Found 24 inspections:

# 001903871241
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-01, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 26072019 09309 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek 11102019gZadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 26072019 09309Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 26072019 09309


# 001902822267
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-26, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation committed by the person carrying out the construction. The subject of this audit is The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.


# 001902663392
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-05-24, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 08022019 09031 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek 12042019 Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 08022019 09031 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 08022019 09031


# 001800618723
Unscheduled inspection
Start date: 2018-08-13, end date: 2018-08-24, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 01062018 093338692018 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 01062018 093338692018 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 01062018 093338692018


# 001800576011
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-24, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu osuschestvleniya gosudarstvennogo stroitelnogo nadzora pri stroitelstve ukazannogo obekta kapitalnogo stroitelstva v svyazi s nastupleniem srokov zaversheniya rabot kotorye podlezhat proverke v sootvetstvii s utverzhdennoi programmoi provedeniya proverok pri stroitelstve obektov kapitalnogo stroitelstva


# 002004347945
Unscheduled inspection
Start date: 2020-03-30, end date: 2020-04-24, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya v ramkah gosudarstvennogo stroitelnogo nadzora pri stroitelstve rekonstrukcii kapitalnom remonte obektov ukazannyh v punkte 51 stati 6 Gradostroitelnogo kodeksa Rossiiskoi Federacii za isklyucheniem obektov v otnoshenii kotoryh osuschestvlenie gosudarstvennogo stroitelnogo nadzora ukazami Prezidenta Rossiiskoi Federacii vozlozheno na inye federalnye organy ispolnitelnoi vlasti reestrovyi 10001515438 v svyazi s postupivshim izvescheniem ot 25022020 508S00101158120 vh 3617601 ot 26022020 g ot zastroischika ob okonchanii stroitelstva obekta kapitalnogo stroitelstvaZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya 1 proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 001903871241
Unscheduled inspection
Start date: 2019-10-21, end date: 2019-11-01, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 26072019 09309 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek 11102019gZadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 26072019 09309Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 26072019 09309


# 001902822291
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-26, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation committed by the person carrying out the construction. The subject of this audit is The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.


# 001902822267
Unscheduled inspection
Start date: 2019-07-01, end date: 2019-07-26, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Implementation of state construction supervision during the construction of the specified capital construction facility in connection with the timing of completion of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the law on urban development, including technical regulations and project documentation committed by the person carrying out the construction. The subject of this audit is The purpose of this work is to verify the compliance of the work performed and the building materials used during the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations and project documentation, including energy efficiency requirements and the requirements for equipping the capital construction facility with metering devices for energy resources used.


# 001902821948
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-07-01, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe rekonstrukcii obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov Proverka nalichiya razresheniya na stroitelstvov svyazi s postupivshim izvescheniem BoAZ011475619 ot 23052019 vh 43846 ot 24052019 g ot zastroischika ob okonchanii stroitelstva obekta kapitalnogo stroitelstva


# 001902793251
Unscheduled inspection
Start date: 2019-06-03, end date: 2019-07-01, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Nastoyaschaya proverka provoditsya v ramkah gosudarstvennogo stroitelnogo nadzora pri stroitelstve rekonstrukcii kapitalnom remonte obektov ukazannyh v punkte 51 stati 6 Gradostroitelnogo kodeksa Rossiiskoi Federacii za isklyucheniem obektov v otnoshenii kotoryh osuschestvlenie gosudarstvennogo stroitelnogo nadzora ukazami Prezidenta Rossiiskoi Federacii vozlozheno na inye federalnye organy ispolnitelnoi vlasti reestrovyi 10001515438 v svyazi s postupivshim izvescheniem ot 23052019 BoAZ011475619 vh 43846 ot 24052019 g ot zastroischika ob okonchanii stroitelstva obekta kapitalnogo stroitelstvaZadachami nastoyaschei proverki yavlyayutsya preduprezhdenie vyyavlenie i presechenie dopuschennyh zastroischikom narushenii zakonodatelstva o gradostroitelnoi deyatelnosti v tom chisle tehnicheskih reglamentov i proektnoi dokumentaciiPredmetom nastoyaschei proverki yavlyaetsya 1 proverka sootvetstviya vypolneniya rabot i primenyaemyh stroitelnyh materialov v processe stroitelstva obekta kapitalnogo stroitelstva a takzhe rezultatov takih rabot trebovaniyam tehnicheskih reglamentov proektnoi dokumentacii v tom chisle trebovaniyam energeticheskoi effektivnosti i trebovaniyam osnaschennosti obekta kapitalnogo stroitelstva priborami ucheta ispolzuemyh energeticheskih resursov


