# 00170802986473
Unscheduled inspection
Start date: 2017-12-26, end date: 2017-12-26, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to issue a permit for the commissioning of power plants on the basis of an application from the head of the department of the customer of the builder of JSC YUU KZHSI ex 072124127 from 04122017 vh 417210 from 05122017 The objectives of this inspection are to carry out measures to control the technical condition and safe operation of the power supply of a residential building page 14 at the address Chelyabinsk Krasnopolskaya site microdistrict 50 The subject of this inspection is the compliance of the information contained in the application and documents of a legal entity or an individual entrepreneur for granting the legal status of a special permit license for the right to carry out certain types of activities or permit approval for the implementation of legally significant actions if the conduct of an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements as well as data on these legal entities and individual entrepreneurs contained in the unified state register of legal entities the unified state register of individual entrepreneurs and other federal information resources
# 00170803008963
Unscheduled inspection
Start date: 2017-12-22, end date: 2017-12-22, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring of the technical condition and safe operation of thermal power plants and heating networks
# 00170701820716
Unscheduled inspection
Start date: 2017-07-20, end date: 2017-07-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 00170701716614
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-06-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 742201536086
Unscheduled inspection
Start date: 2022-01-18, end date: 2022-01-24, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the organization of the construction site, the implementation of measures for the deconservation of the facility, the installation of a monolithic grillage and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements are not They are distributed) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742201536102
Unscheduled inspection
Start date: 2022-01-19, end date: 2022-01-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the organization of the construction site, the implementation of measures for the deconservation of the facility, the installation of a monolithic grillage and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements are not They are distributed) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101395163
Unscheduled inspection
Start date: 2021-12-02, end date: 2021-12-15, duration: 10
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on dynamic testing of piles (after completion of work), work on the installation of a pile field (during the production of work) and the construction materials used during construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities to which the requirements of energy efficiency do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742201466456
Unscheduled inspection
Start date: 2021-12-20, end date: 2022-02-07, duration: 19
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101453713
Unscheduled inspection
Start date: 2021-12-15, end date: 2022-01-19, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101408323
Unscheduled inspection
Start date: 2021-12-13, end date: 2021-12-17, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of 3-5 floors, roofing, window openings and building materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects to which energy efficiency requirements do not apply) and requirements for the equipment of the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101312780
Unscheduled inspection
Start date: 2021-11-12, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101381374
Unscheduled inspection
Start date: 2021-11-30, end date: 2021-12-27, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101350766
Unscheduled inspection
Start date: 2021-11-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101357269
Unscheduled inspection
Start date: 2021-11-22, end date: 2021-12-17, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101357279
Unscheduled inspection
Start date: 2021-11-22, end date: 2021-12-17, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101325326
Unscheduled inspection
Start date: 2021-11-19, end date: 2021-11-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on laying low-current linear networks, laying power supply systems, smoke removal systems, laying water supply and sewerage, ventilation, external engineering networks and building materials used during construction, reconstruction of a capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code The Code of Project Documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) the information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of facilities capital construction, which are not subject to energy efficiency requirements) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101326797
Unscheduled inspection
Start date: 2021-11-16, end date: 2021-11-22, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on electrical installation (when fully ready), plumbing work (when fully ready) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements efficiency does not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101298218
Unscheduled inspection
Start date: 2021-11-15, end date: 2021-11-19, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the grillage, installation of the basement, installation of the 1st and 2nd floors and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742101176676
Unscheduled inspection
Start date: 2021-10-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100957045
Unscheduled inspection
Start date: 2021-10-01, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101215271
Unscheduled inspection
Start date: 2021-10-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742101221166
Unscheduled inspection
Start date: 2021-10-19, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100757119
Unscheduled inspection
Start date: 2021-09-17, end date: 2021-10-14, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100757107
Unscheduled inspection
Start date: 2021-09-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100928857
Unscheduled inspection
Start date: 2021-09-28, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100599966
Unscheduled inspection
Start date: 2021-09-06, end date: 2021-09-10, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the parapet, roofing panels, waterproofing of the roof after the actual completion of work, installation of window blocks (before the installation of slopes and window sills) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 Article 48 of this Code of project documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100531295
Unscheduled inspection
Start date: 2021-09-07, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100841691
Unscheduled inspection
Start date: 2021-09-27, end date: 2021-10-01, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the waterproofing of the roof (after the actual completion of the work), installation of window blocks (before the installation of slopes and window sills) and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code project documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction facilities buildings that are not subject to energy efficiency requirements) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100753682
Unscheduled inspection
Start date: 2021-09-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100447033
Unscheduled inspection
Start date: 2021-08-16, end date: 2021-08-20, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the organization of the construction site, the foundation (in the course of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100438939
Unscheduled inspection
