980257
Unscheduled inspection
Start date: 2018-10-22, end date: 2018-10-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of wall sandwich panels of an overhead crane internal pipelines landscaping installation of electricity supply electric lighting after the actual completion of work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800471295
Unscheduled inspection
Start date: 2018-07-09, end date: 2018-07-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the execution of the regulation from 300-52018 with a deadline until 06072018 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 001800465609
Unscheduled inspection
Start date: 2018-06-18, end date: 2018-06-22, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to verify the fulfillment by IC InterPol LLC of the points of the previously issued instruction on the elimination of identified violations 28042018 Sv1681rP3 The purpose of this audit is to implement measures to control the elimination of violations specified in the previously issued instruction from 28042018 Sv1681rP3 The subject of this audit is to comply with the instructions of the state control and supervision authorities
# 741800501748
Unscheduled inspection
Start date: 2018-06-28, end date: 2018-07-09, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This audit is conducted in order to verify the fulfillment by IC Interpol LLC of the points of the previously issued instruction on the elimination of identified violations from 05032018 Cb8991 The purpose of this audit is to implement measures to control the elimination of violations specified in the previously issued instruction on the elimination of identified violations from 05032018 Cb8991
# 741800375754
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-05-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the roof installation completion of the installation of enclosing structures completion of internal staircase structures completion of the building of the administrative building with the dining room installation of metal structures of the buildings of the dormitory 2 closed material warehouse checkpoint with weight fencing of the warehouse and fencing of the industrial site foundations of the laboratory complex and household building installation of internal engineering systems window openings and interior finishing works of the 2nd floor of the building of the administrative building with the dining room and the construction materials used in the construction of a capital construction facility as well as the results of such work meet the requirements of technical regulations of project documentation 2 The presence of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800276290
Unscheduled inspection
Start date: 2018-04-16, end date: 2018-04-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of wall sandwich panels with the installation of a soft roof of internal pipelines and networks running below zero during the work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation 4 Verification of the fulfillment of the prescription from 30032018 with a deadline until 16042018
# 741800276237
Unscheduled inspection
Start date: 2018-04-17, end date: 2018-04-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of compliance with the regulation from 16022018 with a deadline until 16042018 2 Availability of a building permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800204605
Unscheduled inspection
Start date: 2018-03-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800055696
Unscheduled inspection
Start date: 2018-02-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800064711
Unscheduled inspection
Start date: 2018-02-16, end date: 2018-02-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of girder trusses during the work of the technological equipment of the MK teply galerie after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800026686
Unscheduled inspection
Start date: 2018-02-05, end date: 2018-02-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1conformity of work installation of internal engineering systems of cable-carrying power supply systems of electric lighting of water supply and sanitation in axes 15BP 530G1P 1433AD concreting of finishing floors installation of metal structures of base panels enclosing structures from sandwich panels of water supply and sanitation in axes 3040AP after the actual completion of work and the construction materials used during the construction of the capital construction facility as well as the results of such work requirements of technical regulations project documentation 2The receipt of permits for construction 3Compliance with the requirements of HH 23 and 31 ST52 of the Urban Planning Code of the Russian Federation
# 16170802974643
Unscheduled inspection
Start date: 2017-12-08, end date: 2018-01-18, duration: —
Authority: Gosudarstvennaya inspekciya truda v Respublike Tatarstan
Purpose of inspection: supervision of accident investigation
# 74170802999597
Unscheduled inspection
Start date: 2017-12-22, end date: 2017-12-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of columns, the installation of foundations for a warm gallery, the backfilling of the excavation after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802839979
Unscheduled inspection
Start date: 2017-11-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802816900
Unscheduled inspection
Start date: 2017-11-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802759221
Unscheduled inspection
Start date: 2017-10-24, end date: 2017-10-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of foundation pits testing of trial piles and used building materials during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Availability of construction permits 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802759217
Unscheduled inspection
Start date: 2017-10-24, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802619811
Unscheduled inspection
Start date: 2017-10-02, end date: 2017-10-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work Concreting of the power floor slab with a finishing coating installation of the GCU site in the 15BP axes of the passage platforms of the stairs in the 1433AD axes installation of water supply, drainage, heating, ventilation, electric lighting, interior finishing work in the 514BD axes after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations project documentation2 Availability of a construction permit3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802741285
Unscheduled inspection
Start date: 2017-10-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802754247
Unscheduled inspection
