Found 33 inspections:

# 00170701885606
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-08-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is1 compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal person4 verification of the actual elimination of the previously issued prescription


# 00170701885604
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-08-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is1 compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal person4 verification of the actual elimination of the previously issued prescription


# 142100218248
Unscheduled inspection
Start date: 2021-05-20, end date: 2021-05-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: verification of the actual elimination of previously identified violations during the construction of a capital construction facility, prescribed for elimination by Regulation No. 04-08-44-21 dated 03/02/2021, prevention, detection and suppression of violations of urban planning legislation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer (hereinafter referred to as the contractor), including project documentation, compliance with mandatory requirements and (or) requirements established by municipal legal acts; compliance of information contained in the notification of the commencement of certain types of entrepreneurial activity with mandatory requirements; compliance of information contained in the application and documents of a legal entity or individual entrepreneur on granting legal status, special permission (license) for the right to carry out certain types of activities or permits (approvals) for other legally significant actions, if an appropriate unscheduled audit of the legal entity is carried out.,


# 142105305667
Unscheduled inspection
Start date: 2021-02-16, end date: 2021-03-02, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha (YAkutiya)
Purpose of inspection: inspections in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha (Yakutia), on May 29, 2020, compliance with the mandatory requirements in the field of construction and applied building materials (products), the established procedure for construction and reconstruction of the facility during the construction of the capital construction facility. capital construction


# 142005226203
Unscheduled inspection
Start date: 2020-11-17, end date: 2020-11-30, duration: 10
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The subject of the inspection is checked in accordance with the inspection program approved by the head of the Department of State Construction and Housing Supervision of the Republic of Sakha Yakutia on September 09, 2020. Compliance with the mandatory requirements in the field of construction and applied building materials products of the established procedure for the construction and reconstruction of the capital construction facility by the developer and the technical customer. during the construction of the reconstruction of the capital construction facility as well as the results of such work, the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of the Urban Planning Code of the Russian Federation, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of the Urban Planning Code of the Russian Federation and or the information model if the formation and maintenance of the requirements of the information model are mandatory in accordance with the requirements of the Urban Planning Code of the Russian Federation, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for energy resources used 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 31 of Article 52 of the Urban Planning Code of the Russian Federation


# 142004457550
Unscheduled inspection
Start date: 2020-07-13, end date: —, duration:
Authority:
Purpose of inspection:


# 141902758963
Unscheduled inspection
Start date: 2019-05-23, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 141802089960
Unscheduled inspection
Start date: 2018-11-13, end date: 2018-12-28, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: verification of the completed capital construction facility for a compliance of the constructed capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation b elimination by the developer by the technical customer by the person carrying out construction of all violations of compliance of the performed works with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation in the execution of executive documentation related to the performance of all construction work as well as the use of building materials and products According to the notice of completion of construction of the Department of Gosstroizhilnadzor of the Russian Federation exx bn dated 07112018 entry 16072 dated 07112018 and a request for an extension of the deadline


# 141802063716
Unscheduled inspection
Start date: 2018-11-13, end date: 2018-11-20, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor 1 compliance of the work and the construction materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements for energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 the availability of a construction permit 3 the fulfillment of the requirements established by parts 2 3 and 31 6 of Article 52 of the Urban Planning Code of the Russian Federation According to the prescription and notification of the elimination of the prescription


# 141800685634
Unscheduled inspection
Start date: 2018-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 141800568138
Unscheduled inspection
Start date: 2018-07-23, end date: —, duration:
Authority:
Purpose of inspection:


# 141800558195
Unscheduled inspection
Start date: 2018-07-23, end date: 2018-08-03, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 6 of Article 52 of the Urban Planning Code of the Russian Federation According to the inspection program


# 141800424860
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by parts 2 3 and 31 6 of Article 52 of the Urban Planning Code of the Russian Federation According to the inspection program


# 141800424858
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention identification and suppression of violations of the legislation on urban planning activities, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, 1 compliance of the work and construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements established by Parts 2 3 and 31 6 of Article 52 of the Urban Planning Code of the Russian Federation As prescribed


# 141800403819
Unscheduled inspection
Start date: 2018-05-22, end date: 2018-06-19, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The purpose is to identify and eliminate violations of the requirements of the legislation on participation in the shared construction of multi-family residential buildings and or other real estate objects in relation to Legion GRK LLC based on the article "88 families of Vilyuysk were left without money and apartments, while the authorities successfully reported" posted on 15052018 in the SAKHALIFERU online publication. The purpose of this audit is to monitor compliance with the developer of the provisions of the Federal Law of 30122004 214FZ "On participation in the shared construction of apartment buildings and other real estate objects and on Amendments to Certain Legislative Acts of the Russian Federation" The subject of verification is compliance by the person attracting citizens' funds for the construction of mandatory requirements established by the Federal Law of 30122004 214FZ "On participation in the shared construction of apartment buildings and other real estate objects and amendments to certain legislative acts of the Russian Federation" and other regulatory legal acts of the Russian Federation adopted in accordance with it