Start date: 2021-08-12, end date: 2021-08-18, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work performed to verify the actual condition of the capital construction facility and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Articles 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and equipment requirements of the capital construction facility construction of metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100438961
Unscheduled inspection
Start date: 2021-08-13, end date: 2021-08-19, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Checking the actual condition of the object. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100531242
Unscheduled inspection
Start date: 2021-08-30, end date: 2021-09-03, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the installation of load-bearing and enclosing structures of the basement, 3rd - 5th floors and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements efficiency does not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100549299
Unscheduled inspection
Start date: 2021-08-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100521030
Unscheduled inspection
Start date: 2021-08-31, end date: 2021-09-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance with the installation of internal engineering networks (completed stage of work), the installation of external engineering networks (completed stage of work), the installation of finishing works (completed stage of work), the installation of the facade of the building (completed stage of work), compliance with measures to ensure access for low-mobility groups of the population, compliance with measures to ensure fire safety, compliance with measures for sanitary and epidemiological safety, landscaping and construction materials used in the construction process, reconstruction of a capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account changes made to the project documentation in accordance with parts 3.8 and 3.9 Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100340246
Unscheduled inspection
Start date: 2021-07-12, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100372317
Unscheduled inspection
Start date: 2021-07-26, end date: 2021-07-30, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of work on the installation of load-bearing and enclosing structures of 6-10 floors, installation of load-bearing and enclosing structures of the technical floor and building materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (subject to changes included in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements efficiency does not apply) and the requirements for equipping the capital construction facility with metering devices for the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100345614
Unscheduled inspection
Start date: 2021-07-21, end date: 2021-07-27, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the underground part and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects to which energy efficiency requirements do not apply) and requirements for equipping a capital construction facility with metering devices the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100265051
Unscheduled inspection
Start date: 2021-06-30, end date: 2021-07-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of a monolithic grillage and the construction materials used in the construction process, reconstruction of a capital construction facility, as well as the results of such work with the requirements of the design documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the design documentation in accordance with parts 3.8 and 3.9 Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices the energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100242478
Unscheduled inspection
Start date: 2021-06-07, end date: 2021-06-11, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of supporting structures of the ground floor, installation of supporting and enclosing structures of 1-5 floors, prior to the installation of supporting and enclosing structures of the 5th floor and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 Article 48 of this Code of project documentation (taking into account the changes made to the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, which are not subject to energy efficiency requirements) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100194505
Unscheduled inspection
Start date: 2021-05-19, end date: 2021-05-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the technical floor (completed stage of work), installation of the roof (completed stage of work), installation of internal engineering networks (in the course of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of project documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including the requirements of the energy efficiency (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100194516
Unscheduled inspection
Start date: 2021-05-19, end date: 2021-05-25, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of the technical floor (completed stage of work), installation of the roof (completed stage of work), installation of internal engineering networks (in the course of work) and the construction materials used during construction, reconstruction of the capital construction facility, as well as the results of such work with the requirements approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code of project documentation (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including the requirements of the energy efficiency (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping a capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100194880
Unscheduled inspection
Start date: 2021-05-20, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742100161182
Unscheduled inspection
Start date: 2021-04-28, end date: 2021-05-06, duration: 6
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the organization of the construction site, the foundation pit, the work on the pile foundation and the construction materials used in the construction process, reconstruction of the capital construction facility, as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made in the project documentation in accordance with Parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects for which energy efficiency requirements are not They are distributed) and the requirements for equipping the capital construction facility with metering devices for used energy resources. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742100097478
Unscheduled inspection
Start date: 2021-03-31, end date: 2021-04-06, duration: 5
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Compliance of the work on the installation of foundations, waterproofing of foundations before backfilling the sinuses of the pit. and the construction materials used in the process of construction, reconstruction of the capital construction facility, as well as the results of such work to the requirements of the project documentation approved in accordance with Parts 15, 15.2 and 15.3 of Article 48 of this Code (taking into account the changes made to the project documentation in accordance with parts 3.8 and 3.9 of Article 49 of this Code) and (or) an information model (if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code), including energy efficiency requirements (with the exception of capital construction projects, to which energy efficiency requirements do not apply) and the requirements for equipping the capital construction facility with metering devices for energy resources used. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742105354016
Unscheduled inspection
Start date: 2021-02-17, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742100013002
Unscheduled inspection
Start date: 2021-02-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742105335671
Unscheduled inspection
Start date: 2021-02-02, end date: 2021-03-01, duration: 19
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1. Inspection of the completed construction site. 2. Availability of a building permit. 3. Compliance with the requirements of Parts 2.3 and 3.1 of Article 52 of the Urban Planning Code of the Russian Federation.
