Found 65 inspections:

# 001903904041
Unscheduled inspection
Start date: 2019-11-19, end date: 2019-11-26, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to comply with the order of the Head of the Federal Service for Environmental, Technological and Nuclear Supervision AV Alyoshin dated 01022019 44 "On conducting inspections of compliance with mandatory requirements by electric power industry entities, heat supply organizations, heating grid organizations and consumers of electric energy in 2019" based on the instruction of the Government of the Russian Federation dated 18012019 DCP9254THE task of checking the implementation of federal energy supervision is to verify compliance by a legal entity in the course of its activities with mandatory requirements on the safe conduct of work at electric power facilities, safety requirements in the field of electric power industry


# 00160601746670
Unscheduled inspection
Start date: 2016-07-15, end date: 2016-07-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor based on the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate violations of mandatory requirements. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The purpose of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 326616 dated 25042016


# 772101484409
Unscheduled inspection
Start date: 2021-12-17, end date: 2021-12-29, duration: 9
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit: carrying out control measures in connection with the receipt of a notification from the developer (customer); The objectives of the audit: prevention, detection and suppression of violations of the requirements of project documentation, legislation on urban development by the audited person; The subject of the audit: compliance of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results such works meet the requirements of the design documentation, including the requirements of energy efficiency and the requirements of equipping the capital construction facility with metering devices for the energy resources used, including checking the elimination of violations of compliance of the completed works with the requirements of the design documentation identified during construction control and state construction supervision


# 772101362688
Unscheduled inspection
Start date: 2021-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 772101354826
Unscheduled inspection
Start date: 2021-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 772100193763
Unscheduled inspection
Start date: 2021-04-29, end date: —, duration:
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection: The purpose and objective of this audit is to verify compliance with the mandatory requirements of the legislation on participation in the shared construction of apartment buildings and (or) other real estate objects. The subject of an unscheduled documentary check is compliance with the requirements of the legislation on participation in the shared construction of apartment buildings and (or) other real estate objects.


# 771903977243
Unscheduled inspection
Start date: 2019-11-13, end date: 2019-12-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the receipt of a notification from the developer to the customer, the tasks of the audit are to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to check the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements capital construction facility with metering devices for energy resources used


# 001903904041
Unscheduled inspection
Start date: 2019-11-19, end date: 2019-11-26, duration:
Authority: Centralnoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: The purpose of the audit is to comply with the order of the Head of the Federal Service for Environmental, Technological and Nuclear Supervision AV Alyoshin dated 01022019 44 "On conducting inspections of compliance with mandatory requirements by electric power industry entities, heat supply organizations, heating grid organizations and consumers of electric energy in 2019" based on the instruction of the Government of the Russian Federation dated 18012019 DCP9254THE task of checking the implementation of federal energy supervision is to verify compliance by a legal entity in the course of its activities with mandatory requirements on the safe conduct of work at electric power facilities, safety requirements in the field of electric power industry


# 501903450645
Unscheduled inspection
Start date: 2019-09-16, end date: 2019-09-20, duration:
Authority: Glavnoe upravlenie gosudarstvennogo stroitelnogo nadzora Moskovskoi oblasti
Purpose of inspection: verification of the elimination of violations notification of the elimination of violations P001264772375227821118 dated 29082019 within the framework of regulation 0908081200501 dated 07082019 with a deadline of 04112019


# 77190803453405
Unscheduled inspection
Start date: 2019-07-01, end date: —, duration:
Authority:
Purpose of inspection:


# 771902893790
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-08-16, duration:
Authority: Upravlenie Federalnoi sluzhby gosudarstvennoi registracii kadastra i kartografii po Moskve
Purpose of inspection: Verification of the execution of the order to eliminate violations of land legislation The tasks of the audit are to prevent identify and suppress violations of the requirements established by land legislation


# 77190803438809
Unscheduled inspection
Start date: 2019-05-24, end date: 2019-06-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: prevention identification and suppression of the requirements for a construction permit and the requirements specified in the construction permit made by the person being checked


# 77190803400983
Unscheduled inspection
Start date: 2019-04-18, end date: 2019-04-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771902642989
Unscheduled inspection
Start date: 2019-04-04, end date: —, duration:
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection:


# 77190803374491
Unscheduled inspection
Start date: 2019-03-19, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803383083
Unscheduled inspection
Start date: 2019-03-28, end date: 2019-04-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803327246
Unscheduled inspection
Start date: 2019-02-05, end date: —, duration:
Authority:
Purpose of inspection:


# 771802342584
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: The purpose of the audit is to monitor the implementation by a legal entity of the previously issued regulation 15811 dated 010618 on the elimination of violations of fire safety requirements on measures to ensure fire safety at protective facilities and to prevent the threat of fire. The objectives of this audit are to carry out Federal State fire supervision over compliance with fire safety requirements by enterprises, as well as officials and citizens. The subject of this audit is compliance with the regulations of state control bodies, supervision bodies of municipal control


# 771802283079
Unscheduled inspection
Start date: 2018-12-03, end date: 2018-12-28, duration:
Authority: Glavnoe upravlenie MCHS Rossii po g Moskve
Purpose of inspection: The purpose of the audit is to monitor the implementation by a legal entity of the previously issued regulation 15811 dated 010618 on the elimination of violations of fire safety requirements on measures to ensure fire safety at protective facilities and to prevent the threat of fire. The objectives of this audit are to carry out Federal State fire supervision over compliance with fire safety requirements by enterprises, as well as officials and citizens. The subject of this audit is compliance with the regulations of state control bodies, supervision bodies of municipal control


