# 64160700824715
Unscheduled inspection
Start date: 2016-09-30, end date: 2016-10-10, duration: —
Authority: Glavnoe upravlenie MCHS Rossii po Saratovskoi oblasti
Purpose of inspection: control over the implementation of the regulation GPN 168811 dated 29/12/2015 on the elimination of violations of fire safety requirements on the implementation of measures to ensure fire safety at protection facilities and to prevent the threat of fire