# 742105295525
Unscheduled inspection
Start date: 2021-01-14, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742105295530
Unscheduled inspection
Start date: 2021-01-14, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742105314525
Unscheduled inspection
Start date: 2021-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005251874
Unscheduled inspection
Start date: 2020-12-15, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005239175
Unscheduled inspection
Start date: 2020-11-26, end date: 2020-12-23, duration: 20
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of translucent structures the completed stage of the installation of internal engineering networks the interior decoration of apartments landscaping the completed stage and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Verification completed construction of the facility 3 Availability of a construction permit 4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742005208196
Unscheduled inspection
Start date: 2020-11-10, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005208189
Unscheduled inspection
Start date: 2020-11-10, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005177832
Unscheduled inspection
Start date: 2020-10-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005177835
Unscheduled inspection
Start date: 2020-10-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742005138643
Unscheduled inspection
Start date: 2020-10-06, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742005195658
Unscheduled inspection
Start date: 2020-10-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004489912
Unscheduled inspection
Start date: 2020-08-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004485656
Unscheduled inspection
Start date: 2020-08-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004483788
Unscheduled inspection
Start date: 2020-08-18, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004450487
Unscheduled inspection
Start date: 2020-07-28, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004435374
Unscheduled inspection
Start date: 2020-06-18, end date: 2020-07-15, duration: 20
Authority: Gosudarstvennaya inspekciya truda v CHelyabinskoi oblasti
Purpose of inspection: implementation of federal state supervision over compliance with labor legislation and other regulatory legal acts containing labor law norms in connection with the received appeal of an employee of JSC YUU KZHSI on violation of labor rights bx 747352120OB bx 747347720OB as well as a reasoned representation of an official
# 742004419347
Unscheduled inspection
Start date: 2020-05-29, end date: 2020-06-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of 2-3 floors of the building and the construction materials used in the process of construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping the capital construction facility with metering devices for energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004412062
Unscheduled inspection
Start date: 2020-05-28, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 742004383948
Unscheduled inspection
Start date: 2020-03-31, end date: 2020-04-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the 2nd and 3rd floors of the building and the construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with Parts 15 152 and 153 of Article 48 of this Code, taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements for equipping a capital construction facility with metering devices for used energy resources 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 742004319666
Unscheduled inspection
Start date: 2020-03-10, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004222928
Unscheduled inspection
Start date: 2020-01-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 742004202706
Unscheduled inspection
Start date: 2020-01-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741904043476
Unscheduled inspection
Start date: 2019-12-05, end date: 2020-01-09, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the interior decoration of apartments installation of internal engineering networks landscaping the completed stage compliance with measures to ensure access for low-mobility groups of the population to ensure fire sanitary and epidemiological safety and construction materials used during the construction reconstruction of the capital construction facility as well as the results of such work with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code with taking into account the changes made to the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or the information model, if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction projects for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility construction with metering devices for used energy resources2 Verification of the completed construction object3 Availability of a construction permit 4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741904028756
Unscheduled inspection
Start date: 2019-11-29, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741903939746
Unscheduled inspection
Start date: 2019-11-12, end date: 2019-11-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of structures of the 710th floor, the installation of brick partitions, the completed stage, the installation of the roof, the installation of elevators of internal engineering networks during the work and the construction materials used during the construction of the reconstruction of the capital construction facility, as well as the results of such work, with the requirements of the project documentation approved in accordance with parts 15 152 and 153 of Article 48 of this Code, taking into account changes included in the project documentation in accordance with parts 38 and 39 of Article 49 of this Code and or an information model if the formation and maintenance of an information model are mandatory in accordance with the requirements of this Code, including energy efficiency requirements, with the exception of capital construction facilities for which energy efficiency requirements do not apply and the requirements of equipment of the capital construction facility with devices accounting for the energy resources used 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902913785
Unscheduled inspection
Start date: 2019-08-05, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902897200
