Found 68 inspections:

# 772004486977
Unscheduled inspection
Start date: 2020-08-19, end date: 2020-09-08, duration: 15
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the audit program The tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development by the audited person The subject of verification is the compliance of the work and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the design documentation, including the requirements of energy efficiency and requirements for the equipment of the capital construction facility with metering devices for used energy resources


# 771904102536
Unscheduled inspection
Start date: 2019-12-17, end date: 2019-12-26, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the verification of compliance with the requirements of the task of the audit, to prevent the identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 771903937833
Unscheduled inspection
Start date: 2019-11-08, end date: 2019-11-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with the implementation of the verification program verification tasks prevention identification and suppression of violations of the requirements of the design documentation of the legislation on urban planning activity by the audited person, subject to verification of compliance of the work and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the design documentation, including energy efficiency requirements and equipment requirements of the facility capital construction with metering devices for energy resources used


# 771903998006
Unscheduled inspection
Start date: 2019-11-19, end date: —, duration:
Authority:
Purpose of inspection:


# 771903799575
Unscheduled inspection
Start date: 2019-10-07, end date: 2019-10-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The objectives of the audit are to carry out control measures in connection with checking the fulfillment of the prescriptionthe tasks of the audit are to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The purpose of the audit is to verify the elimination of violations specified in the prescription issued by Mosgosstroynadzor


# 771903609679
Unscheduled inspection
Start date: 2019-09-18, end date: 2019-09-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The purpose of the audit is to carry out control measures in connection with the receipt of a notification from the developer of the customer of the audit task to prevent identify and suppress violations of the requirements of the design documentation of the legislation on urban development activity by the audited person. The subject of the audit is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77190803467938
Unscheduled inspection
Start date: 2019-08-01, end date: —, duration:
Authority:
Purpose of inspection:


# 77190803455128
Unscheduled inspection
Start date: 2019-07-10, end date: 2019-07-29, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803276113
Unscheduled inspection
Start date: 2018-11-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803256603
Unscheduled inspection
Start date: 2018-10-25, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803250593
Unscheduled inspection
Start date: 2018-10-12, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803223521
Unscheduled inspection
Start date: 2018-09-10, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803223409
Unscheduled inspection
Start date: 2018-09-11, end date: 2018-09-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803212115
Unscheduled inspection
Start date: 2018-09-04, end date: 2018-09-24, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803233017
Unscheduled inspection
Start date: 2018-09-21, end date: 2018-10-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803200690
Unscheduled inspection
Start date: 2018-08-14, end date: 2018-08-17, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803185090
Unscheduled inspection
Start date: 2018-07-17, end date: 2018-08-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803172673
Unscheduled inspection
Start date: 2018-07-05, end date: 2018-07-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803187485
Unscheduled inspection
Start date: 2018-07-24, end date: 2018-07-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803154930
Unscheduled inspection
Start date: 2018-06-06, end date: 2018-06-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803165310
Unscheduled inspection
Start date: 2018-06-21, end date: 2018-06-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803167613
Unscheduled inspection
Start date: 2018-06-25, end date: 2018-07-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803141534
Unscheduled inspection
Start date: 2018-05-18, end date: 2018-05-25, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803137778
Unscheduled inspection
Start date: 2018-05-14, end date: 2018-06-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803119173
Unscheduled inspection
Start date: 2018-04-09, end date: 2018-04-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803113987
Unscheduled inspection
Start date: 2018-04-02, end date: 2018-04-06, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803103910
Unscheduled inspection
Start date: 2018-03-19, end date: 2018-04-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803093986
Unscheduled inspection
Start date: 2018-03-05, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77180803087011
Unscheduled inspection
Start date: 2018-02-15, end date: 2018-02-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803087287
Unscheduled inspection
Start date: 2018-02-09, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803089941
Unscheduled inspection
Start date: 2018-02-27, end date: 2018-03-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803087282
Unscheduled inspection
Start date: 2018-02-07, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803081907
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-01-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803065800
Unscheduled inspection
Start date: 2018-01-17, end date: 2018-01-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77180803060304
Unscheduled inspection
Start date: 2018-01-17, end date: —, duration:
Authority:
Purpose of inspection:


