# 661904081642
Unscheduled inspection
Start date: 2019-12-09, end date: 2019-12-27, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 291701154164 of 15022019 Task implementation of state construction supervision Subject verification of compliance of the work and construction materials used in the construction of the capital construction facility "Warehouse building II stage of construction from the structure of the facility "Warehouse building with ABC premises" located at the address Sverdlovsk region g Berezovsky ul Uralskaya 142 b the results of such work to building standards and safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities
# 661903735329
Unscheduled inspection
Start date: 2019-10-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902940061
Unscheduled inspection
Start date: 2019-08-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902849907
Unscheduled inspection
Start date: 2019-07-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661902616017
Unscheduled inspection
Start date: 2019-04-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 661800470693
Unscheduled inspection
Start date: 2018-06-15, end date: 2018-07-12, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 292201335156 dated 19012018 Verification on the basis of the notice of completion of the capital construction facility vh 29018223354 dated 09062018 in accordance with the inspection program Task implementation of state construction supervision Subject verification of compliance with the execution of works and construction materials used in the construction of the capital construction facility ""Warehouse building with ABC premises stage 1 ROM 1 gas block-modular automated hot water boiler house according to ROM 4 with a supply gas pipeline transformer substation according to ROM 6 stormwater drainage storage tanks according to ROM 81 82 from the structure of the facility "Warehouse building with ABC premises" located at the address Sverdlovsk region Berezovsky Uralskaya str 142 b the results of such work to building codes and safety rules and state standards as well as requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities
# 661800427894
Unscheduled inspection
Start date: 2018-06-04, end date: 2018-06-09, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 292201335156 dated 19012018 Task implementation of state construction supervision Subject verification of compliance with the execution of works and construction materials used in the construction of the capital construction facility "Warehouse building with ABC premises stage 1 according to ROM 1 gas block modular automated hot water boiler house according to ROM 4 with a supply gas pipeline transformer substation according to ROM 6 storage tanks of storm sewer drains according to ROM 81 82 from the structure of the object "Warehouse building with ABC premises" located at the address Sverdlovsk region, Berezovsky Uralskaya str. 142 b the results of such work to building codes and rules, safety rules and state standards, as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of facilities capital construction
# 661800260153
Unscheduled inspection
Start date: 2018-04-03, end date: 2018-04-16, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: Purpose implementation of the inspection program 292201335156 dated 19012018 Task implementation of state construction supervision Subject verification of compliance of work and construction materials used in the construction of a capital construction facility ""Warehouse building with ABC premises stage 1 according to ROM 1 control checkpoint according to ROM 3 gas block modular automated hot water boiler house according to ROM 4 with a supply gas pipeline transformer substation according to ROM 6 stormwater drainage storage tanks according to ROM 81 82 diesel generator set according to ROM 12 from the structure of the object "Warehouse building with ABC premises" located at the address Sverdlovsk region, Berezovsky Uralskaya str. 142 b the results of such work to building codes and safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts acts of federal executive authorities that are subject to mandatory execution during the construction of capital construction facilities
# 66170701666229
Unscheduled inspection
Start date: 2017-06-01, end date: 2017-06-15, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: implementation of the inspection program 291701154162 dated 27012017, the tasks of which are to carry out state construction supervision. The subject of this inspection is to verify the compliance of the work and construction materials used in the construction of the capital construction facility "Warehouse building 2 stage of construction from the structure of the facility "Warehouse building with ABC premises" located at the address Sverdlovsk region, Berezovsky ul. Uralskaya 142 b the results of such construction norms and rules safety rules and state standards as well as the requirements of other regulatory legal acts of the Russian Federation and regulatory legal acts of federal executive authorities subject to mandatory execution during the construction of capital construction facilities
# 66170701666187
Unscheduled inspection
Start date: 2017-06-01, end date: —, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection:
# 66170701498102
Unscheduled inspection
Start date: 2017-04-03, end date: —, duration: —
Authority: —
Purpose of inspection:
# 66170701498124
Unscheduled inspection
Start date: 2017-04-03, end date: 2017-04-14, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program dated January 27, 2017 291701154162 The objectives of this inspection are the implementation of regional state construction supervision The subject of this inspection is to verify the compliance of the work and applicable building materials during the construction of the capital construction facility "Warehouse building 2 stage of construction from the structure of the facility "Warehouse building with ABC premises"" located at address Sverdlovsk region, Berezovsky Uralskaya str., house 142 b the results of such work meet the requirements of technical regulations, sanitary and epidemiological rules and regulations, safety rules and state standards of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code the Code of the Russian Federation
# 66170701355176
Unscheduled inspection
Start date: 2017-02-06, end date: 2017-02-17, duration: —
Authority: Departament gosudarstvennogo zhilischnogo i stroitelnogo nadzora Sverdlovskoi oblasti
Purpose of inspection: This inspection is carried out in order to implement the inspection program 292201335154 dated 27012017. The purpose of this inspection is to carry out regional state construction supervision. The purpose of this inspection is to verify the compliance of work and applicable building materials during the construction of a capital construction facility ""Warehouse building with ABC premises 1 stage according to ROM 1 checkpoint according to ROM 3 gas block modular automated hot water boiler house according to ROM 4 transformer substation according to ROM 6 stormwater drainage storage tanks according to ROM 81 82 diesel generator set according to ROM 12 from the structure of the object "Warehouse building with ABC premises" located at the address Sverdlovsk region g Berezovsky Uralskaya str 142 b the results of such work meet the requirements of technical regulations fire safety requirements safety rules and state standards of project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for energy resources used, as well as the availability of a construction permit and compliance with the requirements of parts 2 and 3 of Article 52 of the Urban Planning Code of the Russian Federation