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the pile foundation construction the completed stage on the foundation structures the completed stage and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902897187
Unscheduled inspection
Start date: 2019-07-30, end date: 2019-08-05, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the pile foundation construction the completed stage on the foundation structures the completed stage and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902870477
Unscheduled inspection
Start date: 2019-07-18, end date: 2019-07-24, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of elevator equipment After the actual completion of work Installation of small architectural forms installation of pits entrance to the basement installation of porches Landscaping of the house territory and building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation2 Prescription from 06062019g3 Availability of a construction permit 4 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902875349
Unscheduled inspection
Start date: 2019-07-22, end date: 2019-07-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of structures of 910 floors completed stage roof installation exterior facade installation of elevators external engineering networks completed stage and the construction materials used in the construction of a capital construction facility as well as the results of such work with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902839746
Unscheduled inspection
Start date: 2019-07-09, end date: 2019-07-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of a monolithic foundation during the production of works and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902755823
Unscheduled inspection
Start date: 2019-06-13, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902768945
Unscheduled inspection
Start date: 2019-06-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902768972
Unscheduled inspection
Start date: 2019-06-07, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902816581
Unscheduled inspection
Start date: 2019-06-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902751649
Unscheduled inspection
Start date: 2019-05-31, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902711961
Unscheduled inspection
Start date: 2019-05-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902659517
Unscheduled inspection
Start date: 2019-04-23, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741902659530
Unscheduled inspection
Start date: 2019-04-23, end date: 2019-04-29, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of basement wall blocks backfilling of the sinuses of the excavation with the installation of the basement the completed stage of the installation of structures of the 13th floor during the work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902603864
Unscheduled inspection
Start date: 2019-04-04, end date: 2019-04-10, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of load-bearing structures from the second to the fourth floor and the building materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902662949
Unscheduled inspection
Start date: 2019-04-24, end date: 2019-04-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of load-bearing structures from the fourth to the sixth floor and the construction materials used in the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902531095
Unscheduled inspection
Start date: 2019-03-14, end date: 2019-03-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of supporting structures of the basement and first floor and the construction materials used in the construction of the capital construction facility as well as the results of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902583575
Unscheduled inspection
Start date: 2019-03-21, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741902593657
Unscheduled inspection
Start date: 2019-03-29, end date: 2019-04-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the installation of the frame of the 45th floor with the installation of the walls of the basement and 1st floors the completed stage and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902471907
Unscheduled inspection
Start date: 2019-02-11, end date: 2019-02-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: fulfillment of the requirements of Article 31 of Federal Law No. 214 FZ of December 30, 2004 "On Participation in the Shared Construction of Apartment Buildings and Other Real Estate Objects and on Amendments to Certain Legislative Acts of the Russian Federation"
# 741902531170
Unscheduled inspection
Start date: 2019-02-26, end date: 2019-03-04, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of foundations waterproofing of foundations before the installation of the supporting structures of the basement and the building materials used during the construction of the capital construction facility as well as the results of the design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902376212
Unscheduled inspection
Start date: 2019-01-16, end date: 2019-01-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the installation of piles and building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902458645
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-02-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of works on drainage, pile driving, monolithic grillage, waterproofing, installation of basement wall blocks, backfilling of pit sinuses, installation of the base and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741902458668
Unscheduled inspection
Start date: 2019-01-28, end date: 2019-02-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of works on drainage, pile driving, monolithic grillage, waterproofing and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of design documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 2 3 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802215699
Unscheduled inspection
Start date: 2018-12-11, end date: 2018-12-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the excavation work and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741802127180
Unscheduled inspection
Start date: 2018-11-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802127163
Unscheduled inspection