# 77180803289526
Unscheduled inspection
Start date: 2018-12-04, end date: 2018-12-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803299841
Unscheduled inspection
Start date: 2018-12-13, end date: 2018-12-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803271706
Unscheduled inspection
Start date: 2018-11-08, end date: 2018-11-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803274078
Unscheduled inspection
Start date: 2018-11-14, end date: 2018-12-11, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803263788
Unscheduled inspection
Start date: 2018-10-26, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803256110
Unscheduled inspection
Start date: 2018-10-18, end date: 2018-10-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803235923
Unscheduled inspection
Start date: 2018-09-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803211494
Unscheduled inspection
Start date: 2018-08-28, end date: 2018-09-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803209810
Unscheduled inspection
Start date: 2018-08-29, end date: 2018-09-04, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803198159
Unscheduled inspection
Start date: 2018-08-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803169005
Unscheduled inspection
Start date: 2018-06-27, end date: 2018-07-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803145023
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-06-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the requirements established by the legislation on urban planning activities within the framework of the subject of state construction supervision


# 77180803137883
Unscheduled inspection
Start date: 2018-05-15, end date: 2018-06-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771800402206
Unscheduled inspection
Start date: 2018-05-24, end date: 2018-06-21, duration:
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection: compliance with the requirements of the legislation on participation in the shared construction of apartment buildings and or other real estate objects


# 77180803130498
Unscheduled inspection
Start date: 2018-04-26, end date: 2018-05-28, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803105919
Unscheduled inspection
Start date: 2018-03-21, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803110178
Unscheduled inspection
Start date: 2018-03-28, end date: 2018-04-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803079604
Unscheduled inspection
Start date: 2018-01-29, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803070391
Unscheduled inspection
Start date: 2018-01-29, end date: 2018-02-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170803017688
Unscheduled inspection
Start date: 2017-12-21, end date: 2017-12-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802923671
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-11-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802780137
Unscheduled inspection
Start date: 2017-10-30, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802590770
Unscheduled inspection
Start date: 2017-09-26, end date: 2017-10-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701800178
Unscheduled inspection
Start date: 2017-07-14, end date: 2017-07-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701660249
Unscheduled inspection
Start date: 2017-06-07, end date: 2017-07-05, duration:
Authority: Komitet goroda Moskvy po obespecheniyu realizacii investicionnyh proektov v stroitelstve i kontrolyu v oblasti dolevogo stroitelstva
Purpose of inspection: control over the activities of PSF Krost LLC related to the attraction and expenditure of funds from participants in shared-equity construction control over compliance with the provisions of Federal Law No. 30122004 214 FZ


# 77170701733799
Unscheduled inspection
Start date: 2017-06-21, end date: 2017-06-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701585604
Unscheduled inspection
Start date: 2017-05-03, end date: 2017-05-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701584317
Unscheduled inspection
Start date: 2017-04-28, end date: 2017-05-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701499977
Unscheduled inspection
Start date: 2017-03-30, end date: 2017-03-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701399140
Unscheduled inspection
Start date: 2017-02-16, end date: 2017-02-22, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701379647
Unscheduled inspection
Start date: 2017-02-27, end date: 2017-03-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, certificates of admission issued by a self-regulatory organization to works that affect the safety of capital construction facilities


# 77170701364793
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701314889
Unscheduled inspection
Start date: 2017-01-18, end date: 2017-01-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701297453
Unscheduled inspection
Start date: 2017-01-16, end date: 2017-02-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: availability of building and reconstruction permits


# 77160701280676
Unscheduled inspection
Start date: 2016-12-28, end date: 2017-01-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: availability of building and reconstruction permits


# 77160701244233
Unscheduled inspection
Start date: 2016-12-23, end date: 2016-12-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701130688
Unscheduled inspection
Start date: 2016-11-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701126436
Unscheduled inspection
Start date: 2016-11-18, end date: 2016-11-23, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


# 77160700967235
Unscheduled inspection
Start date: 2016-10-07, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77160701022894
Unscheduled inspection
Start date: 2016-10-20, end date: 2016-10-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation based on an approved verification program. The objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 1000116 dated 26092016. compliance of work performed and construction materials used during construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 77160700090858
Unscheduled inspection
Start date: 2016-09-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700086702
Unscheduled inspection
Start date: 2016-09-01, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77160700729935
Unscheduled inspection
Start date: 2016-09-22, end date: 2016-09-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation based on an approved verification program. The objectives of this audit are to prevent identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 738116 dated 13072016. compliance of work performed and construction materials used during construction reconstruction of the capital construction facility as well as the results of such work to the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources


# 00160601746670
Unscheduled inspection
Start date: 2016-07-15, end date: 2016-07-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor based on the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate violations of mandatory requirements. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The purpose of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 326616 dated 25042016


# 00160601746631
Unscheduled inspection
Start date: 2016-07-15, end date: 2016-07-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: To establish that this inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor on the basis of the expiration of the deadline for the execution by a legal entity, an individual entrepreneur, of an order issued by the state construction supervision authority to eliminate violations of mandatory requirements. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being audited. The purpose of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 405116 dated 11052016


# 77160601704161
Unscheduled inspection
Start date: 2016-07-12, end date: 2016-07-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: the audit is carried out in order to ensure that the capital construction facility meets the requirements of technical regulations and design documentation on the basis of an approved verification program. The objectives of this audit are to prevent, identify and suppress violations of technical regulations and design documentation committed by the person being audited. The subject of this audit is the compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations design documentation, including requirements for energy efficiency and requirements for the equipment of the capital construction facility with metering devices for energy resources used


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.