# 162101393828
Unscheduled inspection
Start date: 2021-11-26, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162101336112
Unscheduled inspection
Start date: 2021-11-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162100790600
Unscheduled inspection
Start date: 2021-09-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162100707754
Unscheduled inspection
Start date: 2021-09-13, end date: —, duration: 10
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of verification of the completed construction facility, in accordance with the notice received by the Inspection dated 08.09.2021 No. 9839 on the completion of the construction of the capital construction facility.
The objectives of this audit are:
prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation.
The subject of this audit is compliance with mandatory requirements and (or) requirements established by municipal legal acts;
# 162100449928
Unscheduled inspection
Start date: 2021-08-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162100353506
Unscheduled inspection
Start date: 2021-07-14, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the eliminated violations with the requirements of technical regulations, design documentation, other regulations (norms and rules), as well as to draw up an act on the elimination of violations, based on the notification received by the Inspection dated 07/09/2021 No. 7231 on the elimination of violations during construction, reconstruction of a capital construction facility, which were ordered to be eliminated within the period established by the regulation dated 05/25/2021 No. 17-12/0150-01, until 07/29/2021.
The objectives of this audit are:
prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation.
compliance with the instructions of state control (supervision) bodies, municipal control bodies
# 162100387768
Unscheduled inspection
Start date: 2021-07-27, end date: —, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 07/06/2021 case No. 17-04-2021/0036.
The objectives of this audit are:
prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation.
The subject of this audit is compliance with mandatory requirements and (or) requirements established by municipal legal acts;
# 162100387727
Unscheduled inspection
Start date: 2021-07-27, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162100212418
Unscheduled inspection
Start date: 2021-05-17, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 03/18/2021 case No. 17-04-2020/0065.
The objectives of this audit are:
prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation.
The subject of this audit is compliance with mandatory requirements and (or) requirements established by municipal legal acts;
# 162100234272
Unscheduled inspection
Start date: 2021-05-24, end date: —, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work with the requirements of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2, 3 and 3.1 of Article 52 The Urban Planning Code of the Russian Federation, in accordance with the inspection program dated 05/20/2021 case No. 17-04-2021/0036.
The objectives of this audit are:
prevention, as well as identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the work performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation.
The subject of this audit is compliance with mandatory requirements and (or) requirements established by municipal legal acts;
# 162005281001
Unscheduled inspection
Start date: 2020-12-22, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162005205066
Unscheduled inspection
Start date: 2020-11-02, end date: 2020-11-05, duration: 3
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the program of inspections from 15102020 case 170420200065the objectives of this audit are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility. The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts. acts
# 162005215310
Unscheduled inspection
Start date: 2020-11-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162005147603
Unscheduled inspection
Start date: 2020-10-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162005191844
Unscheduled inspection
Start date: 2020-10-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 162004498330
Unscheduled inspection
Start date: 2020-08-25, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 162004445907
Unscheduled inspection
Start date: 2020-07-06, end date: 2020-07-10, duration: 5
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 22062020 case 170420200037 The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts
# 162004453188
Unscheduled inspection
Start date: 2020-07-14, end date: 2020-07-17, duration: 4
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: This check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 22062020 case 170420200037 The objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts
# 162004436938
Unscheduled inspection
Start date: 2020-06-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902909142
Unscheduled inspection
Start date: 2019-08-01, end date: 2019-08-14, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and the requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of verification of the completed construction facility in accordance with the received by notification to the Inspection dated 25072019 6384 on the completion of the construction of the capital construction facility, the tasks of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts
# 161902867743
Unscheduled inspection
Start date: 2019-07-15, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161902784170
Unscheduled inspection
Start date: 2019-06-17, end date: 2019-06-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program from 30042019 case 171120180048 The tasks of this inspection are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by municipal authorities legal acts
# 161902656578
Unscheduled inspection
Start date: 2019-04-22, end date: 2019-04-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program of 28032019 case 171120180048 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts
# 161902548783
Unscheduled inspection
Start date: 2019-03-05, end date: 2019-03-07, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of design documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with the inspection program of 27022019 case 171120180048 The objectives of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility, the subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts
# 161902442179
Unscheduled inspection
Start date: 2019-01-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161902398834
Unscheduled inspection
Start date: 2019-01-09, end date: —, duration: —
Authority: —
Purpose of inspection:
# 161802324376
Unscheduled inspection
Start date: 2018-12-20, end date: 2018-12-24, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to establish compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation as well as to determine whether the completed works used in the construction of a capital construction facility, building materials, the results of such work, meet the requirements of design documentation, including energy efficiency requirements and requirements for equipment of capital construction facilities with metering devices for energy resources used, availability of a construction permit, performance the requirements of Parts 2 3 and 31 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notification received by the Inspectorate on the start of construction of a capital construction facility dated 13122018 9845, the objectives of this audit are to prevent, as well as identify and suppress violations of compliance by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of the work performed during the construction of the capital construction facility requirements of technical regulations, other regulatory legal acts and project documentation The subject of this audit is compliance with mandatory requirements and or requirements established by municipal legal acts