Start date: 2018-11-21, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741802144553
Unscheduled inspection
Start date: 2018-11-26, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802017457
Unscheduled inspection
Start date: 2018-10-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741802018371
Unscheduled inspection
Start date: 2018-10-29, end date: 2018-11-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the excavation of the pile foundation and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801557891
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the foundation pit and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741801557885
Unscheduled inspection
Start date: 2018-09-26, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 741801557875
Unscheduled inspection
Start date: 2018-09-26, end date: 2018-10-02, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of compliance with the regulation dated 01082018 with a deadline of 10092018 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800573033
Unscheduled inspection
Start date: 2018-07-31, end date: 2018-08-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the excavation of the pile foundation and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800512810
Unscheduled inspection
Start date: 2018-07-12, end date: 2018-07-18, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the basement of the frame of the 2nd and 3rd floors with the walls of the 1st floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800385546
Unscheduled inspection
Start date: 2018-05-28, end date: 2018-06-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of elevators, the device of finishing works, compliance with fire protection measures, compliance with epidemiological measures, compliance with ODMGN measures, landscaping and construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation 2 Verification of the completed construction of the facility 3 Availability of a construction permit 4 Compliance with the requirements of hh 23 and 31 st52 Urban Planning the Code of the Russian Federation
# 741800273512
Unscheduled inspection
Start date: 2018-04-19, end date: 2018-04-25, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of the work on the installation of the basement of the 1st floor frame and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of the technical regulations of the project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 741800201612
Unscheduled inspection
Start date: 2018-03-19, end date: —, duration: —
Authority: —
Purpose of inspection:
# 741800212513
Unscheduled inspection
Start date: 2018-03-23, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74180803057766
Unscheduled inspection
Start date: 2018-01-24, end date: 2018-01-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Compliance of work on the insulation of the technical floor installation of internal engineering networks and building materials used in the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation 2 Availability of a construction permit 3 Compliance with the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802913488
Unscheduled inspection
Start date: 2017-12-05, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 00170802986473
Unscheduled inspection
Start date: 2017-12-26, end date: 2017-12-26, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: This inspection is carried out in order to issue a permit for the commissioning of power plants on the basis of an application from the head of the department of the customer of the builder of JSC YUU KZHSI ex 072124127 from 04122017 vh 417210 from 05122017 The objectives of this inspection are to carry out measures to control the technical condition and safe operation of the power supply of a residential building page 14 at the address Chelyabinsk Krasnopolskaya site microdistrict 50 The subject of this inspection is the compliance of the information contained in the application and documents of a legal entity or an individual entrepreneur for granting the legal status of a special permit license for the right to carry out certain types of activities or permit approval for the implementation of legally significant actions if the conduct of an appropriate unscheduled inspection of a legal entity individual entrepreneur is provided for by the rules for granting the legal status of a special permit license issuance of a permit approval of mandatory requirements as well as data on these legal entities and individual entrepreneurs contained in the unified state register of legal entities the unified state register of individual entrepreneurs and other federal information resources
# 00170803008963
Unscheduled inspection
Start date: 2017-12-22, end date: 2017-12-22, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: monitoring of the technical condition and safe operation of thermal power plants and heating networks
# 74170802798632
Unscheduled inspection
Start date: 2017-11-07, end date: 2017-11-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the 37th floor and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802872522
Unscheduled inspection
Start date: 2017-11-27, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170802773627
Unscheduled inspection
Start date: 2017-11-01, end date: 2017-11-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the fulfillment of the prescription dated 03102017 validity period 301020172the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802815742
Unscheduled inspection
Start date: 2017-11-13, end date: 2017-11-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of internal engineering networks and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802674959
Unscheduled inspection
Start date: 2017-10-16, end date: 2017-10-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of translucent structures and building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170802159403
Unscheduled inspection
Start date: 2017-09-11, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802597505
Unscheduled inspection
Start date: 2017-09-27, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170802538671
Unscheduled inspection
Start date: 2017-09-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170801917191
Unscheduled inspection