# 141800240270
Unscheduled inspection
Start date: 2018-03-28, end date: —, duration:
Authority:
Purpose of inspection:


# 14170802954790
Unscheduled inspection
Start date: 2017-12-11, end date: 2018-01-15, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: the objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and project documentation, committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is 1 compliance of the work and the construction materials used in the construction process of reconstruction of the capital construction facility and the results of such work meet the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including certificates on admission to work on the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14170802670153
Unscheduled inspection
Start date: 2017-10-13, end date: 2017-11-10, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: verification of the completed capital construction facility for a compliance of the constructed capital construction facility with the requirements of technical regulations norms and rules of other regulatory legal acts and project documentation b elimination by the developer by the technical customer by the person carrying out construction of all violations of compliance of the completed works with the requirements of technical regulations norms and rules of other regulatory legal acts and design documentation in the execution of executive documentation related to the performance of all construction works as well as the use of building materials and products Upon notification of completion of construction by the Department of Gosstroyzhilnadzor of the Russian Federation


# 14170802628741
Unscheduled inspection
Start date: 2017-10-13, end date: —, duration:
Authority:
Purpose of inspection:


# 00170701885606
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-08-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is1 compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal person4 verification of the actual elimination of the previously issued prescription


# 00170701885604
Unscheduled inspection
Start date: 2017-08-15, end date: 2017-08-21, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation, including technical regulations and project documentation, committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is1 compliance of the work performed and the building materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations project documentation, including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in in the case of involvement by the developer or the technical customer on the basis of a contract of an individual or a legal person4 verification of the actual elimination of the previously issued prescription


# 14170701846602
Unscheduled inspection
Start date: 2017-08-04, end date: —, duration:
Authority:
Purpose of inspection:


# 14170701770908
Unscheduled inspection
Start date: 2017-07-06, end date: 2017-07-12, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of urban planning legislation committed by the developer, the technical customer, as well as by the person carrying out construction on the basis of a contract with the developer or the customer, hereinafter referred to as the contractor, including technical regulations and project documentation1 compliance of the work performed and the building materials used during the construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations and project documentation in including energy efficiency requirements and requirements for equipping a capital construction facility with metering devices for used energy resources 2 availability of a construction permit 3compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction and reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or by a technical customer on the basis of an agreement between an individual or a legal entity, as prescribed by


# 14170701563477
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14170701563454
Unscheduled inspection
Start date: 2017-05-02, end date: —, duration:
Authority:
Purpose of inspection:


# 14170701477914
Unscheduled inspection
Start date: 2017-03-28, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14170701347880
Unscheduled inspection
Start date: 2017-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 14170701347858
Unscheduled inspection
Start date: 2017-02-03, end date: —, duration:
Authority:
Purpose of inspection:


# 14170701339952
Unscheduled inspection
Start date: 2017-01-31, end date: —, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection:


# 14170701339928
Unscheduled inspection
Start date: 2017-01-31, end date: 2017-02-13, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: The objectives of this audit are to prevent identify and suppress violations of the legislation on urban development, including technical regulations and design documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, the subject of this audit is the conformity of the work and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such the requirements of the technical regulations of the project documentation, including the requirements of energy efficiency and the requirements for equipping the capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work for the organization of construction in case of involvement by the developer or technical customer on the basis of a contract of an individual or legal entity


# 14160701236555
Unscheduled inspection
Start date: 2016-11-24, end date: 2016-12-05, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and project documentation1 compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or by a technical customer on the basis of an agreement between an individual or a legal entity on the verification program


# 14160700477309
Unscheduled inspection
Start date: 2016-09-20, end date: 2016-09-29, duration:
Authority: Upravlenie gosudarstvennogo stroitelnogo i zhilischnogo nadzora Respubliki Saha YAkutiya
Purpose of inspection: prevention detection and suppression of violations of the legislation on urban development, including technical regulations and project documentation1 committed by the developer, the technical customer, as well as the person carrying out construction on the basis of an agreement with the developer or the customer, hereinafter referred to as the contractor, of violations of the legislation on urban development, including technical regulations and project documentation1 compliance of the work and construction materials used in the construction process of reconstruction of the capital construction facility, as well as the results of such work with the requirements of technical regulations of project documentation in including the requirements of energy efficiency and the requirements for equipping a capital construction facility with metering devices for used energy resources2 availability of a construction permit 3 compliance with the requirements of parts 236 of Article 52 of the Urban Planning Code of the Russian Federation availability of a certificate of admission to construction reconstruction works that affect the safety of capital construction facilities, including a certificate of admission to work on the organization of construction in case of involvement by the developer or by a technical customer on the basis of an agreement between an individual or a legal entity on the verification program


# 14160601769957
Unscheduled inspection
Start date: 2016-08-01, end date: —, duration:
Authority:
Purpose of inspection:


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.