Start date: 2017-10-31, end date: 2017-11-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work with the installation of foundations for equipment after the actual completion of work, the installation of columns during the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802450981
Unscheduled inspection
Start date: 2017-09-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802001495
Unscheduled inspection
Start date: 2017-09-06, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701841940
Unscheduled inspection
Start date: 2017-08-01, end date: 2017-08-07, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The actual condition of the capital construction facility 2 The availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701805316
Unscheduled inspection
Start date: 2017-07-20, end date: 2017-07-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance with the work performed floor covering on otm 29550 in axes 45 of finishing floors on otm 9500 10700 in axes 15 of the roof in axes 1433AD 3340AP installation of metal structures of base panels in axes 2740AP of internal sandwich panel partitions concreting of the floor power plate in axes 530G1P 2740AP after the actual completion of work and the construction materials used during the construction of the capital construction facility and also, the results of such work meet the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of Part 23 of Article 52 of the Urban Planning Code of the Russian Federation
# 74170701656796
Unscheduled inspection
Start date: 2017-06-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701750288
Unscheduled inspection
Start date: 2017-06-30, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701615171
Unscheduled inspection
Start date: 2017-05-17, end date: 2017-05-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed with the installation of an automobile maintenance tunnel after the actual completion of work and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of h 23 Art 52 of the Urban Planning Code of the Russian Federation
# 74170701581726
Unscheduled inspection
Start date: 2017-05-05, end date: 2017-05-12, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work Installation of internal metal structures after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of part 23 of Art 52 of the Urban Planning Code of the Russian Federation
# 74170701624602
Unscheduled inspection
Start date: 2017-05-22, end date: 2017-05-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of internal engineering systems for power supply electric lighting ventilation heating installation of floors in axes 15BP 530G1P installation of enclosing structures installation of sandwich panels installation of floors in axes 1233AG1 and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation2 Availability of a construction permit 3 Compliance with the requirements of h 23 st 52 Urban Planning the Code of the Russian Federation
# 74170701468212
Unscheduled inspection
Start date: 2017-03-31, end date: 2017-04-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of internal engineering systems electricity, electric lighting, ventilation, heating and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of Part 23 of Article 52 of the Urban Planning Code of the Russian Federation
# 74170701468005
Unscheduled inspection
Start date: 2017-03-22, end date: 2017-03-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of metal structures of overhead cranes after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of part 23 of Art 52 of the Urban Planning Code of the Russian Federation
# 74170701467879
Unscheduled inspection
Start date: 2017-03-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701359109
Unscheduled inspection
Start date: 2017-02-07, end date: 2017-02-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work with the installation of foundations for equipment, the installation of metal structures for the building frame, the installation of enclosing structures after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit3 Compliance with the requirements of h 23 Art 52 of the Urban Planning Code of the Russian Federation
# 74170701357477
Unscheduled inspection
Start date: 2017-02-07, end date: 2017-02-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of retaining walls in the 23AG axes, the installation of a power plate in the 310AG axes after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of h 23 Art 52 of the Urban Planning Code of the Russian Federation
# 74170701318701
Unscheduled inspection
Start date: 2017-01-30, end date: 2017-02-03, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work installation of the roof installation of technological metal structures installation of enclosing structures after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of h 23 Art 52 of the Urban Planning Code of the Russian Federation
# 74160701217085
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work with the installation of a tunnel with an overlap in the 310BV axes after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of h 23 Art 52 of the Urban Planning Code of the Russian Federation
# 74160701217153
Unscheduled inspection
Start date: 2016-12-12, end date: 2016-12-16, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 The compliance of the work with the installation of the foundation pit of the galleries 25 the installation of the foundations of the galleries 25 after the actual completion of the work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 The availability of a construction permit 3 Compliance with the requirements of h 23 Art 52 of the Urban Planning Code of the Russian Federation
# 74160701268898
Unscheduled inspection
Start date: 2016-12-23, end date: 2017-01-26, duration: —
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: This audit is conducted with the aim of implementing federal state supervision over compliance with labor laws and other regulatory legal acts containing labor law norms, including on issues of remuneration in connection with the received appeal bx 7643916OB dated 12122016the objectives of this audit are to ensure compliance with and protection of labor rights and freedoms of citizensthe purpose of this audit is to note the necessary compliance with mandatory requirements or requirements established by municipal legal acts
# 74160701028212
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-10-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work performed with the installation of the mk frame of the building after the actual completion of work and the construction materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2 Availability of a construction permit3 Compliance with the requirements of h 23 Art 52 of the Urban Planning Code of the Russian Federation