# 001902663392
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-05-24, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 08022019 09031 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek 12042019 Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 08022019 09031 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 08022019 09031


# 001902471408
Unscheduled inspection
Start date: 2019-02-04, end date: 2019-02-15, duration: 10
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 29112018 09705 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek 18012019 Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 29112018 09705 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 29112018 09705


# 001902394126
Unscheduled inspection
Start date: 2019-01-14, end date: 2019-02-08, duration: 20
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800618723
Unscheduled inspection
Start date: 2018-08-13, end date: 2018-08-24, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 01062018 093338692018 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 01062018 093338692018 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 01062018 093338692018


# 001800576011
Unscheduled inspection
Start date: 2018-07-30, end date: 2018-08-24, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Ustanovit chto nastoyaschaya proverka provoditsya s celyu osuschestvleniya gosudarstvennogo stroitelnogo nadzora pri stroitelstve ukazannogo obekta kapitalnogo stroitelstva v svyazi s nastupleniem srokov zaversheniya rabot kotorye podlezhat proverke v sootvetstvii s utverzhdennoi programmoi provedeniya proverok pri stroitelstve obektov kapitalnogo stroitelstva


# 001800361971
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-06-01, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800361970
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-06-01, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development activities committed by the person carrying out construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800361965
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-31, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 14032018 0999 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 14032018 0999 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 14032018 0999


# 001800361959
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-05-31, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: Proverka vypolneniya ranee vydannogo proveryaemomu licu predpisaniya ot 14032018 09100 ob ustranenii vyyavlennyh rannee narushenii srok ispolneniya kotorogo istek Zadachei proverki yavlyaetsya ustanovlenie fakta ustraneniya ranee vyyavlennyh narushenii ukazannyh v predpisanii ot 14032018 09100 Predmetom nastoyaschei proverki yavlyaetsya vypolnenie predpisaniya organa gosudarstvennogo stroitelnogo nadzora ot 14032018 09100


# 001800068444
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-03-14, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 001800068433
Unscheduled inspection
Start date: 2018-02-12, end date: 2018-03-14, duration:
Authority: Eniseiskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: the implementation of state construction supervision during the construction of the specified capital construction facility in connection with the onset of completion dates of works that are subject to verification in accordance with the approved program of inspections during the construction of the capital construction facility The objectives of this audit are to prevent identify and suppress violations of the legislation on urban planning activities committed by the person carrying out the construction, including technical regulations and project documentation The subject of this audit The purpose of the audit is to verify the compliance of the work performed and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 24170701335279
Unscheduled inspection
Start date: 2017-02-01, end date: —, duration:
Authority:
Purpose of inspection:


# 24160701126123
Unscheduled inspection
Start date: 2016-11-25, end date: 2016-12-22, duration:
Authority: Gosudarstvennaya inspekciya truda v Krasnoyarskom krae
Purpose of inspection: nastoyaschaya proverka provoditsya s celyuzaschity prav i interesov rabotnikov v svyazi s rassmotreniem obrascheniya ot 11112016 7676616OB O narushenii trudovyh prav oplaty trudazadachami nastoyaschei proverki yavlyayutsyaFederalnyi gosudarstvennyi nadzor za soblyudeniem trudovogo zakonodatelstva i inyh normativnyh pravovyh aktov soderzhaschih normy trudovogo prava


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.