Start date: 2017-08-28, end date: 2017-09-01, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of the basement of the 37th floor and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701858906
Unscheduled inspection
Start date: 2017-08-07, end date: 2017-08-11, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the work on the installation of a monolithic grillage and the construction materials used during the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 and 31 st52 of the Urban Planning Code of the Russian Federation
# 74170701858902
Unscheduled inspection
Start date: 2017-08-07, end date: —, duration: —
Authority: —
Purpose of inspection:
# 00170701820716
Unscheduled inspection
Start date: 2017-07-20, end date: 2017-07-20, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 74170701685482
Unscheduled inspection
Start date: 2017-06-19, end date: 2017-06-23, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the monolithic grillage device and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of the technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 00170701716614
Unscheduled inspection
Start date: 2017-06-13, end date: 2017-06-14, duration: —
Authority: Uralskoe upravlenie Federalnoi sluzhby po ekologicheskomu tehnologicheskomu i atomnomu nadzoru
Purpose of inspection: issuance of a permit for the commissioning of power plants
# 74170701647403
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701623543
Unscheduled inspection
Start date: 2017-05-29, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701543293
Unscheduled inspection
Start date: 2017-04-21, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701459534
Unscheduled inspection
Start date: 2017-03-17, end date: 2017-04-13, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of a capital construction facility completed 2The receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701448034
Unscheduled inspection
Start date: 2017-03-16, end date: 2017-03-22, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of pile works and construction materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701421197
Unscheduled inspection
Start date: 2017-03-03, end date: —, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection:
# 74170701460188
Unscheduled inspection
Start date: 2017-03-20, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74170701361273
Unscheduled inspection
Start date: 2017-02-09, end date: 2017-02-15, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The presence of a construction permit 2The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code RF3THE compliance of the work on the foundation pit and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation
# 74170701331289
Unscheduled inspection
Start date: 2017-01-31, end date: 2017-02-06, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of translucent structures and building materials used in the construction of a capital construction facility, as well as the results of such work, with the requirements of technical regulations of project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74170701320116
Unscheduled inspection
Start date: 2017-01-25, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701238206
Unscheduled inspection
Start date: 2016-12-26, end date: 2016-12-30, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The presence of a construction permit 2The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code RF3THE compliance of the work on the insulation of those floors and the building materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation
# 74160701043306
Unscheduled inspection
Start date: 2016-11-01, end date: 2016-11-08, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1 Verification of the actual condition of the object2the receipt of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160701110587
Unscheduled inspection
Start date: 2016-11-22, end date: —, duration: —
Authority: —
Purpose of inspection:
# 74160701021110
Unscheduled inspection
Start date: 2016-10-24, end date: 2016-10-28, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The presence of a construction permit 2The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code RF3THE compliance of the installation of the 1417th floor and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of the project documentation
# 74160700712044
Unscheduled inspection
Start date: 2016-09-20, end date: 2016-09-26, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The compliance of the installation of the 1013rd floor and the construction materials used in the construction of the capital construction facility, as well as the results of such work, with the requirements of technical regulations of the project documentation2the presence of a construction permit 3The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation
# 74160700825042
Unscheduled inspection
Start date: 2016-09-27, end date: 2016-10-17, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The receipt of a construction permit 2The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation 3The verification of the completed construction of the object
# 74160700292491
Unscheduled inspection
Start date: 2016-09-14, end date: 2016-09-20, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The presence of a construction permit 2The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code of the Russian Federation 3The compliance of the work on the installation of elevators and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation4the compliance of the work on the installation of external engineering networks and the construction materials used during the construction of the capital construction facility as well as the results of such work with the requirements of technical specifications regulations of the project documentation
# 74160601788646
Unscheduled inspection
Start date: 2016-08-15, end date: 2016-08-19, duration: —
Authority: Ministerstvo stroitelstva i infrastruktury CHelyabinskoi oblasti
Purpose of inspection: 1The presence of a construction permit 2The fulfillment of the requirements of hh 23 st52 of the Urban Planning Code RF3THE compliance of the installation of internal engineering networks and building materials used during the construction of a capital construction facility as well as the results of such work with the requirements of technical regulations of project documentation