# 161801933233
Unscheduled inspection
Start date: 2018-10-15, end date: 2018-10-19, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials, the results of such work, with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 02102018 case 171120170038, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts
# 161800308756
Unscheduled inspection
Start date: 2018-04-23, end date: 2018-04-27, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials and the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 29/122017 case 171120170038, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts
# 161800226202
Unscheduled inspection
Start date: 2018-03-26, end date: 2018-03-30, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the construction of a capital construction facility with building materials and the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 29/122017 case 171120170038, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts
# 161800025551
Unscheduled inspection
Start date: 2018-01-31, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 161800006310
Unscheduled inspection
Start date: 2018-01-19, end date: 2018-01-23, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine whether the completed works used in the construction of an object of capital construction of building materials, the results of such work, meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in accordance with according to the inspection program dated 29/122017 case 171120170038, the objectives of this inspection are to prevent, identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of a contract with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of a capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by municipal legal acts
# 16170802902639
Unscheduled inspection
Start date: 2017-12-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 16170802991218
Unscheduled inspection
Start date: 2017-12-16, end date: 2017-12-20, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of verification of the completed construction facility in accordance with with the notification received by the Inspection dated 08122017 10229 on the completion of the construction of the capital construction facility, the tasks of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility mandatory requirements and or requirements established by municipal legal acts
# 16170701767402
Unscheduled inspection
Start date: 2017-07-06, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701817915
Unscheduled inspection
Start date: 2017-07-24, end date: 2017-07-28, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works used in the process of construction reconstruction of an object of capital construction of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used, the availability of a construction permit, compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation in in accordance with the inspection program dated 18052017 case 171120170015, the tasks of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this inspection is compliance with mandatory requirements and or requirements established by the municipal legal acts
# 16170701733327
Unscheduled inspection
Start date: 2017-06-23, end date: —, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection:
# 16170701639982
Unscheduled inspection
Start date: 2017-05-24, end date: 2017-05-26, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to establish compliance with the requirements of part 5 of Article 52 of the Urban Planning Code of the Russian Federation on the basis of the notification received by the Inspection on the start of construction reconstruction of the capital construction facility dated 18052017 3787the tasks of this inspection are prevention as well as detection and suppression of violations of conformity committed by the developer customer by a person carrying out construction on the basis of an agreement with the developer or customer performed during the construction of the facility capital construction works to the requirements of technical regulations, other regulatory legal acts and project documentation6 The subject of this audit is compliance with mandatory requirements
# 16160701113748
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-11-11, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the performed works applied in the process of construction reconstruction of the capital construction facility of building materials and the results of such works with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used on the basis of the notification received by the Inspection dated 18102016 9237 on the completion dates of works that are subject to verification at the capital construction facility, the tasks of this audit are to prevent, as well as to identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements
# 16160701143828
Unscheduled inspection
Start date: 2016-11-28, end date: 2016-12-02, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this check is carried out in order to determine the compliance of the completed works, the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used at the completion stage, as well as for the purpose of drawing up an act of verification of the completed construction facility in in accordance with the notification received by the Inspection dated 16112016 10168 on the completion of construction reconstruction at the capital construction facility, the tasks of this inspection are to prevent, as well as identify and suppress violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility with the requirements of technical regulations, other regulatory legal acts and project documentation. The verification is compliance with mandatory requirements
# 16160700886902
Unscheduled inspection
Start date: 2016-09-15, end date: 2016-09-15, duration: —
Authority: Inspekciya gosudarstvennogo stroitelnogo nadzora Respubliki Tatarstan
Purpose of inspection: this inspection is carried out in order to determine the compliance of the work performed with the construction materials used in the process of construction reconstruction of the capital construction facility, the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping capital construction facilities with metering devices for energy resources used on the basis of notification received by the Inspection from 08092016 7836 on the completion dates of works that are subject to verification at the capital construction facility, the tasks of this audit are the prevention, as well as the identification and suppression of violations committed by the developer, the customer, the person carrying out construction on the basis of an agreement with the developer or the customer, of compliance with the requirements of technical regulations, other regulatory legal acts and project documentation performed during the construction of the capital construction facility. The subject of this audit is compliance with mandatory requirements