# 77180803080761
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-01-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77180803070567
Unscheduled inspection
Start date: 2018-01-26, end date: 2018-01-30, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170802932912
Unscheduled inspection
Start date: 2017-12-04, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170802989108
Unscheduled inspection
Start date: 2017-12-12, end date: 2017-12-15, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used, verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802990296
Unscheduled inspection
Start date: 2017-12-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802898584
Unscheduled inspection
Start date: 2017-11-27, end date: 2017-12-08, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802813902
Unscheduled inspection
Start date: 2017-11-02, end date: 2017-11-03, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802898061
Unscheduled inspection
Start date: 2017-11-22, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802898582
Unscheduled inspection
Start date: 2017-11-23, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802253232
Unscheduled inspection
Start date: 2017-09-12, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802316262
Unscheduled inspection
Start date: 2017-09-13, end date: —, duration:
Authority:
Purpose of inspection:


# 77170802206269
Unscheduled inspection
Start date: 2017-09-11, end date: 2017-09-13, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170802506135
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration:
Authority:
Purpose of inspection:


# 77170801971813
Unscheduled inspection
Start date: 2017-09-01, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77170801916908
Unscheduled inspection
Start date: 2017-08-17, end date: 2017-08-18, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701810439
Unscheduled inspection
Start date: 2017-07-17, end date: 2017-07-19, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701795449
Unscheduled inspection
Start date: 2017-07-13, end date: 2017-07-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701713194
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-06-14, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701569541
Unscheduled inspection
Start date: 2017-05-16, end date: 2017-05-31, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701614613
Unscheduled inspection
Start date: 2017-05-08, end date: 2017-06-02, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701545420
Unscheduled inspection
Start date: 2017-04-14, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701585507
Unscheduled inspection
Start date: 2017-04-28, end date: —, duration:
Authority:
Purpose of inspection:


# 77170701399751
Unscheduled inspection
Start date: 2017-02-20, end date: 2017-02-21, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77170701305199
Unscheduled inspection
Start date: 2017-01-17, end date: 2017-01-20, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the instruction issued by Mosgosstroynadzor, compliance of the work and construction materials used in the construction process of the reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77170701324687
Unscheduled inspection
Start date: 2017-01-24, end date: 2017-02-10, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701273216
Unscheduled inspection
Start date: 2016-12-27, end date: 2016-12-27, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: verification of the elimination of violations specified in the order issued by Mosgosstroynadzor


# 77160701160028
Unscheduled inspection
Start date: 2016-11-30, end date: —, duration:
Authority:
Purpose of inspection:


# 77160701101938
Unscheduled inspection
Start date: 2016-11-10, end date: 2016-12-09, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: compliance of the work and construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation, including energy efficiency requirements and requirements for equipping the capital construction facility with metering devices for energy resources used


# 77160701068632
Unscheduled inspection
Start date: 2016-11-01, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77160700990082
Unscheduled inspection
Start date: 2016-10-06, end date: —, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection:


# 77160700336393
Unscheduled inspection
Start date: 2016-09-08, end date: —, duration:
Authority:
Purpose of inspection:


# 77160700065375
Unscheduled inspection
Start date: 2016-08-29, end date: 2016-09-16, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The subject of this audit is the compliance of the work performed and the construction materials used during the construction reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for energy resources used, the compliance of the capital construction facility with the requirements of the technical regulations and project documentation based on the approved verification program. Inspections are aimed at preventing detecting and suppressing violations of technical regulations and project documentation committed by the person being checked.


# 77160700083620
Unscheduled inspection
Start date: 2016-08-30, end date: 2016-09-01, duration:
Authority: Komitet gosudarstvennogo stroitelnogo nadzora goroda Moskvy
Purpose of inspection: The inspection is carried out in order to eliminate violations specified in the order issued by Mosgosstroynadzor on the basis of a notification received from the developer the customer or the person carrying out the construction on the elimination of violations. The objectives of this inspection are to prevent identify and suppress violations of technical regulations and project documentation committed by the person being checked. The subject of this inspection is to verify the elimination of violations specified in the order issued by Mosgosstroynadzor 707116 dated 18072016


Information about inspections

This section displays information about planned and carried out inspections of control (supervision) bodies in accordance with Federal Law No. 294-FZ. Detailed information about the inspection can be obtained from the Unified Register of Inspections of the Prosecutor General's Office.